October 2003 Monthly Operating Report for Univ of Missouri Research Reactor Center
ML033580602
Person / Time
Site: University of Missouri-Columbia
Issue date: 11/17/2003
From: Foyto L
Univ of Missouri - Columbia
To: Alexander Adams
Office of Nuclear Reactor Regulation
References
Download: ML033580602 (4)


Text

Research Reactor Center Research Park Columbia, MO 65211 W University of Missouri-Columbia PiiONE (573) 882-4211 FAX (573) 882-6360 November 17, 2003 Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Commission Mail Stocjp 012-G133 - -

Washington, DC 20555-0001

SUBJECT:

Monthly Operations Summary Enclosed is a copy of MURR's Monthly Operations Summary for October 2003. If you have any questions, please contact me at (573) 882-5276.

Sincerely, oc-'

Leslie Foyt flu Reactor Manager LM/sm cc. Craig Bassett Enclosure

.. .... .' ....I

I R.P

.. . . .. I .

-f'e2 I , . I. .I AN EQuAL oppFomTUrTV/AA wn~rrrrmoN

U1ffVESIwsf Of .ISSOUU IZESIEYRC3f REACTOR oPERATIoNS MON2TAY s'U-%ARy OCTOBER 2003

?reyared,§y:

Oyerations Staff

.  ; . . . .~

~-)

~~2~:; .

INTRODUCTION The reactor operated continuously in October with the following exceptions: 5 shutdowns for scheduled maintenance and refueling. Received notification from the NRC that one new Reactor Operator and three new Senior Reactor Operator licenses had been issued.

MAINTENANCE ACTIVITIES 10/06/03 Refueled - removed core 03-46, loaded core 03-47.

Shipped eight spent fuel elements to Savannah River Site.

10/13/03 Refueled - removed core 03-47, loaded core 03-48.

10/20/03 Refueled - removed core 03-48, loaded core 03-49.

..- 10/21/03 _--Refueled --removed core 03-49, loaded core 03-50.

10127/03 Refueled - removed core 03-50, loaded core 03-51.

OPERATION

SUMMARY

FOR MONTH OF Oct-03 University of Missour Research Reactor Center (MURR)

HOURS OPERATED THIS'PERIOD 676.49 -

TOTAL HOURS OPERATED, REACTOR 253,937.68 HOURS OPERATED AT FULL POWER, THIS PERIOD 674.26 TOTAL HOURS AT FULL POWER, REACTOR 250,637.22 INTEGRATED POWER THIS PERIOD 281.06 MWD TOTAL INTEGRATED POWER, REACTOR 98,631.77 MWD

_~~ - Atlas 1 Submitted by:

MWD CustodiarnReactor Physicist Date: I(( / l0 3 C-,