MONTHYEARML24281A1322024-10-0404 October 2024 University of Missouri - Notification of NIST Award 60NANB23D160 NEPA Catex ML24270A0992024-10-0101 October 2024 Examination Confirmation Letter No. 50-186/Ol-25-01, University of Missouri - Columbia ML24142A1422024-08-27027 August 2024 Examination Report Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24142A1432024-08-27027 August 2024 Examination Result Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24184A1132024-07-0202 July 2024 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.10.d IR 05000186/20242012024-05-29029 May 2024 the Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2024201 05000186/LER-2024-001, Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d2024-05-23023 May 2024 Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d ML24081A1332024-04-0202 April 2024 University of Missouri-Columbia (MURR) – Change of Facility Project Manager ML24044A1162024-03-0101 March 2024 Examination Confirmation Letter No. 50-186/OL-24-02, University of Missouri-Columbia ML24064A1922024-03-0101 March 2024 Federal Funding for the Conversion of the University of Missouri-Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel ML24059A4412024-02-28028 February 2024 Univ. of Missouri - Columbia - Submittal of Annual Operating Report Technical Specification 6.6.e IR 05000186/20232022023-12-12012 December 2023 the Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023202 ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23221A1172023-08-0303 August 2023 Written Communication as Specified by 10 CFR 50.4(b)(4) Regarding the Submittal of the Physical Security Plan for the University of Missouri Research Reactor as a Part of the Process to Renew Amended Facility Operating License R-103 ML23213A0592023-08-0101 August 2023 Written Communication as Specified by University of Missouri Research Reactor Technical Specification 6.6.2(d) Regarding a Permanent Change in the Facility Organization Involving the Executive Director IR 05000186/20232012023-07-31031 July 2023 the Curators of the University of Missouri U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023201 ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23103A0742023-04-10010 April 2023 University of Missouri, Columbia Research Reactor, Shipment of Radioactive Material Shipment Identifier MURR 23-01 Highway Route Controlled Quantity ML23024A2772023-04-0707 April 2023 Cover Letter for the Security Inspection Report for the University of Missouri (Public) - October 2022 ML23089A3162023-03-29029 March 2023 Letter Notifying Univ. of Missouri That Us Dept. of Energy Funding Will Not Be Available in Fiscal Year 2023 to Complete the Conversion of MURR to LEU Fuel ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23055B1372023-02-24024 February 2023 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e IR 05000186/20222022023-02-23023 February 2023 the Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2022202 - Cover Letter and Enclosure ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML23017A2072023-01-13013 January 2023 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 6.1.f ML22349A0422022-12-0808 December 2022 Written Communication as Specified in 10 CFR 50.54(b)(5) Regarding Changes to the University of Missouri-Columbia Research Reactor Facility Emergency Plan Without Prior Commission Approval Pursuant to 10 CFR 50.54(q)(3) ML22314A2102022-11-0909 November 2022 Written Communication as Required by Technical Specification 6.6.d(2), Other Reports, Regarding a Change in University of Missouri-Columbia Research Reactor Organization Involving the Reactor Facility Director ML22304A0042022-10-27027 October 2022 University of Missouri - Columbia, Shipment of Radioactive Material, Highway Route Controlled Quantity ML22291A0322022-10-14014 October 2022 University of Missouri Written Communication as Required by 10 CFR 73, Appendix G Regarding a Deviation from the MURR Physical Security Plan ML22290A0042022-10-12012 October 2022 University of Missouri-Columbia Research Reactor, Reportable Event Report Pursuant to 20.2201(a)(ii) Regarding Loss of Licensed Material During Shipment IR 05000186/20222012022-06-14014 June 2022 the Curators of the University of Missouri - U.S. NRC Routine Inspection Report No. 05000186/2022201 ML22158A0792022-06-0606 June 2022 Submittal of Revised Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22097A0592022-04-0707 April 2022 Approval for Spent Nuclear Fuel Highway Route Application - NRC Route No. 182D - Docket Number 050-0186 ML22088A0782022-03-25025 March 2022 Univ. of Missouri, Federal Funding for the Conversion of the Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel IR 05000186/20212032022-03-0202 March 2022 the Curators of the University of Missouri U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2021203 ML22056A5162022-02-25025 February 2022 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22038A6012022-02-0808 February 2022 Acceptance for Spent Nuclear Fuel Highway Route Application NRC No. 182D-Docket No. 050-0186 ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia ML21327A3042021-11-23023 November 2021 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.f.6 ML21298A1972021-10-25025 October 2021 University of Missouri-Columbia Research Reactor - Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.g.6 ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21221A3252021-08-0909 August 2021 University of Missouri-Columbia Research Reactor, Written Communication as Required by Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specifications 3.2.a ML21217A2982021-08-0505 August 2021 University of Missouri-Columbia Research Reactor - Reportable Event Report Pursuant to 20.2203(a)(2)(iv) ML21215A4982021-07-0707 July 2021 Univ of Missouri, Submittal of Revised Road Transportation Security Plan for the Shipment of Irradiated Reactor Fuel ML21098A1992021-06-10010 June 2021 the Curators of the University of Missouri Issuance of Amendment No. 40 to Renewed Facility Operating License No. R 103 to Amend Technical Specifications 6.2 and 6.4 for the University of Missouri Columbia Research Reactor IR 05000186/20212022021-05-28028 May 2021 the Curators of the University of Missouri - U.S. Nuclear Commission Routine Inspection Report No. 05000186/2021202 IR 05000186/20212012021-05-27027 May 2021 University of Missouri-Columbia U. S. Nuclear Regulatory Commission Security Inspection Report No. 05000186/2021201 - Non-OUO-Sri Cover Letter 2024-08-27
