Interim Deficiency Rept Re Centrifugal Charging Pump Operation Following Secondary Side Line Rupture Discussed in 800508 Telcon.Evaluation of Transient Described in Westinghouse 800508 Ltr Will Be Provided Pending Completion
ML19323H278
Person / Time
Site: Wolf Creek, Callaway, Sterling  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/06/1980
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To:
References
SLNRC-80-28, NUDOCS 8006120311
Download: ML19323H278 (2)


Text

_ _ - _ _ - _ _ _ _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ - - - -

.

..

SNUPPS j Stenderdized Peueleer Unit '

Power Plant Systeen )

5 Choke Cherry Road Nicholas A. Petrick v fond 20sso Executive Director June 6,1980

-

)

SLNRC 80 28 FILE: 0491.10.2 SUBJ: Centrifugal Charging Pump Operation Following Secondary Side High Energy Line Rupture l

Mr. Boyce Grier j Director, Region I U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, Pennsylvania 19406 Docket Nos.: STN 50-482, STN 50-483, STN 50-485, STN 50-486 Ref: Westinghouse letter (T.M. Anderson), NS-TMA-2245, to USNRC (V. Stello), dated May 8,1980, same subject

Dear Mr. Grier:

On May 8,1980, SNUPPS informed the Nuclear Regulatory Commission, Region I Office of Inspection and Enfarcement, of a potential deficiency in-volving centrifugal charging pump operation following a secondary side line rupture. The infomation was communicated by telephone to Mr.

Richard McGaughy of your staff pursuant to 10 CFR 50.55(e).

The referenced letter provided detailed infomation on the deficiency, described plant-specific calculations that are required, and discussed possible corrective modifications. The SNUPPS plants will have qualified, safety-related pressurizer power-operated relief valves. Thus the pro- ,

blem described by Westinghouse does not appear to be applicable to SNUPPS.

However, additional evaluation is required on the response of a SNUPPS plant to the transient described in the referenced letter. This evaluation is expected to be complete in about one month and the NRC will be inform-ed of the results.

Very truly yours, 4W4M

--Nicholas A. Petrick g0p\O 4

RLS/jdk \\

c- Mr. James G. Keppler, Director, Region III, USNRC Mr. Karl V. Seyfrit, Director, Region IV,USNRC l

. Victor Stello Jr., Director, Office of Inspection

' ' and Enforcement, USNRC, Washington, D.C. 20555

.i 8 006120 3fl 3

. _ . . _ . _ _ . . . . _ _ _ - _ _ -- - - - -

.

..

,

-

bec: J. K. Bryan UE i G. L. Koester KGE

, D. T. McPhee KCPL l A. C. Passwater UE

!

G. P. Rathbun KGE P. C. Wilkens RGE J. A. Bailey KGE D. F. Schnell UC J. L. Sippel KCPL J. H. Smith B

-

'

J. S. Prebula EI A. F. Jost 7 b

,

.1 l

l l

!

!

!

1

- , ,-, ,

-- ,,. - ,