April 2004 Monthly Operating Report for University of Missouri-Columbia Research Reactor Center
ML041480139
Person / Time
Site: University of Missouri-Columbia
Issue date: 05/13/2004
From: Foyto L
Univ of Missouri - Columbia
To: Alexander Adams
Office of Nuclear Reactor Regulation
References
Download: ML041480139 (5)


Text

Research Reactor Center W

University of Missouri-Columbia Research Parkl Columbia, MO 65211 PIION-E (573) 882-4211 FAX (573) 882-6360 May 13, 2004 Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001

SUBJECT:

University of Missouri Research Reactor Facility Docket No. 50-186 Monthly Operations Summary

Dear Mr. Adams:

Enclosed is a copy of MURR's Monthly Operations Summary for April 2004. If you have any questions, please contact me at (573) 882-5276.

Sincerely, I-"

C2,L>/K Leslie Foyto Reactor Manager LM/sm cc. Craig Bassett

Enclosure:

April Operation Summary - 4 pages I C-Af AN IQutL oPORmL'wm/ADA IvsTrrnmo.,

WNOE RSIA y MISSO'URI RESEARCH REACiOR.

OERAcTIOWS.DMONtt-fy S'NMAR, JkyriC2004

!Preyaredby:

Operations Staff

INTRODUCTION The reactor operated continuously in April with the following exceptions: 3 shutdowns for scheduled maintenance and refueling; I unscheduled shutdown.

MAINTENANCE ACTIVITIES 4/5/04 Refueled - removed core 04-16, loaded core 04-17.

Repaired DCW cooling line to primary coolant system pumps.

Replaced Pneumatic Tube System windgate.

4/12/04 Refueled - removed core 04-17, loaded core 04-18.

Removed Secondary Coolant System Distribution Valve S-22 for refurbishment.

4/13/04 Secondary Coolant Monitor module was replaced.

4/19/04 Refueled - removed core 04-18, loaded core 04-19.

Completed Modification Record 04-01 (Replace PT-943 GE transmitter.

with a Rosemount transmitter).

Reinstalled refurbished Secondary Coolant System Distribution Valve S-21.

4/26/04 Refueled - removed core 04-19, loaded core 04-20.

Completed offset change out for control rod position "B".

Replaced NMC RAK Stack Monitor blower motor overloads.

UNSCHEDULED SHUTDOWNS Date No.

Tye Cause 4/12/04 1171 Scram Rod Control Supply Power 2F4 Fuse Open On April 12, a reactor scram was automatically initiated when Rod Control supply power fuse 2F4 opened during a demonstration of the Auto Shim Circuit. The circuit was intentionally activated for training purposes just prior to the normally scheduled weekly shutdown. The 10-amp fuse opened just as the Auto Shim Circuit engaged when the regulating blade had reached a height of 5.2-inches. During the maintenance day activities, the rod control system was inspected and tested with no apparent cause discovered. The fuse was replaced and the reactor was returned to 10 MW operation after conclusion of the maintenance day. After careful review of the system prints, it was determined that both rod insert and rod withdraw power can be applied to the control rod drive motor simultaneously, thereby creating a potential over current condition. In both instances of 2F4 opening, a control rod was being withdrawn when the auto shim circuit activated. The operators have been instructed to secure all shimming evolutions prior to initiating the auto shim circuit for training.

OPERATION

SUMMARY

FOR MONTH OF University of Missour Research Reactor Center (MURR)

HOURS OPERATED THIS PERIOD TOTAL HOURS OPERATED, REACTOR HOURS OPERATED AT FULL POWER, THIS PERIOD TOTAL HOURS AT FULL POWER, REACTOR INTEGRATED POWER THIS PERIOD TOTAL INTEGRATED POWER, REACTOR Submitted by:

c3 5 I

Apr-04 I

650.22 1 257,900.46 646.22 1 254,579.73 l

269.33 l MWD L 100,275.07 l MWD MWD Custodian/Reactor Physicist

'l3/

?

Date:

I 7