Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17348A5661990-09-14014 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. ML17348A5461990-09-0707 September 1990 Forwards 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities 900206-0404 First Refueling Outage Second Period Second Insp Interval. ML17348A5501990-09-0707 September 1990 Forwards Jul 1990 Integrated Schedule Regulatory Rept for Facilities ML17348A5521990-09-0606 September 1990 Forwards Matrix of Changes to Emergency Power Sys That Affect Revised Tech Specs Issued on 900828.Matrix Sent for Info & to Assist in NRC Review of No Significant Hazards Rept for Revised Tech Specs ML17348A5431990-08-31031 August 1990 Forwards Objectives for 901108 Emergency Plan Exercise. Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Not Be Evaluated by FEMA ML17348A5361990-08-27027 August 1990 Forwards Turkey Point Units 3 & 4 Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Health Physics Procedure HP-48, Process Control Program for Dewatering Radwaste Liners. ML17348A5171990-08-24024 August 1990 Forwards Ref Matl in Preparation for Operator License Exams Scheduled for Wk of 901029,per NRC 900628 Request ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 ML17348A5051990-08-15015 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Turkey Point Units 3 & 4 & Revise Rept for June 1990 for Unit 3 ML20059B0111990-08-14014 August 1990 Requests That Encl Intervenor Motion for Extension of Time to Appeal to Docketing & Svcs Branch Re Tech Spec Replacement Hearing Be Provided.Motion Inadvertently Omitted in Svc of Request on 900813 ML17348A4971990-08-10010 August 1990 Responds to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18.Corrective Actions:Unit Stabilized in Mode 3, Operating Surveillance Procedures 3/4-OSP-089 Revised & Event Response Team Formed ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing L-90-282, Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790)1990-07-25025 July 1990 Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790) ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17348A4691990-07-23023 July 1990 Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request ML17348A4191990-07-20020 July 1990 Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921 ML17348A4201990-07-20020 July 1990 Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per 890605 Ltr ML17348A4141990-07-20020 July 1990 Responds to Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14.Corrective Actions:Breakers Closed,Returning Monitoring Sys to Operable Level & Briefings Held to Explain Rvlms Sys Theory to Operations Control Room Personnel ML17348A4171990-07-19019 July 1990 Forwards May 1990 Integrated Schedule Regulatory Rept for Plant ML17348A4121990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML17348A4251990-07-17017 July 1990 Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition IR 05000250/19900131990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML20055G8641990-07-16016 July 1990 Informs ASLB That Petitioners Ref to Several Telephone Contacts Between J Butler & M Gutman,Of ATI Career Training Inst Is Inadvertent Misstatement & Should Be Changed to Telephone Contact. W/Certificate of Svc ML17348A4161990-07-16016 July 1990 Responds to Commitment Re Reverse Testing of Containment Isolation Valves Per Insp Repts 50-250/90-13 & 50-251/90-13. Corrective Action Plan Addresses Penetrations 16 & 53 for Unit 3 Only & Penetrations 11,47,54A & 54B for Both Units ML17348A4151990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML17348A4041990-07-12012 July 1990 Forwards Addl Info Re Responses to NRC Questions on Piping Codes Used for Emergency Power Sys Enhancement Project ML17348A3921990-07-12012 July 1990 Summarizes Facility Performance Since Last SALP Evaluation Period Which Ended 890731.Util Pursued Aggressive self- Assessment Program,Including Significant Internal or Outside Assessments in Areas of Operator Performance & EOPs L-90-261, Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld1990-07-11011 July 1990 Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld L-90-259, Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3))1990-07-11011 July 1990 Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) ML17348A4321990-07-11011 July 1990 Forwards Rev 8 to Updated FSAR for Turkey Point Units 3 & 4. Rev Includes Activities Completed