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0535500332005-12-12012 December 2005 November 2005 Operating Report for University of Missouri-Columbia Research Reactor ML0532900992005-11-14014 November 2005 October 2005 Monthly Operating Report for University of Missouri - Columbia Research Reactor ML0529902852005-10-14014 October 2005 September 2005 Monthly Operating Report for University of Missouri ML0526303392005-09-0909 September 2005 August 2005 Monthly Operating Report for University of Missouri Research Reactor ML0522902712005-08-0808 August 2005 July 2005 Monthly Operations Summary for University of Missouri Columbia Research Reactor ML0520200662005-07-0808 July 2005 June 2005 Monthly Operating Report for University of Missouri - Columbia Research Reactor ML0518703492005-06-20020 June 2005 May 2005 Monthly Operating Report for University of Missouri- Columbia Research Reactor ML0514502802005-05-13013 May 2005 April 2005 Monthly Operating Report for University of Missouri- Columbia Research Reactor ML0511703642005-04-18018 April 2005 March 2005 Monthly Operating Report for University of Missouri Research Reactor ML0505503112005-02-15015 February 2005 January 2005 Monthly Operating Report for University of Missouri Research Reactor Facility ML0502101962005-01-0707 January 2005 December 2004 Monthly Operating Report for University of Missouri Research Reactor Facility ML0435802382004-12-10010 December 2004 November 2004 Monthly Operating Report for University of Missouri Research Reactor Facility ML0432702102004-11-11011 November 2004 October 2004 Monthly Operating Report for University of Missouri Research Reactor Facility ML0429904612004-10-12012 October 2004 September 2004 Monthly Operations Report for University of Missouri Research Reactor Facility ML0428206152004-09-24024 September 2004 August 2004 Monthly Operating Report for the University of Missouri-Columbia Research Reactor Facility ML0423900832004-08-18018 August 2004 July 2004 Monthly Operating Report for University of Missouri Research Reactor Facility ML0420302892004-07-13013 July 2004 June 2004 Monthly Operating Report for University of Missouri Research Reactor Facility ML0414801392004-05-13013 May 2004 April 2004 Monthly Operating Report for University of Missouri-Columbia Research Reactor Center ML0407902462004-03-11011 March 2004 February 2004 Monthly Operating Report for University of Missouri Research Reactor ML0407803072004-03-0202 March 2004 January 2004 Monthly Operating Report for Univ of Missouri Research Reactor ML0402307052004-01-12012 January 2004 December 2003 Monthly Operating Report for University of Missouri-Columbia Research Reactor Center ML0400606252003-12-22022 December 2003 November 2003 Monthly Operating Report for the University of Missouri-Columbia Research Reactor Center ML0335806022003-11-17017 November 2003 October 2003 Monthly Operating Report for Univ of Missouri Research Reactor Center ML0330304522003-10-17017 October 2003 September 2003 Monthly Operating Report for Univ of Missouri-Columbia ML0325213632003-08-19019 August 2003 July 2003 Monthly Operating Report for University of Missouri Research Reactor ML0317004812003-06-11011 June 2003 May 2003 Monthly Operating Report for University of Missouri Research Reactor ML0314302682003-05-15015 May 2003 April 2003 Monthly Operating Report for University of Missouri ML0311206212003-04-0707 April 2003 March 2003 Monthly Operating Report for University of Missouri-Columbia Research Reactor ML0307204212003-03-0606 March 2003 February 2003 Monthly Operating Report for University of Missouri Research Reactor ML0305702842003-02-0707 February 2003 January 2003 Monthly Operating Report for Univ of Missouri-Columbia ML0302402732003-01-10010 January 2003 December 2002 Monthly Operating Report for University of Missouri Reseach Reactor ML0300900982002-12-30030 December 2002 November 2002 Monthly Operating Report for MURR ML0232303492002-11-0505 November 2002 September 2002 Monthly Operating Report for University of Missouri - Columbia Reactor ML0224902142002-08-29029 August 2002 July 2002 Monthly Operating Report for Univ of Missouri Research Reactor ML0222002252002-07-23023 July 2002 June 2002 Monthly Operating Report for University of Missouri Research Reactor ML0217600242002-06-10010 June 2002 April 2002 Monthly Operating Report for Univ of Missouri-Columbia, Research Reactor Center ML0214104282002-04-29029 April 2002 March 2002 Monthly Operating Report for University of Missouri-Columbia Research Reactor Center ML0209502952002-03-15015 March 2002 February 2002 Monthly Operating Report for University of Missouri Research Reactor ML0202901932002-01-22022 January 2002 December 2001 Monthly Operating Report for the University of Missouri-Columbia 2005-09-09
[Table view] |
Text
Research Park Research Reactor Center Columbia, MO 65211 University of Mlissouri-Columbia PioNE (573) 882421 1 FAX (573) 882-6360 January 7, 2005 Mr. Alexander Adams, Jr.
