ML17297B153

From kanterella
Revision as of 11:34, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Confirms Requirements of Emergency Notification Sys & Health Physics Network Re Fuel Shipment on 820401 & Fuel Loading in Nov 1982.Coordination of Efforts Requested in Order to Meet Scheduled Dates
ML17297B153
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/05/1982
From: Andognini G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Mckeuua T
NRC
References
NOS-82-2, NUDOCS 8201130001
Download: ML17297B153 (5)


Text

REGUl. DRY. I VFORMAT ION D'1STRIBUT i SYSTEi4I (RIOS)

ACCESSION( NBR; 8291,130001. OOC(o DA>>TK.: 82'/01/05 NO>>T(ARK ZEO,: NO DOCK KIT FACIL>> STN-50-528" Philol V'er de Nuclear Statiopi Unit>> ir. Ar iiona Publi 05000528" AU TH NAP)El AU'THOR Ar F(1 L(I'AT(ION ANDOGNI>>4>>I.,'G'.Cl.'ri zonal PUb>>lii c'ervi ce C'o(.,

RECiiP',NA>>RE( RKCIIP(IE(ViT( AFF>>ILtATIOiV HCKEUUAiT>> NRCI No; O'eta.>led Af'filiation Given>>

SUBJEC(T.: Conf i'rms require((ants o(f>> emergency no(t:i f icetion>> sys 8 he'ail th physi ce netwo(rk re fuel shipment op 820'((01 L fuel loading ini

>>Vov 19S2.Gbppdinaitiiopi o(f! ef fog ts requested in>> o>>rder. to( meeti scheduled< da,tes.

DISTRIBUTiION COOK(: 9001S COP(IES RECE'I VED: LITR i( ENCLI ~ SIZ K ~ m eo"mR ws re ee ee ee m m TITLE! PSAR/FSAR Al~)DITS and>> Related Correspondence

>>VOTES:Stands'rdi zed Pilisht;,1>> cy.'C. Grimes 05000528'CTION:

REC(IPiI E(VT( COP>>IES REC(IP I EN>>T( COP>>IES IDI CQDK</>>V%SKI LIT(TR ENCL> IO( COOK>>/N A(>>IKI Ltl'A ENCLI A/D LIICKNSVGI'IIC(

1. LII'Ci BR 83 8CI BRI 03 LIAI 1>> I>>'KRRIGA>>V'i J(e>> 01 INTERNALI; ELD 1>> IEi 06 IK/OEP/EPOB( 35( ir I E>>/OEP /KPLB( ' 36

>>iiP A NRR/OK/CK8 1, i NRR/OE>>/KGB( 13>> NRR/OE(/GB, 28 2 iVRR/OK'/HGEB( 30 2 NRR/DE/>>4lKB 18 i NRR/OE'/HTEB( 1.7 1>> NRR/OE>>/GAB>> 21 1

>>VRR/DE'/SAS( 1. NRR/DE/SES>> 25>> 1 2(('RR/DHF6/HFEB40 1>> 'NRR/OHF8/LQB( 32 1 NRR/DHFS/OLB NRR/OHFS/Pil'R820 i 26 34'RR/OSii/AEB(

1 NRR/DSI/ASSI 27- 1 ~

NRR/DSiI/CPBi 10 NRR/DSI/CSS( 09 l.

i4RR/OS(i/EITGB( 12. i>> >>VRR/DS I/IC88( 16 1 N RR/OSiI/PSB" 1,9 NRR/OS I/RABi'2 1 NRR/OSii/RSBi 23>> 1>> NRR/OST/LGB( 33 1 0 ((" 1>>

EXTERNALI: ACRS (I"I>> 1b 1 BNLI( A>><ID>>TG( OIVL(Y3'POR 1.

FK'>>IA, REP( OiIV( 39 08 i>>

>>VRCl iVT'IS POR'2. 1>>

1>>

1.

NSICI 05 1 A

O TOTALl NUvlBER OF( COP (IKS RKQU'IRKO'ITTR + KNCLI P5

h NOS 82-2 RKR IPGIIEaktlR IZBEIGttttttttlt OMWHK3SHW P.O. BOX 21666 - PHOENIX, ARIZONA 85036 G. CARL ANDOGNINI VICE PRESIDENT ELECTRIC OPERATIONS January 5, 1982 6'gy e >leg a Mr. Thomas McKenna DC@

US Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. McKenna:

Arizona Public Service Company intends to receive the first shipment fuel for Palo Verde Nuclear Generating Station (PVNGS) Unit of'uclear No. 1 onsite approximately April 1, 1982, and to load fuel in Unit No. 1 in November, 1982.

As a result of a telephone conversation between Mr. Michael J. McEwan of my office and Mr. Stu Cohen of Inspection and, Enforcement, we understand that the Emergency Notification System (ENS) is required in the following locations:

A. Control Room B. NRC Resident Inpsector's Office C. Shift Supervisor's Office D. Technical Support Center (TSC)

E. Emergency Operations Facility (EOF)

While locations A and B must be operational at the time fuel is received, all locations must be operational prior to fuel loading.

In addition, we understand that the Health Physics Network (HPN) is re-quired in:

A. NRC Resident Inspector's Office B. Health Physics Office C. Technical Support Center (TSC)

D. Emergency Operations Facility (EOF)

The phone in the Resident Inspector's Office must be operational at the time fuel is received and the other locations must be operational prior to fuel loading.

telephone system at PVNGS is a privately owned system which inter-connects with the Mountain Bell Telephone System.

gool 5

820k i30b0 P,DR.'he

/

ADOCK'0 j'DR 820,l05 SOOOSp8

Jf P

~ ( ,.

E))k ~p'f r.;

k

Mr. Thomas McKenna January 5, 1982 Page 2 Please contact Mr. Michael J. McEwan, telephone no. (602) 271-3347, so that we may coordinate our efforts with yours in order to meet the scheduled fuel receipt and load dates.

Yours very truly, G C.

President dogn'ice Electric Operations GCA/MJM/jc CC: E. E. VanBrunt, Jr.

F. W. Hartley J. Vorees L. E. Brown S. R. Frost M. J. McEwan