9 Research Park Research Reactor Center Columbia, MO 65211 University of Missouri-Columbia PHONE (573) 882-4211 FAx (573) 882-6360 50 February 07, 2003 Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001

SUBJECT:

Monthly Operations Summary Enclosed is a copy of MURR's Monthly Operations Summary for January, 2003. If you have any questions, please contact me at (573) 882-5276.

Sincerely, Leslie Foyto Interim Reactor Manager LM/lmcg cc. Craig Bassett Enclosure AC-m EQUAL OPPOrTUNrY/ADA INST'fflON

l :ý lid

INTRODUCTION The reactor operated continuously in January with the following exceptions: four shutdowns for scheduled maintenance and refueling; no unscheduled shutdowns.

MAINTENANCE ACTIVITIES 1/6/03 Refueled - removed core 02-67, loaded core 03-01.

1/13/03 Refueled - removed core 03-01, loaded core 03-02.

1/20/03 Refueled - removed core 03-02, loaded core 03-03.

1/23/03 Inspected two end-of-life fuel elements in accordance with Technical Specification 5.5.

1/27/03 Refueled - removed core 03-03, loaded core 03-04.

OPERATION

SUMMARY

FOR MONTH OF University of Missour Research Reactor Center (MURR)

HOURS OPERATED THIS PERIOD M90.34 TOTAL HOURS OPERATED, REACTOR 248,047.92 HOURS OPERATED AT FULL POWER, THIS PERIOD I 687.02 I TOTAL HOURS AT FULL POWER, REACTOR INTEGRATED POWER THIS PERIOD 286.35 MWD TOTAL INTEGRATED POWER, REACTOR I ,l.e.6o IMWD Submitted by: j w9s 'K MWD Custodian/Reactor Physicist Date: _/L / 0-3