July 2004 Monthly Operating Report for University of Missouri Research Reactor Facility
ML042390083
Person / Time
Site: University of Missouri-Columbia
Issue date: 08/18/2004
From: Foyto L
Univ of Missouri - Columbia
To: Alexander Adams
Office of Nuclear Reactor Regulation
References
Download: ML042390083 (5)


Text

wf Research Reactor Center 1~

University of Missouri-Columbia Research Park Columbia, MO 65211 PiioNE (573) 882-4211 FAX (573) 882-6360 August 18, 2004 Mr. Alexander Adams, Jr.

U.S. Nuclear Regulatory Commission Mail Stop 012-G13 Washington, DC 20555-0001

SUBJECT:

University of Missouri Research Reactor Facility Docket No. 50-186 Monthly Operations Summary

Dear Mr. Adams:

Enclosed is a copy of MURR's Monthly Operations Summary for July 2004. If you have any questions, please contact me at (573) 882-5276.

Sincerely, Leslie Foyto Reactor Manager LM/sm cc. Craig Bassett

Enclosure:

July Operation Summary-3 pages 06-),

AN EQUAL OPPORTUITN/ADA INnTIrnoN

QuAiYRN 01 fMISSO'UIJ RESEARCH REAcgioR OPE254'nIOfS vOJVT'-fLHSy SL1UM4AY Ju yY 2004 Preyaredby:

Oyerations Staff

INTRODUCTION The reactor operated continuously in July with the following exceptions: 4 shutdowns for scheduled maintenance and refueling.

MAINTENANCE ACTIVITIES 7/2/04 Completed CP-31 (Calibration of the Eberline Radiation Stack Monitor) 7/5/04 Refueled - removed core 04-31, loaded core 04-32.

7/8/04 Replaced the in-line Secondary Coolant System pH probe.

7/12/04 Refueled - removed core 04-32, loaded core 04-33.

Relocated the Auto Shim Control Circuit as per Modification Record 04-04.

Completed Modification Record 95-01, Add. IF; "Gamma-metrics Nuclear' Instrument gain potentiometer R27 replacement."

7/19/04 Refueled - removed core 04-33, loaded core 04-34.

7/26/04 Refueled - removed core 04-34, loaded core 04-35.

Removed the 20 element X fuel storage basket frame for inspection.

I Ju1-04 I

OPERATION

SUMMARY

FOR MONTH OF University of Missour Research Reactor Center (MURR)

HOURS OPERATED THIS PERIOD TOTAL HOURS OPERATED, REACTOR HOURS OPERATED AT FULL POWER, THIS PERIOD TOTAL HOURS AT FULL POWER, REACTOR INTEGRATED POWER THIS PERIOD TOTAL INTEGRATED POWER, REACTOR Submitted by:

X 1 685.04 259,894.53 681.52 1 256,565.49 1

1 284.05 l MWD l

101,O2.87 MWD MWD Custodian/Reactor Physicist 7 /3i /D %

Date:

INTRODUCTION The reactor operated continuously in July with the following exceptions: 4 shutdowns for scheduled maintenance and refueling.

MAINTENANCE ACTIVITIES 7/2/04 Completed CP-31 (Calibration of the Eberline Radiation Stack Monitor) 7/5/04 Refueled - removed core 04-31, loaded core 04-32.

7/8/04 Replaced the in-line SecondaryjH probe.

7/12/04 Refueled - removed core 04-32, loaded core 04-33.

Genmpleted-ifieatioO4e rd-04-04"R-elec-atethe-Auto-Shim-Circuit portion."

Completed Modification Record 95-01,Add. lF;"Gamma-metrics Nuclear Instrument gain potentiometer R27 replacement."

7/19/04 Refueled - removed core 04-33, loaded core 04-34.

7/26/04 Refueled - removed core 04-34, loaded core 04-3 5.

Removed the 20 element X fuel storage basket frame for inspection.

\\ ~ ~

~

~

~

~

~

~

~

~

~

~

C P~@ecv,>

beCs aeCt-Jtcv U

64 w

/

{tucks-7' OVyrY