ML19262F302

From kanterella
Revision as of 07:16, 26 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Addl Info Re Environ Qualification of Electrical Equipment,In Response to NUREG-0588
ML19262F302
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/30/1980
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0588, RTR-NUREG-588 NUDOCS 8011040308
Download: ML19262F302 (35)


Text

    • 1*

600 North 18th street Post Office Box 2641 k*

gf e.g Birmingham. Alabama 35291 Telephone 205 250-1000 hko*,Ve" ife"eni m

,

Alabama Power the soumem eectre sntem October 30, 1980 Docket No. 50-364 ,

Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Phillips Building, Room 116 7920 Norfolk Avenue Washington, D. C. 20555 Attention: Mr. A. Schwencer Gentlemen:

JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 2 ENVIRONMENTAL QUALIFICATION REVIEW Enclosed is additional infonnation on Farley Nuclear Plant Unit 2 concerning environmental qualification of electrical equipment. This

'

report is supplemental to the response to NUREG 0588 dated September 12, 1980 and the infonnation transmitted by letter of October 10, 1980.

Specifically, this submittal includes the following:

- Acceptability of equipment qualification inside containment in light of the revised steam line break analysis for Farley.

- Corrections to a number of master list sheets and component worksheets.

- The information requested at the NUREG 0588 Audit exit meeting at Plant Farley on September 24, 1980, including the compiled responses to questions 3, 4, and 5 wnich were not available for the October 10 submittal.

The enclosed package constitutes a revision to the September 12 submittal and the pages are to be inserted in accordance with the t instructions provided with the enclosure.

Mis--

S

//

A s021040 9 s

. . . . .

. . .

. . . _

Director of Nuclear Reactor Regulation October 30, 1980 U. S. Nuclear Regulatory Comissicn Page 2

.

If you have any questions, please advise.

Yours truly,

'

f fAm ' bY F.L.Clayton,fr.

-

TLC:de Enclosure SWORN TO AND SUSSCRIBED BEFORE ME THIS S f 4 % DAY OF cc: Mr. R. A. Thomas Cef,'h 1980.

Mr. G. F. Trowbridge Mr. W. H. Bradford br'.2. s to z .

Aa -J A otary Public My Comission Expires:

2.- /T- S2 t

4