ML040230705

From kanterella
Jump to navigation Jump to search
December 2003 Monthly Operating Report for University of Missouri-Columbia Research Reactor Center
ML040230705
Person / Time
Site: University of Missouri-Columbia
Issue date: 01/12/2004
From: Foyto L
Univ of Missouri - Columbia
To: Alexander Adams
NRC/NRR/DRIP/RNRP
References
Download: ML040230705 (4)


Text

Research Reactor Center Research Park Columbia, MO 65211 University of Missouri-Columbia PtioNE (573) 882-4211 FA-X (573) 882-6360 January 12, 2004 57s-o-IVP Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001

SUBJECT:

Monthly Operations Summary Enclosed is a copy of MURR's Monthly Operations Summary for December 2003. If you have any questions, please contact me at (573) 882-5276.

Sincerely, Reate Foyto Reactor Manager LM/sm cc. Craig Bassett Enclosure I R94 AN EQUAL OPPOrrUNrrY/ADA LNSITUTION

{UcERSIV 01 ~5LTSSO0NUR RESEARCHfPEACtOR oPE2.JtIoJ\\ms Mo tt1Ly sumN.vy DEC:EM3TR 2003 Preyaredby:

Operations Staff

F.,.

- li,,F I

INTRODUCTION The reactor operated continuously in December with the following exceptions: 5 shutdowns for scheduled maintenance and refueling.

MAINTENANCE ACTIVITIES 12/01/03 Refueled - removed core 03-55, loaded core 03-56.

Replaced FT-912C (Pool Demin) differential pressure transmitter with a new Rosemount model.1151 transmitter in accordance with Modification Record 03-2.

12/08/03 Refueled - removed core 03-56, loaded core 03-57.

Rebuilt V507B (Primary Isolation Valve) air actuator.

12/15/03 Refueled - removed core 03-57, loaded core 03-58.

Replaced A2 Driver Card in Nuclear Instrumentation Signal Processor Drawer #1.

Replaced oil seal on P5OlA (Primary Pump).

12/22/03 Refueled - removed core 03-58, loaded core 03-59.

12/29/03 Refueled - removed core 03-59, loaded core 03-60.

OPERATION

SUMMARY

FOR MONTH OF University of Missour Research Reactor Center (MURR)

HOURS OPERATED THIS PERIOD TOTAL HOURS OPERATED, REACTOR HOURS OPERATED AT FULL POWER. THIS PERIOD TOTAL HOURS AT FULL POWER, REACTOR INTEGRATED POWER THIS PERIOD TOTAL INTEGRATED POWER, REACTOR Submitted by:

)

M o

677.73 255,274.90 675.86 L 251,969.12 l

l 281.70

  • l MWD l

99,186.90 l MWD MWD Custodian/Reactor Physicist Jan or 0og Date: