ML022200225

From kanterella
Jump to navigation Jump to search
June 2002 Monthly Operating Report for University of Missouri Research Reactor
ML022200225
Person / Time
Site: University of Missouri-Columbia
Issue date: 07/23/2002
From: Hobbs P
Univ of Missouri - Columbia
To: Alexander Adams
Office of Nuclear Reactor Regulation
References
Download: ML022200225 (4)


Text

Research Reactor Center University of Missouri-Columbia Research Park Columbia, MO 65211 PHONE (573) 882-4211 F.AX (573) 882-6360 July 23, 2002 Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Coissio Mail Stop 012-G13 r

Washington, DC 20555-01

SUBJECT:

Monthly Operations Summary Enclosed is a copy of MURR's Monthly Operations Summary for June 2002. If you have any questions, please contact me at (573) 882-5264.

Sincerely, Paul S. Hobbs, PE Reactor Manager PSH/djr cc. Craig Bassett Enclosure 0

AN EQUAL oppoRTuNrmj/ADA INSTITUTION

0 137 7'

m

INTRODUCTION The reactor operated continuously in June with the following exceptions: four shutdowns for scheduled maintenance and refueling.

MAINTENANCE ACTIVITIES 6/3/02 Refueled - removed core 02-27, loaded core 02-28.

Replaced valve diaphragms and flange gaskets for De-ionizing Tank DI 202 and the Storage Tank.

6/4/02 Loaded new pool de-ionization bed 'E'.

6/10/02 Refueled - removed core 02-28, loaded core 02-29.

Completed installation of new Dry Fire Main piping through the Containment Building Seal Trench.

Completed installation of a 2000KVA transformer as part of the facility electrical distribution system upgrade in accordance with Modification Record 02-01.

6/17/02 Refueled - removed core 02-29, loaded core 02-30.

Installed new Pool Flow Square Root Transmitters in accordance with Modification Record 0 1-4, Addendum No. 7.

5/24/02 Refueled - removed core 02-30, loaded core 02-31.

Loaded the CNS1-13G Waste Shipping Cask with old wedges for shipment to the Bamwell Site for disposal.

Replaced P501A (primary system pump) motor.

6/25/02

OPERATION

SUMMARY

FOR MONTH OF University of Missour Research Reactor Center (MURR)

HOURS OPERATED THIS PERIOD TOTAL HOURS OPERATED, REACTOR HOURS OPERATED AT FULL POWER, THIS PERIOD TOTAL HOURS AT FULL POWER, REACTOR INTEGRATED POWER THIS PERIOD TOTAL INTEGRATED POWER, REACTOR Submitted by:

Date:

I 602.26 I

I243,498.00 601.36 24,51.03 I20.67 MWD 94,301.59 MWD MWD Custodian/Reactor Physicist

-'/71 ifD2--

/

-ýT) 62-5