Research Reactor Center University of Missouri-Columbia Research Park Columbia, MO 65211 PHONE (573) 882-4211 FAX (573) 882-6360 April 29, 2002 Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001

SUBJECT:

Monthly Operations Summary Enclosed is a copy of MURR's monthly operations summary for March 2002. If you have any questions, please contact me at (573) 882-5264.

Sincerely, Paul S. Hobbs, PE Reactor Manager PSH/djr Enclosure AN EQUAL OPPORTUNITY/ADA INSTITUTION

UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY

SUMMARY

MARCH 2002 Prepared by:

Operations Staff

INTRODUCTION The reactor operated continuously in March with the following exceptions: five shutdowns for scheduled maintenance and refueling. Performed two short duration startups to 9MW for NRC operator examination. There were no unscheduled shutdowns this month.

MAINTENANCE ACTIVITIES 3/4/02 Refueled - removed core 02-11, loaded core 02-12.

Installed new square root converter for flow transmitters 912A and 912E in accordance with Modification Record 01-4, Addendum No. 6.

3/11/02 Refueled - removed core 02-12, loaded core 02-13.

Replaced P501B-primary system pump and motor.

3/12/02 Refueled - removed core 02-13, loaded core 02-14.

Shutdown to investigate inner airlock door seal leak. Replaced bladder.

3/18/02 Refueled - removed core 02-14, loaded core 02-15.

Transferred eight spent fuel elements to the BMI cask in preparation for shipment to the Westinghouse Savannah River Site.

Installed new solenoid valves 5291 and 529J for anti-siphon system valves 543 A and B in accordance with Modification Record 0 1-6.

3/25/02 Refueled - removed core 02-15, loaded core 02-16.

Removed, rebuilt, and reinstalled P508B-pool system pump.

Installed new pool AT adder-subtracter unit in accordance with Modification Record 0 1-4, Addendum No. 3.

Mar OPERATION

SUMMARY

FOR MONTH OF University of Missour Research Reactor Center (MURR)

HOURS OPERATED THIS PERIOD TOTAL HOURS OPERATED, REACTOR HOURS OPERATED AT FULL POWER, THIS PERIOD TOTAL HOURS AT FULL POWER, REACTOR INTEGRATED POWER THIS PERIOD TOTAL INTEGRATED POWER, REACTOR Submitted by:

J MWD Custodian/Reactor Physicist Date:

-/_2-_-_

I 64-5.70 241,624.28 641.79 238,383.85 3267.6526 I93,523.26 I MWD MWD