December 2001 Monthly Operating Report for the University of Missouri-Columbia
ML020290193
Person / Time
Site: University of Missouri-Columbia
Issue date: 01/22/2002
From: Hobbs P
Univ of Missouri - Columbia
To: Alexander Adams
Office of Nuclear Reactor Regulation
References
Download: ML020290193 (4)


Text

Research Reactor Center University of Missouri-Columbia Research Park Columbia, MO 65211 PHONE (573) 882-4211 FAX (573) 882-6360 January 22, 2002 Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Commission Mail Stop 012-D3 Washington, DC 20555-0001

SUBJECT:

Monthly Operations Summary Enclosed is a copy of MURR's monthly operations summary for December 2001. If you have any questions, please contact me at (573) 882-5264.

Sincel Paul S. Hobbs, PE Reactor Manager PSHI/djr Enclosure AN EQUAL OPPORTUNITY/ADA INSTITUTION

, (ý 'Vý Y"

ý\\01/

C

UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY

SUMMARY

December 2001 Prepared by:

Operations Staff

December 2001 The reactor operated continuously in December with the following exceptions: five shutdowns for scheduled maintenance and refueling.

Major maintenance items for the month included:

1. Performing biennial control blade offset mechanism change-out of position "C".
2. Installing a digital run-time meter in the Control Room for the emergency diesel generator.
3. Performing flange gasket and valve diaphragm refurbishment and replacement associated with DI-200 deionization tank.
4. Replacing the door control solenoids on the inner personnel airlock door (door 277).
5. Repairing a minor leak on secondary side of primary heat exchanger 503A.

MAINTENANCE ACTIVITIES Date 12/03/01 Refueled - removed core 01-56, loaded core 01-57.

12/10/01 Refueled - removed core 01-57, loaded core 01-58.

Completed biennial changeout of control blade offset mechanism "C".

12/17/01 Refueled - removed core 01-58, loaded core 01-59.

Installed digital run-time meter in the control room for the emergency diesel generator.

Refurbished and replaced flange gaskets and valve diaphragms associated with DI-200 deionization tank.

12/24/01 Refueled - removed core 01-59, loaded core 01-60.

Replaced the door control solenoids on the inner personnel airlock door (door 277).

12/31/01 Refueled - removed core 01-60, loaded core 01-61.

Completed repairs of a minor leak on the secondary side of primary heat exchanger 503A. This repair was to remove an existing epoxy patch and apply a new one. The existing patch had begun to seep slightly.

OPERATIONS

SUMMARY

HOURS OPERATED THIS PERIOD 663 TOTAL HOURS OPERATED 239,743 HOURS AT FULL POWER THIS PERIOD 659 TOTAL HOURS AT FULL POWER 236,514 INTEGRATED POWER THIS PERIOD 275 MWD TOTAL INTEGRATED POWER 92,743 MWD