ML050550311
| ML050550311 | |
| Person / Time | |
|---|---|
| Site: | University of Missouri-Columbia |
| Issue date: | 02/15/2005 |
| From: | Foyto L Univ of Missouri - Columbia |
| To: | Alexander Adams Office of Nuclear Reactor Regulation |
| References | |
| Download: ML050550311 (4) | |
Text
Research Reactor Center University of Missouri-Columbia Research Park Columbia, MO 65211 PioNE (573) 882-4211 FAX (573) 882-6360 February 15, 2005 Mr. Alexander Adams, Jr.
U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001
SUBJECT:
University of Missouri Research Reactor Facility Docket No. 50-186 Monthly Operations Summary
Dear Mr. Adams:
Enclosed is a copy of MURR's Monthly Operations Summary for January 2005. If you have any questions, please contact me at (573) 882-5276.
Sincerely, rowto
'<Leslie P. Foyto Reactor Manager LPF/djr Enclosure 1JV-q AK EQUAL oPPOR-UIlTT/ADA INSmTImTON
UNIVERSITY. OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY
SUMMARY
miary 2005 Ja3 Prepared by:
Operations Staff
/l INTRODUCTION The reactor operated continuously in January with the following exceptions: 5 shutdowns for scheduled maintenance and refueling.
MAINTENANCE ACTIVITIES 1/3/05 Refueled - removed core 04-60, loaded core 05-01.
Replaced shaft keeper key on motor coupling for Cooling Tower Fan CTF-3.
1/10/05 Refueled - removed core 05-01, loaded core 05-02.
Completed CP-31 (Calibration of the Eberline Radiation Stack Monitor)
Adjusted Pool Coolant Heat Exchanger Bypass Valve S-2 linkage to 800 rotation for better pool cooling control.'
1/17/05 Refueled - removed core 05-02, loaded core 05-03.
Replaced the Pool Coolant Demineralizer System inlet filters.
1/18/05 Cleaned the Secondary Coolant System pump SP-3 inlet strainer.
1/24/05 Refueled - removed core 05-03, loaded core 05-04.
1/31/05 Refueled - removed core 05-04, loaded core 05-05.
Replaced the flange gaskets, studs, nuts, and diaphragms around the Primary
D&ineralizei System inlet-filtef housing.
Replaced the High Pressure isolation valve for DPS 928B (Primary Heat Exchanger Differential Pressure Transmitter).
OPERATION
SUMMARY
FOR MONTH OF University of Missour Research Reactor Center (MURR)
HOURS OPERATED THIS PERIOD,,.-..
TOTAL HOURS OPERATED, REACTOR HOURS OPERATED AT FULL POWER, THIS PERIOD TOTAL HOURS AT FULL POWER. REACTOR INTEGRATED POWER THIS PERIOD TOTAL INTEGRATED POWER, REACTOR I
Jan-05
.1 674.17 263,890.39 670.48 260,543.48 1
l 279.46 l MWD l
102,761.15 l MWD
.::D ys k Submitted by:
Date:
MWD Custodian/Reactor Physicist eR('(b.5,
I