9 Research Reactor Center University of Missouri-Columbia February 07, 2003 Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001

SUBJECT:

Monthly Operations Summary Enclosed is a copy of MURR's Monthly Operations Summary for January, 2003.

If you have any questions, please contact me at (573) 882-5276.

Sincerely, Leslie Foyto Interim Reactor Manager LM/lmcg cc. Craig Bassett Enclosure AC-m EQUAL OPPOrTUNrY/ADA INST'fflON Research Park Columbia, MO 65211 PHONE (573) 882-4211 FAx (573) 882-6360 50

ll:ý lid

INTRODUCTION The reactor operated continuously in January with the following exceptions: four shutdowns for scheduled maintenance and refueling; no unscheduled shutdowns.

MAINTENANCE ACTIVITIES 1/6/03 Refueled - removed core 02-67, loaded core 03-01.

1/13/03 Refueled - removed core 03-01, loaded core 03-02.

1/20/03 Refueled - removed core 03-02, loaded core 03-03.

1/23/03 Inspected two end-of-life fuel elements in accordance with Technical Specification 5.5.

1/27/03 Refueled - removed core 03-03, loaded core 03-04.

OPERATION

SUMMARY

FOR MONTH OF University of Missour Research Reactor Center (MURR)

HOURS OPERATED THIS PERIOD TOTAL HOURS OPERATED, REACTOR HOURS OPERATED AT FULL POWER, THIS PERIOD TOTAL HOURS AT FULL POWER, REACTOR INTEGRATED POWER THIS PERIOD TOTAL INTEGRATED POWER, REACTOR Submitted by:

j w9s M90.34 248,047.92 I 687.02 I

286.35 MWD I

,l.e.6o IMWD

'K MWD Custodian/Reactor Physicist Date:

_/ L / 0-3