Submit Monthly Operating Report for the Month of June 1975
ML19105A333
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/09/1975
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Reactor Regulation
References
Serial No. 565/021974
Download: ML19105A333 (8)


Text

.. : ..... : ' ..

e VIRGIN.IA ELECTRIC AND POWER COMPANY

      • =*

Office of Plans and Schedules Division of Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555 .Docket Nos .0-*

50-28 License Nos. PR-32 DPR-37

Dear Sir:

,'*

Operating information for Surry Unit Nos. 1 and 2 for the month of June 1975 is attached.

Very truly yours,

~ ) / ) / ) . /_)_ -? ~ '

. a;,// /J t. ~ 7c{a~.-t'.L~

C. M. Stallings Vice President-Power Supply and Production Operations Attachment cc: Mr. Norman C. Moseley

e e ..

.,

DOCKET NO. 50-280 UNIT Surry Unit No. 1 DATE July 2, 1975 COMPLETED BY W. C. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH JUNE AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 1 746.6 17 737.1 2 746.4 18 734.5 .

3 750.4 19 737.0 4 748.4 20 737.6 5 764.4 21 726. 7 6 748.6 22 743.6 7 748.6 23 744.2 8 711.5 24 367.5 9 748.8 25 0 10 748.8 26 0 11 682.7 27 377 ~ 1 12 750.4 28 651.8 746.9 13 29 ..'748. 3 14 734.6 30 746.2 15 740.4 31 16 739.1 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt. *

  • These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the*net electrical rating of the unit, there may ,be occasions when the daily average power level exceeds the I 00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

e e  ;~

  • UNIT Surry Unit No. 1 DATE July 2, 1975 COMPLETED BY w. c. Earl r

DOCKET NO. 50-280 OPERATING STATUS I. REPORT!:S:G PERIOD: 0001 750601 THROUGH 2400 750630 HOURS IN REPORTING l'ERIOD: _ _ 7_2_0_____~ - - - - - - - - - - - - - - - - - - - -

2. C'URRENTL Y AUTHORIZED POWER LEVEL (MW th) 24 41 MAX. DEPENDABLE CAPACITY (MWc-NET) _7~8~8'----
3. LOWEST POWER LEVEL TO \\'l!JCH SPECIFICALLY RESTRICTED (IF ANY) (MWc-NET): _ _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

TIIIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

5. .HOURS REACTOR WAS CRITICAL . . . . . . . - . * . . . 662.3 3428.6 14,153
6. REACTOR RESERVE SHUTDOW:--: HOURS . . . . . . . 0 0 0
7. HOURS GENERATOR ON LINE . . . . . . . . . . . . . . . 660.8 3157.8 13,575.3
8. UNIT RESER VE SHUTDOWN HOURS . . . . . . . . . . . 0 0 0
9. GROSS THER~lAL ENERGY

'

GENERA TED (MWH) . . . . . . . . . . . . . . . . * . . .

  • 1,566,410 7,448,665 29,504,075>,

JO .. GROSS ELECTRICAL ENERGY CENERA TFD {MWH) . . . . . . . . . . . . . * . . * * . *

  • 502,800 2,435,770 9,763,533
11. NET ELECTRICAL ENERGY GESERATED (MWB) .... _ ..*.*...............*.. _ 477,277 l.,_315, 12Lf 9,245,477
12. REACTOR AVAILABILITY FACTOR (1) . * * . * . . *
  • 92 78.9 64 .0
13. UNIT AVAILABILITY FACTOR (2) * . . . . . . . * * .
  • 9], 8 _J_J._J_ 61. 9c
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . _ . . . . . . 84.1 67.6 53.1
15. UNIT FORCED OUTAGE RATE (-l) . . . . . . * . . . . . 8.2 5.7 25.8
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION or EACH):