U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001
SUBJECT:
University of Missouri Research Reactor Facility Docket No. 50-186 Monthly Operations Summary
Dear Mr. Adams:
Enclosed is a copy of MURR's Monthly Operations Summary for December 2004. If you have any questions, please contact me at (573) 882-5276.
Sincerely, S4f2 Leslie P. Foyto Reactor Manager LPF/djr Enclosure A:::
- k AN EQUAL OPPORTNTrY/ADA ImSrrvmo.lN
UNIVERSITY OF MISSOURI RESEARCH REACTOR-OPERATIONS MONTHLY
SUMMARY
December 2004 Prepared by:
Operations Staff
INTRODUCTION The reactor operated continuously in December with the following exceptions: four shutdowns for scheduled maintenance and refueling; one unscheduled shutdown.
MAINTENANCE ACTIVITIES 12/6/04 Refueled - removed core 04-56, loaded core 04-57.
Replaced the Primary Coolant Demineralization System inlet filters.
12/13/04 Refueled - removed core 04-57, loaded core 04-58.
Replaced the Pool Coolant Skimmer System filters.
Replaced the jog/stop switch for Secondary Coolant System pump P-i.
Realigned the motor and pulley on the Emergency Air Compressor.
12/20/04 Refueled - removed core 04-58, loaded core 04-59.
12/21/04 Replaced the blower starter contactor for the NMC Model RAK Stack Monitor.
12/27/04 Refueled - removed core 04-59, loaded core 04-60.
Completed Modification Record 75-16, Add. 2; Relocation of the Reactor Safety System Monitoring Circuit ("White Rat") Panel.
Replaced the control circuit fuse for Cooling Tower Fan CF-3.
Page 2 of 3
UNSCIHEDULED SHUTDOWNS Date No. Type Cause 12-20-04 1175 Rod Run In Nuclear Instrument Channel 6 High Power.
Rod Run In On December 20, 2004, a Nuclear Instrumentation (NI) Channel 6 High Power Rod Run-In occurred during a reactor startup. The operator had attempted to place the reactor in automatic control at 10 MW with Channel 6 indication too close to the high power rod run-in set point of 114%. The Wide Range channel, the NI channel that provides the output signal for automatic reactor control, was indicating approximately 15% lower than Channel 6 indication. The reactor was shutdown and checks of Channel 6 were performed to verify proper operability. Actual power, as recorded by the remaining NIs and displayed by the real-time power calculator, was less than 10 MW at time of the rod run-in. The reactor was subsequently returned to 10 MW operation. The operators involved were coached on the importance of being conservative on the approach to 10 MW and placing the reactor in automatic control during this sensitive transient period.
Page 3 of 3
Dec 0 -
OPERATION
SUMMARY
FOR MONTH OF I Dec l1 University of Missour Research Reactor Center (MURR)
HOURS OPERATED THIS PERIOD 1 684.38 TOTAL HOURS OPERATED, REACTOR .1 263,216.22 HOURS OPERATED AT FULL POWER, THIS PERIOD L 682.70 -
TOTAL HOURS AT FULL POWER, REACTOR l 259,873.00. l INTEGRATED POWER THIS PERIOD 1 284.56 l MWD TOTAL INTEGRATED POWER, REACTOR l 102,481.69 l MWD
.- - . Submitted by:
MWD Custodian/Reactor Physicist I t3 10 Date: