MONTHYEARIR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 IR 05000369/20220032022-10-27027 October 2022 Integrated Inspection Report 05000369/2022003 and 05000370/2022003 IR 05000369/20220112022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 IR 07200038/20220012022-09-12012 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 IR 05000369/20220022022-07-26026 July 2022 Integrated Inspection Report 05000369/2022002 and 05000370/2022002 IR 05000369/20224012022-05-12012 May 2022 Cyber Security Inspection Report 05000369/2022401 and 05000370/2022401 IR 05000369/20220012022-04-23023 April 2022 Integrated Inspection Report 05000369/2022001 and 05000370/2022001 RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System IR 05000369/20224022022-03-24024 March 2022 Security Baseline Inspection Report 05000369/2022402 and 05000370/2022402 IR 05000369/20210062022-03-0202 March 2022 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 (Report 05000369/2021006 and 05000370/2021006) IR 05000369/20220102022-02-16016 February 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000369/2022010 and 05000370/2022010 IR 05000369/20210042022-01-26026 January 2022 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2021004 and 05000370/2021004 ML21342A3862021-12-0707 December 2021 William B. McGuire Nuclear Plant - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection (NRC Inspection Report 05000369/2022401 and 05000370/2022401) IR 05000369/20210032021-10-28028 October 2021 Integrated Inspection Report 05000369/2021003 and 05000370/2021003 IR 05000369/20210052021-08-23023 August 2021 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000369/2021005 and 05000370/2021005) IR 05000369/20210022021-08-0303 August 2021 Integrated Inspection Report 05000369/2021002 and 05000370/2021002 IR 05000369/20214012021-07-30030 July 2021 Security Baseline Inspection Report 05000369/2021401 and 05000370/2021401 IR 05000369/20210112021-05-20020 May 2021 Triennial Fire Protection Inspection Report 05000369/2021011 and 05000370/2021011 IR 05000369/20214022021-05-20020 May 2021 Security Baseline Target Set Inspection Report 05000369/2021402 and 05000370/2021402 IR 05000369/20210012021-04-30030 April 2021 Integrated Inspection Report 05000369/2021001 and 05000370/2021001 IR 07200038/20210012021-04-30030 April 2021 Construction of an Independent Spent Fuel Storage Installation Report 07200038/2021001 IR 05000369/20210102021-03-17017 March 2021 Design Basis Assurance Inspection Teams Inspection Report 05000369 2021010 and 05000370/2021010 IR 05000369/20200062021-03-0303 March 2021 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2020006 and 05000370/2020006 IR 05000369/20203022021-02-26026 February 2021 Reissue - William B. McGuire, NRC Retake Written Examination Report 05000369/2020302 and 05000370/2020302 IR 05000369/20200042021-01-26026 January 2021 Integrated Inspection Report 05000369/2020004, 05000370/2020004, and 07200038/2020002 IR 05000369/20204012020-12-17017 December 2020 Material Control and Accounting Program Inspection Report 05000369/2020401 and 05000370/2020401 (OUO Removed) IR 05000369/20204022020-11-19019 November 2020 William B. Mcguire Nuclear Station, Units 1 and 2 Security Baseline Inspection Report 05000369/2020402 and 05000370/2020402 IR 05000369/20200032020-11-0404 November 2020 Integrated Inspection Report 05000369/2020003, 05000370/2020003, and 07200038/2020001 IR 05000369/20200102020-10-27027 October 2020 Design Basis Assurance Inspection Report 05000369/2020010 and 05000370/2020010 IR 05000369/20200112020-09-18018 September 2020 Biennial Problem Identification and Resolution Inspection Report 05000369/2020011 and 05000370/2020011 IR 05000369/20200052020-08-17017 August 2020 Updated Inspection Plan for Mcguire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2020005 and 05000370/2020005) IR 05000369/20200122020-07-31031 July 2020 NRC Post-Approval Site Inspection for License Renewal, Inspection Report 05000369/2020012 and 05000370/2020012 IR 05000369/20200022020-07-29029 July 2020 Integrated Inspection Report 05000369/2020002 and 05000370/2020002 IR 05000369/20200012020-04-28028 April 2020 Integrated Inspection Report 05000369/2020001 and 05000370/2020001 IR 05000369/20203012020-04-24024 April 2020 William B. McGuire Nuclear Station NRC Examination Report 05000369/2020301 and 05000370/2020301 2024-01-31
[Table view] Category:Letter