Scheduled refueling October 15 1975. * *

17. Ir SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE or STARTUP: _ _ _ _ _ _ _ _ _ _ _ __
18. UNITS IN TEST STATUS (PRIOR TO CO!v!:.lERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I) REACTOR AVAILABILITY FACTOR X.100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR - - - - - - - - - - - - - x 100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR *-------------------

MAX. DEl'ENDAJ3LE CAPACITY (MWc-NET) X HOURS IN REPORTING l'l:RIOIJ FORCED OUTAGE HOURS (4) UNIT FORCED OUTAGE RATE - - - - - - - - - - - - - - - - - - - - - X JOO HOURS GENERA TOR ON LINE+ FORCED OUTAGE HOURS

  • Corrected figure-Corrected error carried forwarded since February 1975

DOCKET NO. _s_o_-2_8_0_ _ __

UNIT SHUTDOWNS UNIT NAME Surry Unit No. 1 DATE July 2, 1975 COMPLETED BY W* C

  • Earl REPORT MONTH _ _ JU_N_'E_ _ _ __

TYPE METHOD OF F*FORCED DURATION e

~HUTTING DOWN NO. DATE S*SCHEDULED (HOURS) REAS0N(1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS 75-17 062475 F 59.2 A 1 Equipment failure was a packing failure of MOV-RH-1700 resulting in excessive primary coolant leakage.

(1) REASON (2) MJ,:THOD A EQUIPMENT FAILURE (EXPLAIN) !_:MANUAL

. ..... - B MAINT. OR TEST

(' REFUELING D- REGULATORY RESTRICTION 2-M*ANUAL SCRAM 3--A UTOMA TIC e

E- Ol'EllATOR TRAINING AND SCRAM LICENSE EXAMINATION r--ADMINISTRATIVE G- OPERATIONAL ERROR

-- (EXPLAIN)

H--OTIII-:R (EXl'l.AIN)

. '

SUMMARY


............ l~>.

e e r DOCKET NO. 50-281 UNIT Surry Unit No. 2 DATE July 2, 1975 COMPLETED BY W. C. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH~_J_U_N_E~~~~~~~

AVERAGE DAILY POWER LEVEL AVERAGE DAILY PO\VER LEVEL DAY (MWe-net) DAY (MWe-net) 1 0 17 23.2 2 0 18 288.4 3 0 19 544.3 4 0 20 701.3 5 0

  • 21 725.5 6 0 22 729.6 7 0 23 751. 2 8 0 24 751. 5 9 0 25 744.7 10 0 26 746.1 -

11 0 27 749.5 12 0 28 752.5 13 0 29 ' 754.1 14 0 30 747.7 15 0 31 16 0 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level" in MWe-net for each d?Y in the reporting month.

Compute to the nearest whole megawatt.

  • These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the dJily average power level exceeds the 100% line (or the restricted power level line). In such cases, thl' average daily unit power output sheet should be footnoted to explain the apparent anomaly.

.e  ;~

UNIT Surry Unit No. 2 DATE July 2, 1975 COMPLETED BY W* C, Ear 1 DOCKET No._ 5 _0_-_ 2_8 _1_ _ _ __

OPERATING STATUS

l. REPORTING PERIOD:. _ _ 0_00_1_ _7_5_0_6_0_1______ THROUGH _2_4..:....0c....0=-----"7...::5.....:0.....:6..;::3...::0_ _ _ __

HOURS IN REPORTING PERIOD: __7_2_0_____- , - - , - - - - - - - - - - - - - - - - - - - - - -

2. CURRENTL Y AUTHORIZED ~OWER LEVEL (MWth) 2441 MAX. DE~ENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ _ __

. 4. REASONS FOR RESTRICTION (IF A~Y):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

5. .HOURS REACTOR WAS CRITICAL.: . . . . . . . . . . . 385.4  ;

