IR 05000369/2013403
| ML13098A354 | |
| Person / Time | |
|---|---|
| Site: | Mcguire, McGuire |
| Issue date: | 04/05/2013 |
| From: | Mark King NRC/RGN-II/DRS/EB2 |
| To: | Capps S Duke Energy Corp |
| References | |
| IR-13-403 | |
| Preceding documents: |
|
| Download: ML13098A354 (5) | |
Text
April 5, 2013
SUBJECT:
WILLIAM B. MCGUIRE NUCLEAR PLANT-COMPLETION OF CYBER SECURITY TI MILESTONES 1-7 INSPECTION (NRC INSPECTION REPORT NO. 05000369/2013403 & 05000370/2013403)
Dear Mr. Capps:
On February 1, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your William B. McGuire Nuclear Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on February 1, 2013, with Mr. Steven Capps, and other members of your staff. On February 21, 2013 the NRC conducted an exit meeting by telephone with members of your staff to discuss the inspection findings.
The inspection examined activities conducted under your license as they relate to safety and compliance with the commissions rules and regulations and with the conditions of your license related to the implementation of interim cyber security milestones. The inspection was conducted in accordance with NRC Temporary Instruction (TI) 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information
- Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Michael F. King, Chief Engineering Branch 2 Division of Reactor Safety
Docket No.:
50-369 & 370 License No.: NPF-9 & 17
Enclosure: Inspection Report No. 05000369/2013403 and 0500370/2013403 w/ Attachment: Supplemental Information (Official Use Only)
cc: (See page 3)
_________________________
xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS CONTRACTOR RII:DRP RII:DRS
NAME R. FANNER M. SINGLETARY M. SHINN J. BARTLEY M. KING
DATE 4/4/2013 4/4/2013 4/2/2013 4/4/2013 4/5/2013 4/ /2013 4/ /2013 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:
H. Duncan Brewer Organizational Effectiveness Manager McGuire Nuclear Station Duke Energy Corporation 12700 Hagers Ferry Road Huntersville, NC 28078-9340
Kenneth L. Ashe Regulatory Compliance Manager McGuire Nuclear Station Duke Energy Corporation MN01RC 12700 Hagers Ferry Road Huntersville, NC 28078-8985
Scotty R. Russ Security Manager McGuire Nuclear Station Duke Energy Corporation 12700 Hagers Ferry Road Huntersville, NC 28078-9340
Christopher T. Osborn Security Safeguards Administrator McGuire Nuclear Station Duke Energy Corporation 12700 Hagers Ferry Road Huntersville, NC 28078-9340
M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation P. O. Box 1006 526 S. Church Street Charlotte, NC 28201-1006
David G. Black Fleet Security Manager General Office Duke Energy Corporation P. O. Box 1006 526 S. Church Street Charlotte, NC 28201-1006
Timothy J. Wadsworth Security Specialist General Office Duke Energy Corporation P. O. Box 1006 526 S. Church St., EC05P Charlotte, NC 28201-1006
David A. Cummings Associate General Counsel General Office Duke Energy Corporation P.O. Box 1006 526 S. Church St., EC07H Charlotte, NC 28201-1006 Letter to Steven from Michael F. King dated April 5, 2013.
SUBJECT:
WILLIAM B. MCGUIRE NUCLEAR PLANT-COMPLETION OF CYBER SECURITY TI MILESTONES 1-7 INSPECTION (NRC INSPECTION REPORT NO. 05000369/2013403 & 05000370/2013403)
Distribution:
B. Westreich, NSIR (hard copy w/encl)
G. West Jr., NSIR (hard copy w/encl)
RIDSNRRDIRS PUBLIC