ML040060625

From kanterella
Jump to navigation Jump to search
November 2003 Monthly Operating Report for the University of Missouri-Columbia Research Reactor Center
ML040060625
Person / Time
Site: University of Missouri-Columbia
Issue date: 12/22/2003
From: Foyto L
Univ of Missouri - Columbia
To: Alexander Adams
Office of Nuclear Reactor Regulation
References
Download: ML040060625 (4)


Text

Research Park C1 Research Reactor Center Columbia, MO 65211 University of Missouri-Columbia Pno10Nt (573) 882-42 11 FAX (573) 882-6360 December 22, 2003 Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001

SUBJECT:

Monthly Operations Summary Enclosed is a copy of MURR's Monthly Operations Summary for November 2003. If you have any questions, please contact me at (573) 882-5276.

Sincerely, Leslie Foyto Reactor Manager A I -O P1-,,-OZ41V

.)o C>L-%-j L/ - -

LM/sm cc. Craig Bassett (1m' Enclosure Xr~0., (( 5

( O?9G5 AN EQUAL oPPoRmuNrrY/ADA INSTITUnON

"-- C--/,Z'q

'U*NnJ¶SITV OF JSSOU'PRi REsEfRcf REAcToR OPEAtTIONS MoNTrLY SWMtARY K OVTEMB2ER 2003 Preyaredby:

OperationsStaff

-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I INTRODUCTION The reactor operated continuously in November with the following exceptions: 4 shutdowns for scheduled maintenance and refueling.

MAINTENANCE ACTIVITIES 11/03/03 Refueled - removed core 03-51, loaded core 03-52.

Rebuilt valve A-147 (16"A exhaust solenoid valve).

Loaded new pool de-ionization bed 'L'.

Replaced pico-ammeter card in Nuclear Instrumentation Wide Range Monitor.

11/10/03 Refueled - removed core 03-52, loaded core 03-53.

11/17/03 Refueled - removed core 03-53, loaded core 03-54.

Completed the biennial change out of Control Blade 'C' Offset Mechanism.

11/24/03 Refueled - removed core 03-54, loaded core 03-55.

Rebuilt valve A-147 (16"A exhaust solenoid valve).

OPERATION

SUMMARY

FOR MONTH OF I Nov-03 University of Missour Research Reactor Center (MURR)

HOURS OPERATED THIS PERIOD 659.49 TOTAL HOURS OPERATED, REACTOR 254,597.17 HOURS OPERATED AT FULL POWER, THIS PERIOD 1 656.04 TOTAL HOURS AT FULL POWER, REACTOR i 251,293.26 INTEGRATED POWER THIS PERIOD 273.43 MWD TOTAL INTEGRATED POWER, REACTOR 98,905.20 MWD Submitted by:

i2 -s k(

MWD Custodian/Reactor Physicist Date: '-S) if. I of I I