3007.1 11,516.1

6. REACTOR RESERVE SHUTDOW;\ HOURS . . . . . . . 0 0 304.3
7. HOURS GE!':ERATOR ON LINE . . . . . . . . . . . . . . . 317.6 2881. 2 _1L265.4
8. UNIT RESERVE SHUTDOWN HOURS . . . . . . . . . . . 0 0 0
9. GROSS THER~1AL ENERGY GENERA TED (:'>fWH) . . . . . . . . . . . . . . . . . . . . . 720,968 6,621,747 24,846,536 JO. GROSS ELECTRICAL ENERGY GENERA TED (;\!WH) . . . . * * * . * * . . . * ** * * . * *
  • 228,827 2,173,462 821952929
11. NET ELECTRICAL ENERGY GE!'iERATED (MWHJ 216,234 2,062,954 7,762,253
12. REACTOR AVAILABILITY FACTOR()) . . . . * . ; .. 53.5 69.2 60.7
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . . . .

44.1 66.3 59.3

14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . . .

38.1 60.3 51. 9

15. UNIT FORCED OUTAGE RATE(4) . . . . . . . . . . . . 3.0 4.3 23.9
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUTDOWN AT END OF REPORTPERIOD,ESTIMATEDDATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ _ __
18. UN°1TS IN TEST STATUS (PRIOR TO co:-.1:-.fERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY

-INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAlLABILITY FACTOR X.100 HOURS IN REPORTING l'ERlOD HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR = - - - - - - - - - - - - - x 100 HOURS IN REPORTING PERIOD NET ELTTTH!CAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY lMWc-NET) X HOURS IN REl'ORTINC.i l'l:IUOD FORCED OUTAGE HOURS (4) UNIT FORCED OlITAGE RATE - - - - - - - - - - - - - - - - ' - - - - - - - - x 100 HOURS GENERATOR ON LINE+ FORCl:D OUT1\GE HOURS

Page.!_ of  !

DOCKET NO. _s_o_-2_8_1_ _ __

UNIT SHUTDOWNS . UNIT NAME Surry Unit No. 2 -

DATE July 2, 1975 COMPLETED BY W* C* Earl REPORT MONTH _ _c:...JU.:.;;N:.:..E_ _ _ __

-

TYPE METHOD OF F-FORCED DURATION $HUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS 75-7 042675 s. 392.3 C 1 Refueling 75...:s 06157.5 F 3.8 G 3 Reactor trip caused by high steam flo~

with low Tavg resulting from unequal pressure between steam generator and header and rapid header isolation valve opening.

75-9 061675 F 4.0 A 3 Malfunction of EilC caused turbine.to roll at a high rate as the governor valves opened spiking 1st stage pressure above 15 per cent which tripped turbine.

Turbine trip, caused reactor t~ip.

(IJ.JU::ASON (2) 'METHOD 1* MANUAL

...... A EQUll'MENT FAILURE (EXPLAIN)

B i\lAINT. (.)R TEST C- REFUELING D-REGl'LATORY RESTRICTION 2 - MANUAL SCRAM 3-,AUTOMATIC e

E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

H-OTIIER (EXPLAIN)

SUMMARY

Page I of I DOCKET NO. =-50=---=2-=-8::.. 1- - - " " "

UNIT SHUTDOWNS UNIT NAME Surry Unit No. 2 -

DATE July 2, 1975 COMPLETED BY W. C. Earl REPORT MONTH JUNE


TYPE METHOD OF F-FORCED DURATION $HUTTING DOWN NO. DATE S-SCHEDU LED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS 75-10 061775 F 2.2 A 3 Turbine control valves opened rapidly spiking first stage pressure above 15.

per cent tripping turbine. Reactor trip by turbine trip. EH control system mal-function.

(!) REASON . (2), METHOD .

..... A EQUIPMENT FAILURE (EXPLAIN)

B

  • MAIN'[, OR TEST I-MANUAL 2-MANUAL C- REFUELING srn.AM D-REGULATORY RESTRICTION 3--.AUTOMATIC E-Ol'ERATOR TRAINING AND SCRAM LIC'ENSE EXAMINATION F-ADMIN!STRATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

  • I

SUMMARY