UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 2, 2008 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2

Dear Mr. Wadley:

On August 14, 2008, the NRC staff completed its performance review of Prairie Island Nuclear Generating Plant, Units 1 and 2 for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Prairie Island Nuclear Generating Plant, Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through December 31, 2009.

The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

M. Wadley In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506

Enclosure:

Prairie Island Inspection/Activity Plan DISTRIBUTION See next page

Letter to M. Wadley from R. Skokowski dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 cc w/encl:

D. Koehl, Chief Nuclear Officer P. Glass, Assistant General Counsel Nuclear Asset Manager J. Stine, State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Council Administrator President, Prairie Island Tribal Council Goodhue County Sheriff Director, Pierce County Emergency Management Agency Chair, Pierce County Board of Commissioners Chair, Dakota County Board of Commissioners Mayor of Red Wing Director, Goodhue County Emergency Management Agency Chair, Goodhue County Board of Commissioners Pierce County Sheriff Dakota County Sheriff G. Mortensen, INPO

M. Wadley In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506

Enclosure:

Prairie Island Inspection/Activity Plan DISTRIBUTION See next page DOCUMENT NAME: G:\\1-secy\\2008 Mid-cycle letters final.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RJones:dtp RSkokowski DATE 08/21/08 08/21/08 OFFICIAL RECORD COPY

Letter to M. Wadley from R. Skokowski dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 DISTRIBUTION:

Tamara Bloomer RidsNRRDORlLpl3-2 RidsNrrPMPrairieIsland Resource RidsNrrDirsIpab Resource James Caldwell Mark Satorius Jared Heck Kenneth OBrien Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

Prairie Island Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 4

ER

- EMERGENCY RESPONSE - RX TRIP & NOUE Event Response Inspec Special Inspection 07/31/2008 09/20/2008 93812 IP 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Access Control to Radiologically Significant Areas 09/22/2008 09/26/2008 7112101 IP Baseline Inspections ALARA Planning and Controls 09/22/2008 09/26/2008 7112102 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/22/2008 09/26/2008 71151-OR01 IP 2

BI ENG

- INSERVICE INSPECTION/TI-172 Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 09/15/2008 10/10/2008 2515/172 IP Baseline Inspections Inservice Inspection Activities - PWR 09/15/2008 10/10/2008 7111108P IP 3

BI ENG

- ENGINEERING MODIFICATIONS / 50.59 INSP.

Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 11/17/2008 12/12/2008 7111117B IP 5

RENEWAL

- LICENSE RENEWAL INSPECTION License Renewal Inspec License Renewal Inspection 01/12/2009 01/30/2009 71002 IP 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Radioactive Material Processing and Transportation 02/02/2009 02/06/2009 7112202 IP Baseline Inspections Reactor Coolant System Activity 02/02/2009 02/06/2009 71151-BI01 IP 3

BI ENG

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]

03/30/2009 04/17/2009 7111105T IP 3

BI ENG

- FIRE PROTECTION INFO GATHERING TRIP Baseline Inspections Fire Protection [Triennial]

03/16/2009 03/20/2009 7111105T IP 1

BI EP

- EP ROUTINE INSPECTION / PI VERIFICATION EP Baseline Inspection Alert and Notification System Testing 04/13/2009 04/17/2009 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 04/13/2009 04/17/2009 7111403 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 04/13/2009 04/17/2009 7111405 IP Baseline Inspections Drill/Exercise Performance 04/13/2009 04/17/2009 71151-EP01 IP Baseline Inspections ERO Drill Participation 04/13/2009 04/17/2009 71151-EP02 IP Baseline Inspections Unplanned Power Changes per 7000 Critical Hrs 04/13/2009 04/17/2009 71151-IE03 IP 1

ISFSI

- ISFSI - ROUTINE LOADING Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 04/01/2009 05/30/2009 60855.1 IP 2

BI ENG

- TRIENNIAL HEAT SINK INSPECTION Baseline Inspections Heat Sink Performance 06/15/2009 06/19/2009 7111107T IP 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Access Control to Radiologically Significant Areas 06/15/2009 06/19/2009 7112101 IP Baseline Inspections ALARA Planning and Controls 06/15/2009 06/19/2009 7112102 IP Baseline Inspections Occupational Exposure Control Effectiveness 06/15/2009 06/19/2009 71151-OR01 IP

Prairie Island Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 2

1 BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/24/2009 08/28/2009 7112201 IP Baseline Inspections RETS/ODCM Radiological Effluent 08/24/2009 08/28/2009 71151-PR01 IP 1

BI ENG

- ENGINEERING INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 09/14/2009 10/02/2009 7111108P IP 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Access Control to Radiologically Significant Areas 09/21/2009 09/25/2009 7112101 IP Baseline Inspections ALARA Planning and Controls 09/21/2009 09/25/2009 7112102 IP 2

BI OL

- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections Licensed Operator Requalification Program 10/05/2009 10/09/2009 7111111B IP 1

TI

- TEMPORARY INSTRUCTION 2515/173 Generic Safety Inspectio Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 10/05/2009 10/09/2009 2515/173 IP 4

BI PI&R

- BIENNIAL PI&R INSPECTION Baseline Inspections Identification and Resolution of Problems 11/30/2009 12/18/2009 71152B IP