8/31/06 Prairie Island Station-Mid-Cycle Performance Reveiw and Inspection Plan
ML062430338
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/31/2006
From: Richard Skokowski
NRC/RGN-III/DRP/RPB3
To: Thomas J. Palmisano
Nuclear Management Co
References
Download: ML062430338 (7)


Text

August 31, 2006 Mr. T. Palmisano Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PRAIRIE ISLAND NUCLEAR GENERATING PLANT

Dear Mr. Palmisano:

On August 7, 2006, the NRC staff completed its performance review of the Prairie Island Nuclear Generating Plant for the first half of the calender year 2006 assessment cycle.

Our technical staff reviewed the performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at the Prairie Island Nuclear Generating Plant Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. Significant inspections planned include a Component Design Basis Inspection in May 2007, an Independent Spent Fuel Storage Installation (ISFSI)

Operation Inspection in June 2007, and a Modifications/50.59 Inspection in March 2008. In addition, the resident inspectors plan to perform Temporary Inspections 2515/166, Pressurized Water Reactor Containment Sump Blockage on Unit 2 and 2515/169, Mitigating Systems Performance Index (MSPI) Verification, before the end of calendar year 2006. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

T. Palmisano In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282, 50-306 License No. DPR-42; DPR-60

Enclosure:

Prairie Island Nuclear Generating Plant Inspection/Activity Plan DISTRIBUTION:

See next page

T. Palmisano In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282, 50-306 License No. DPR-42; DPR-60

Enclosure:

Prairie Island Nuclear Generating Plant Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\prairie island\Prairie Island 2006 MOC letter.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME RSkokowski:dtp DATE 08/30/06 OFFICIAL RECORD COPY

T. Palmisano cc w/encl: C. Anderson, Senior Vice President, Group Operations M. Sellman, Chief Executive Officer and Chief Nuclear Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Council Administrator President, Prairie Island Tribal Council Goodhue County Sheriff Director, Pierce County Emergency Management Agency Chair, Pierce County Board of Commissioners Chair, Dakota County Board of Commissioners Mayor of Red Wing Director, Goodhue County Emergency Management Agency Chair, Goodhue County Board of Commissioners Pierce County Sheriff Dakota County Sheriff INPO

T. Palmisano ADAMS Distribution:

TEB MLC RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Prairie Island DRPIII DRSIII PLB1 TXN

Page 1 of 2 Prairie Island 08/30/2006 13:03:10 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type INSPECTI - ISFSI INSPECTION 2 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 08/01/2006 09/30/2006 Other Routine ENF. F/U - OPERATOR LICENSING FOLLOWUP - IR 2006013 1 1, 2 IP 7111111B Licensed Operator Requalification Program 08/28/2006 09/29/2006 Baseline Inspections BI - RAD INSTRUMENTATION 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/11/2006 09/15/2006 Baseline Inspections ISI - PRAIRIE ISLAND UNIT 2 ISI INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 11/13/2006 12/01/2006 Baseline Inspections BI - OUTAGE ALARA AND OCC RP 1 2 IP 7112101 Access Control to Radiologically Significant Areas 11/27/2006 12/01/2006 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 11/27/2006 12/01/2006 Baseline Inspections BI - POST OUTAGE ALARA AND ACCESS CONTROL 1 1 IP 7112101 Access Control to Radiologically Significant Areas 01/29/2007 02/02/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 01/29/2007 02/02/2007 Baseline Inspections EP BI - BASELINE EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 04/09/2007 04/13/2007 Baseline Inspections CDBI - COMPONENT DESIGN BASIS INSPECTION 4 2 IP 7111121 Component Design Bases Inspection 05/14/2007 06/15/2007 Baseline Inspections ISFSI - ISFSI INSPECTIONS 1 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 06/01/2007 06/30/2007 Other Routine 71122.03 - REMP AND RAM CONTROL 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 06/25/2007 06/29/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/25/2007 06/29/2007 Baseline Inspections HEATSINK - HEAT SINK INSPECTION 1 1, 2 IP 7111107B Heat Sink Performance 06/25/2007 07/02/2007 Baseline Inspections FY 2007 - PRAIRIE ISLAND INIT PREP 07/2007 3 1 W90165 OL - INITIAL EXAM - PRAIRIE ISLAND - JUL/AUG 2007 07/09/2007 07/13/2007 Not Applicable FY 2007 - PRAIRIE ISLAND INIT EXAM 07&08/2007 3 1 W90165 OL - INITIAL EXAM - PRAIRIE ISLAND - JUL/AUG 2007 07/30/2007 08/10/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Prairie Island 08/30/2006 13:03:10 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7112101 - ACCESS CONTROL AND ALARA 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/24/2007 09/28/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/24/2007 09/28/2007 Baseline Inspections 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 10/15/2007 10/19/2007 Baseline Inspections 71122.02 - TRANSPORTATION 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 12/03/2007 12/07/2007 Baseline Inspections MOD/5059 - MODIFICATIONS/50.59 INSPECTION 2 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/03/2008 03/21/2008 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 03/03/2008 03/21/2008 Baseline Inspections MAIN - MAINTENANCE EFFECTIVENESS INSPECTION 1 1, 2 IP 7111112B Maintenance Effectiveness 03/31/2008 04/04/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.