EOC Annual Assessment Letter and Inspection/Activity Plan
ML110620313
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/04/2011
From: Stephanie West
Division Reactor Projects III
To: Schimmel M
Northern States Power Co
References
Download: ML110620313 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 4, 2011 Mr. Mark A. Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, (REPORT 05000282/2011001 AND 05000306/2011001)

Dear Mr. Schimmel:

On February 17, 2011, the NRC completed its end-of-cycle performance review of Prairie Island Nuclear Generating Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2010, through December 31, 2010. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Prairie Island Nuclear Generating Plant, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance for Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). The NRC determined the performance for Unit 2 during the most recent quarter was within the Regulatory Response Column of the NRC=s ROP Action Matrix based on one inspection finding in the Mitigating Systems Cornerstone being classified as having low-to-moderate safety significance (White). This finding was from the third quarter of 2009 and related to inadequate design of the component cooling water system. A supplemental inspection (95001) was performed the week of June 14 through 18, 2010. During this inspection, we were unable to close the White finding due to an incomplete extent of condition review. An additional supplemental inspection was performed the week of November 1, 2010.

M. Schimmel Based upon the results of this inspection, the NRC closed the White finding and Prairie Island Unit 2 transitioned to the Licensee Response Column of the NRC Action Matrix. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

In the 2009 mid-cycle assessment letter, dated September 1, 2009 (ADAMS Ref. ML092440367), we advised you of a substantive cross-cutting issue (SCCI) in the area of human performance (HP) with cross-cutting themes in the aspects of systematic process (H.1(a)), procedural adequacy (H.2(c)), and procedural compliance (H.4(b)).

During this assessment period there were eight findings documented with cross-cutting aspects in the HP area. Of these eight findings, one shared a common cross-cutting aspect of systematic process. No findings were identified in the procedural adequacy or procedural compliance areas.

With respect to the SCCI areas of systematic process (H.1(a)), procedural adequacy (H.2(c)),

and procedural compliance (H.4(b)), both the NRC and your organization have noted an improvement in these areas. Your staff has identified corrective actions that should reasonably address the SCCI. Additionally, the number of findings with a cross-cutting aspect in these areas has been reduced. For these reasons, the NRC has gained confidence in your ability to correct the concerns identified and sustained improvement has been observed in these aspects.

Therefore, the SCCI aspects in systematic process (H.1(a)), procedural adequacy (H.2(c)), and procedural compliance (H.4(b)) are closed.

The enclosed inspection plan lists the inspections scheduled through June 30, 2012.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to the ROP baseline, inspections are planned for Temporary Instructions 2515/177, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal & Containment Spray System, and 2515/179, Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in National Source Tracking System, and also Independent Spent Fuel Storage Installation Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

M. Schimmel Please contact Jack Giessner at 630/829-9619 with any questions you have regarding this letter.

Sincerely,

/RA/

Steven West, Director Division of Reactor Projects Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506

Enclosure:

Prairie Island Inspection/Activity Plan cc w/encl: Distribution via ListServ

Prairie Island Inspection / Activity Plan 03/01/2011 - 06/30/2012 Planned Dates No. of Staff Start End Inspection Activity Title on Site TI-177 - TI-177 FOLLOWUP 2 03/28/2011 04/15/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/11/2011 04/15/2011 IP 71124.05 Radiation Monitoring Instrumentation 04/11/2011 04/15/2011 IP 71151-OR01 Occupational Exposure Control Effectiveness 04/11/2011 04/15/2011 IP 71151-PR01 RETS/ODCM Radiological Effluent BI ENG - INSERVICE INSPECTION - U1 2 04/30/2011 06/04/2011 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 05/09/2011 05/13/2011 IP 71124.02 Occupational ALARA Planning and Controls 05/09/2011 05/13/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/20/2011 06/24/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 1 07/11/2011 07/15/2011 IP 7111402 Alert and Notification System Testing 07/11/2011 07/15/2011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 07/11/2011 07/15/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/11/2011 07/15/2011 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/22/2011 08/26/2011 IP 71124.07 Radiological Environmental Monitoring Program 08/22/2011 08/26/2011 IP 71151-BI01 Reactor Coolant System Activity BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 10/03/2011 10/07/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 10/03/2011 10/07/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls BI OL - BIENNIAL REQUAL PROGRAM INSPECTION 2 10/17/2011 10/21/2011 IP 7111111B Licensed Operator Requalification Program BI ENG - MODIFICATIONS / 50.59 INSPECTION 3 10/31/2011 11/18/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications STRIKE - STRIKE CONTINGENCY - PLANNERS 2 12/01/2011 12/31/2011 IP 92709 Licensee Strike Contingency Plans ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT 2 01/01/2012 02/29/2012 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 01/09/2012 01/13/2012 IP 71124.02 Occupational ALARA Planning and Controls 01/09/2012 01/13/2012 IP 71151 Performance Indicator Verification

Prairie Island Inspection / Activity Plan 03/01/2011 - 06/30/2012 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI ENG - INSERVICE INSPECTION - UNIT 2 1 02/18/2012 03/23/2012 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 02/27/2012 03/02/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/23/2012 04/27/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation OL PREP - PR. ISLAND INIT PREP - 04/2012 4 04/23/2012 04/27/2012 W90250 OL - INITIAL EXAM - MAY 2012 - PRAI OL EXAM - PR. ISLAND INIT EXAM - 05/2012 4 05/14/2012 05/25/2012 W90250 OL - INITIAL EXAM - MAY 2012 - PRAI BI ENG - FIRE PROTECTION INSPECTION & BAG TRIP 3 05/21/2012 06/22/2012 IP 7111105T Fire Protection [Triennial]

M. Schimmel Please contact Jack Giessner at 630/829-9619 with any questions you have regarding this letter.

Sincerely,

/RA/

Steven West, Director Division of Reactor Projects Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506

Enclosure:

Prairie Island Inspection/Activity Plan cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\2010 EOC Letters\Prairie Island EOC Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME RLerch:dtp JGiessner*RL for SWest DATE 02/28/11 02/28/11 03/01/11 OFFICIAL RECORD COPY

Letter to M. Schimmel from S. West dated March 4, 2011.

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (REPORT 05000282/2011001 AND 05000306/2011001)

DISTRIBUTION:

Daniel Merzke RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment Resource