MONTHYEARIR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000369/20220032022-10-27027 October 2022 Integrated Inspection Report 05000369/2022003 and 05000370/2022003 IR 05000369/20220112022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition IR 07200038/20220012022-09-12012 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 ML22230B6132022-09-0101 September 2022 Review of the Draft Environmental Assessment and Finding of No Significant Impact for Brunswick Steam Electric Plant and McGuire Nuclear Station Independent Spent Fuel Storage Installations Decommissioning Funding Plans IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 IR 05000369/20220022022-07-26026 July 2022 Integrated Inspection Report 05000369/2022002 and 05000370/2022002 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3112022-05-16016 May 2022 Letter Issuing Exemption to McGuire IR 05000369/20224012022-05-12012 May 2022 Cyber Security Inspection Report 05000369/2022401 and 05000370/2022401 2024-01-31
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML22087A4782022-03-25025 March 2022 301 Exam Report IR 05000369/20203022021-02-26026 February 2021 Reissue - William B. McGuire, NRC Retake Written Examination Report 05000369/2020302 and 05000370/2020302 ML20353A3902020-12-18018 December 2020 William B. McGuire Nuclear Station, NRC Retake Written Examination Report 05000369/2020302 and 05000370/2020302 IR 05000369/20203012020-04-24024 April 2020 William B. McGuire Nuclear Station NRC Examination Report 05000369/2020301 and 05000370/2020301 IR 05000369/20183012018-06-25025 June 2018 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2018301 and 05000370/2018301 ML16092A1742016-03-29029 March 2016 Operator Licensing Written Examination Approval 05000369/2016301 and 05000370/2016301 IR 05000369/20133012014-01-23023 January 2014 Er 05000369-13-301, 05000370-13-301; on December 2 - 6, 2013 & December 12, 2013; McGuire Nuclear Plant, Units 1 and 2, Operator License Examinations IR 05000369/20123012012-10-22022 October 2012 Er 05000369-12-301, 05000370-12-301, August 20 - 28, 2012 & September 5, 2012; McGuire Nuclear Plant, Units 1 &2, Operator License Examinations ML12221A3912012-08-0606 August 2012 Duke Energy - Response to NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations IR 05000369/20113012011-08-23023 August 2011 Er 05000369-11-301; 05000370-11301; 06/27/2011 - 07/06/2011; McGuire Nuclear Station, Units 1& 2, Operator License Examinations IR 05000369/20103012010-09-0808 September 2010 NRC Examination Report 05000369-10-301 and 05000370-10-301 IR 05000369/20093022009-12-0303 December 2009 Operator Retake License Examination Report 05000369/09-302 and 05000370/09-302 IR 05000369/20093012009-07-0707 July 2009 NRC Examination Report 05000369/2009301 and 05000370/2009301 ML0826802612008-09-24024 September 2008 May, 05000369-08-301 & 05000370-08-301 Final As-Given RO Written Exam ML0818502312008-07-0303 July 2008 Er 05000369-08-301 and 05000370-08-301, on 05/12-21/08 & 05/23/08, McGuire Nuclear Plant, Units 1& 2, Licensed Operator Examinations IR 05000369/20073012007-04-25025 April 2007 Er 05000369-07-301 and 05000370-07-301 on March 19-22, 2007, McGuire Units 1 & 2 ML0527602732005-09-21021 September 2005 Duke Power - Response to NRC Regulatory Issue Summary 2005-19 Preparation and Scheduling of Operator Licensing Examinations IR 05000369/20033022003-11-10010 November 2003 NRC Examination Report 05000369/2003-302 and 05000370/2003-302 ML0331403662003-11-10010 November 2003 NRC Examination Report 05000369/2003-302 and 05000370/2003-302 ML0323700262003-06-16016 June 2003 June 2003 Exam 50-369/03-301 & 50-370/03-301, Final Combined Ro/Sro Written Exam with Kas, Answers, References, & Analysis ML0321002242003-06-16016 June 2003 June 2003 Exam 50-369/03-301 & 50-370/03, Written Exam ML0321103322003-06-16016 June 2003 June 2003 Exam 50-369/03-301 & 50-370/03-301, Final Ro/Sro Written Exam References ML0321002272003-06-16016 June 2003 June 2003 Exam 50-369/03-301 & 50-370/03-301, Written Exam ML0306603912003-03-0707 March 2003 Reactor and Senior Reactor Operator Initial Examinations - McGuire Nuclear Station 50-369/03-301 and 50-370/03-301 ML0227001272002-09-26026 September 2002 Er 05000369-02-302 and 05000370-02-302, on 07/15/2002 and 08/29/2002, McGuire Nuclear Station, Units 1 and 2 Licensed Operator Retake Examinations ML0220502652002-07-16016 July 2002 Response to NRC Regulatory Issue Summary 2002-09, Supplement Preparation and Scheduling of Operator Licensing Examinations 2023-09-20
[Table view] |
Text
UNITED STATES ary 23, 2014
SUBJECT:
MCGUIRE NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000369/2013301 AND 05000370/2013301
Dear Mr. Capps:
During the period December 2 - 6, 2013, the Nuclear Regulatory Commission (NRC)
administered operating tests to employees of your company who had applied for licenses to operate the McGuire Nuclear Plant Units 1 and 2. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on December 12, 2013.
