Notice of Public Meeting
ML111250109
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/05/2011
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To:
Shared Package
ML110610690 List:
References
Download: ML111250109 (4)


Text

MN No.11-018 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING May 5, 2OII Licensee: Dominion Nuclear Connecticut, Inc.

Facilities: Millstone Power Station Docket Nos: 50-336 andSQ-423 Date/ Time: May 25,2011 2:00 p.m. to 4:00 p.m.

Location: Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385

Purpose:

The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Millstone Power Station for 2A10, as described in the annual assessment letter dated March 4,2Q11. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: J. Clitford, Deputy Director, Division of Reactor Projects D. Jackson, Chief, Division of Reactor Projects, Branch 5 S. Shaffer, Senior Resident lnspector, Millstone B. Haagensen, Resident Inspector, Millstone J. Krafty, Resident Inspector, Millstone Public Participation: This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.

Meeting Gontact: D. Jackson , Chief, Projects Branch 5 61 0-337-5306 E-mail: Donald.Jackson@nrc.gov The NRC's annual assessment letter regarding Millstone Power Station performance during 2010 can be found in ADAMS with Accession Number ML110620174. ADAMS is accessible from the NRC website at: http://nrc.qov/readinq-rm/adams.html.

Additional information relative to the NRC's annual assessment process and the safety performance of Millstone Power Station can be found on the NRC's website at:

http://www. nrc. qov/N RR/OVE RS G HT/ASSESS/Index. htm l.

I The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website,

2 http://www.nrc.qov/readinq-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 15,2011 via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NR tings.

Approved by:

Donald E. Ja Projects Branch 5 Division of Reactor Projects Distribution via ListServ

2 http://www.nrc.qovireadinq-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 15,'2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/

Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution: (via email)

W. Dean, RA D. Dodson, DRP D. Lew, DRA S. Shaffer, DRP, SRI D. Roberts, DRP B. Haagensen, Rl J. Clifford, DRP J. Krafty, DRP, Rl C.. Miller, DRS C. Kowalyshyn, OA P. Wilson, DRS D, Bearde, DRS S. Bush-Goddard, Rl OEDO RidSNRRPM Millstone Resource D. Jackson, DRP RidsNRRDorlLpl 1 -2 Resource T. Setzer. DRP ROPreportsResource SUNSI Review Complete: TCS (Reviewer's Initials)

DOCUMENT NAME: G:\DRP\BRANCHS\AnnualAssessment Meetings\2010 EOC\Meeting Notices\Millstone Annual Assessment Meeting Category 3.docx After declaring this document "An Otficial Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachmenUenclosure "E" = Copy with attachmenVenclosure "N" = No copy ML111250109 CFFICE RI/DRP llhp RI/DRP NAME TSetzer/tcs DJackson/dei DATE 05t05t11 05t05t11 OFFICIAL RECORD COPY

3 Aqenda NRG's Annual Assessment Meeting Millstone Power Station May 25,2011 2:00 p.m. to 4:00 p.m.

Waterford Town Hall 15 Rope Ferry Road Waterford, GT 06385