December 19, 2007 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

CHANGE TO THE INSPECTION PLAN - PRAIRIE ISLAND NUCLEAR GENERATING PLANT

Dear Mr. Wadley:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

M. Wadley Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA by Christine A. Lipa Acting for/

Richard A. Skokowski, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-282, 50-306 License Nos. DPR-42; DPR-60

Enclosure:

As Stated cc w/encl: D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota

M. Wadley Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA by Christine A. Lipa Acting for/

Richard A. Skokowski, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-282, 50-306 License Nos. DPR-42; DPR-60

Enclosure:

As Stated cc w/encl: D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota DOCUMENT NAME: G:\ Branch TSS\ALL MOC\Midcycle 2006 to 2007\Realignment Letter\prairie Island.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME CLipa, Acting for RSkokowski:dtp DATE 12/19/07 OFFICIAL RECORD COPY

Letter to M. Wadley from R. Skokowski dated December 19, 2007

SUBJECT:

CHANGE TO THE INSPECTION PLAN - PRAIRIE ISLAND NUCLEAR GENERATING PLANT DISTRIBUTION:

TEB MLC RidsNrrDirsIrib MAS KGO JKH3 JTA CAA1 DRPIII DRSIII PLB1 TXN

Prairie Island Inspection / Activity Plan 01/01/2008 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 02/25/2008 02/29/2008 Baseline Inspections BI ENG - ENGINEERING INSERVICE INSPECTION/150/172 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 02/18/2008 03/07/2008 Safety Issues IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 02/18/2008 03/07/2008 Generic Safety Inspec IP 7111108P Inservice Inspection Activities - PWR 02/18/2008 03/07/2008 Baseline Inspections 2515/166 - TI 2515/166 PWR SUMP INSPECTION 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 05/19/2008 05/23/2008 Safety Issues 2515/172 - TI 2515/172 RCS WELD INSPECTION 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 06/23/2008 06/27/2008 Generic Safety Inspec BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/23/2008 06/27/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 06/23/2008 06/27/2008 Baseline Inspections BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 IP 7111401 Exercise Evaluation 07/21/2008 07/25/2008 EP Baseline Inspectio IP 71151-EP01 Drill/Exercise Performance 07/21/2008 07/25/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 07/21/2008 07/25/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 07/21/2008 07/25/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/18/2008 08/22/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 08/18/2008 08/22/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112102 ALARA Planning and Controls 09/22/2008 09/26/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 09/22/2008 09/26/2008 Baseline Inspections BI ENG - ENGINEERING INSERVICE INSPECTION/150/172 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 09/15/2008 10/10/2008 Safety Issues IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 09/15/2008 10/10/2008 Generic Safety Inspec IP 7111108P Inservice Inspection Activities - PWR 09/15/2008 10/10/2008 Baseline Inspections BI ENG - ENGINEERING MODIFICATIONS / 50.59 INSP. 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 11/17/2008 12/12/2008 Baseline Inspections IP 7111117B Permanent Plant Modifications 11/17/2008 12/12/2008 Baseline Inspections