All applicants passed both the operating test and written examination. There were no post-administration comments. A Simulator Fidelity Report is included in this report as Enclosure 2.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket No.: 50-369, 50-370 License No.: NPF-9, NPF-17
Enclosures:
1. Report Details 2. Simulator Fidelity Report
REGION II==
Docket No.: 50-369, 50-370 License No.: NPF-9, NPF-17 Report No.: 05000369/2013301 and 05000370/2013301 Licensee: Duke Power Facility: McGuire Nuclear Plant, Units 1 & 2 Location: Huntersville, NC 28078 Dates: Operating Test - December 2 - 6, 2013 Written Examination - December 12, 2013 Examiners: G. Laska, Chief Examiner, Senior Operations Examiner A. Goldau, Operations Engineer N. Lacy, Operations Engineer J. DeMarshall, Operations Engineer, NRO Approved by: Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Enclosure 1
SUMMARY ER 05000369/2013301, 05000370/2013301; December 2 - 6, 2013 & December 12, 2013; McGuire Nuclear Plant, Units 1 and 2, Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the McGuire Nuclear Plant staff developed both the operating tests and the written examination.
The NRC administered the operating tests during the period December 2 - 6, 2013. Members of the McGuire Nuclear Plant training staff administered the written examination on December 12, 2013. All applicants passed both the operating test and written examination. Ten applicants were issued licenses commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope Members of the McGuire Nuclear Plant staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC examiners evaluated five Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period December 2 - 6, 2013.
Members of the McGuire Nuclear Plant training staff administered the written examination on December 12, 2013. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the McGuire Nuclear Plant, met the requirements specified in 10 CFR Part 55, Operators Licenses.
b. Findings No findings were identified.
The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee did not submit any post-examination comments. A copy of the final written examinations and answer keys, with all changes incorporated, may be accessed not earlier than December 14, 2015, in the ADAMS system (ADAMS Accession Number(s)
ML14014A062 and ML14014A063).
4OA6 Meetings, Including Exit Exit Meeting Summary On December 6, 2013, the NRC examination team discussed generic issues associated with the operating test with Mr. C. Morris, Plant Manager, and members of the McGuire Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT Licensee personnel C. Morris, Plant Manager P. Schuerger, Training Manager B. Anderson, Operations Manager R. Pope, Operations Training Manager W. Killette, Operations Exam Team Supervisor C. Cornwell, Assistant Operations Manager-Shift W. Hoyle, Assistant Operations Manager-Training S. Helms, Initial Licensed Operator Training Supervisor S. Mosteller, Operations Training Exam Team C. Fletcher, Operations Training Exam Team Lead NRC personnel J. Zeiler, Senior Resident Inspector
SIMULATOR FIDELITY REPORT Facility Licensee: McGuire Nuclear Plant Facility Docket No.: 05000369/2013301 and 05000370/2013301 Operating Test Administered: December 2-6, 2013.
This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, examiners observed the following:
Item Description Digital Output Card 01-4- During a simulator examination scenario digital output card 01-4-14 DO failed 14DO failed. This caused a loss of the Rod Motion Display Recorder, Main Generator MW and MVAR displays. SDR-914 was written to address the issue. This failure was also documented in PIP M-13-10977.
Digital Output Card 01-4- During a simulator examination scenario digital output card 01-4-06 DO failed 06DO failed. This caused a loss of the Rods In Motion light, Rods Out Motion light, DCS alarm horn, 1A, 1B, and1C CRD Vent fan on and off lights. SDR-915 was written to address the issue. This failure was also documented in PIP M-13-10977.
TDCA pump Tripped During one of the exam scenarios the TDCA pump tripped unexpectedly unexpectedly. This same scenario was used two additional times without duplicating the pump trip. SDR-917 was written to address the issue. This failure was also documented in PIP M-13-10977.
The OAC program MONL During JPM development and JPM validation the OAC MONL did not function as program did not function as expected. SDR-916 was written to expected. address the issue. This failure was also documented in PIP M-13-10977.
1CF Pump Suction Meter During an examination JPM 1CF Pump Suction meter 1CMP-5970 stayed at mid-scale would not move from mid-scale. It did not appear to be mechanically bound. SDR-913 was written to address the issue.
This failure was also documented in PIP M-13-10977.
Upper Surge Tank level During an exam scenario Upper Surge Tank level continued to decreased with make-up decrease even after make-up was aligned SDR-832 was written to aligned address the issue. This failure was also documented in PIP M-13-10977.
Enclosure 2