Between 890123 & 900122. Rept of Changes for Jul 1989 Through June 1990 Will Be Provided by 900901 ML17348A3941990-07-0909 July 1990 Forwards Requested Addl Info Re Emergency Power Sys Enhancement Project.Specific Detailed Changes Will Be Made to Procedures to Address Mods Affecting Equipment Relied Upon for Safe Shutdown ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17348A4311990-07-0505 July 1990 Documents Written & Verbal Request of Region II Personnel for Temporary Waiver of Compliance of Tech Spec 3.4.2.b.1 Re Allowable Out of Svc Time for One Emergency Containment Cooler from 24 H to 72 Hr W/Addl Reasons ML17348A3851990-07-0303 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/90-08 & 50-251/90-08.Corrective Actions:Training Dept Increased Emphasis on Radiological Postings in Radiation Worker Training ML17348A3711990-07-0303 July 1990 Responds to NRC 900524 Request for Addl Info on Emergency Power Sys Enhancement Project ML17348A3671990-07-0303 July 1990 Confirms Util Intentions Not to Operate Beyond Refueling Outage That Represents Last Outage Re NRC Bulletin 89-001 ML17348A3841990-06-29029 June 1990 Forwards LER 90-11 on 900609 Re hi-hi Steam Generator Water Level Turbine Trip & Subsequent Reactor Trip Due to Failure of Switch in Feedwater Valve Controller Hand/Auto Station. W/O Encl ML17348A3601990-06-29029 June 1990 Responds to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. Test Procedures Developed & Under Mgt Review Reflecting Revised Inservice Testing Program ML17348A3621990-06-28028 June 1990 Notifies That Senior Operator License SOP-20177-2 Will Be Terminated,Effective 900731 ML17348A3651990-06-28028 June 1990 Advises That Completion of safety-related motor-operated Valve Testing & Surveillance Will Be Completed by June 1990, Per Generic Ltr 89-10 Requirements ML17348A3591990-06-27027 June 1990 Responds to Violations Noted in Insp Repts 50-250/90-09 & 50-251/90-09.Corrective Actions:Specialist Counselled on Importance of Stopping Procedure When Steps Conflict W/ Condition of Plant & Procedure Use Guidelines Reviewed ML17348A3641990-06-27027 June 1990 Responds to Generic Ltr 90-04, Status of Licensee Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions. ML17348A3861990-06-27027 June 1990 Advises That New Date for Submittal of Response to Insp Repts 50-250/90-09 & 50-251/90-09 Is 900702 ML17348A3551990-06-21021 June 1990 Responds to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Five Untraceable Circuit Breakers Installed in Unit 3 safety-related Sys.All Five Breakers Replaced W/Traceable Breakers ML20055D9201990-06-20020 June 1990 Advises That Sp Frantz Will Represent Licensee in Argument Scheduled for 900710.Certificate of Svc Encl ML17348A3181990-06-19019 June 1990 Forwards Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects for Turkey Point Nuclear Power Plant, Per NRC Bulletin 88-008 ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17348A2871990-06-0808 June 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S350W Swing Check Valves or Valves of Similar Design. Bolt Replacement Performed ML17348A2861990-06-0808 June 1990 Advises That Info Re Operating History of Select Fuel Assemblies Sent to ORNL Between 900419 & 26,per 900510 Request ML17348A2781990-06-0404 June 1990 Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info 1990-09-07
[Table view] |
Text
ACCELERATED DISTIUBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9004170194 DOC.DATE: 90/04/05 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards implementation status for facility re Generic Ltr 83-28, "Required Actions Based on Generic Implications...."
DISTRIBUTION CODE: A055D COPIES RECEIVED:LTR TITLE: OR/Licensing Submittal: Salem ATWS Q
Events ENCL ~
GL-83-28 SIZE:
NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 3 3 EDISON,G 1 1 INTERNAL: NRR/DEST/ESB 8D 1 1 NRR/DLPQ/LPEB10 1 0 NRR/DOEA/OGCB11 1 0 NRR/DST/SICB 7E 1 1 NRR/DST/SPLB 8D 1 0 NUDOCS-ABSTRACT 1 1 1 0 OGC/HDS2 1 0 REG FIL 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 . 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASFEl CONTACT THE, DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 12
P f 4
r
P.O. Box 14000, Juno Beach, FL 33408-0420 APR 5 1990 L-90-95 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkey Point Units 3 and 4
" Docket Nos. 50-250 and 50-251 Status of Implementation Required Actions Based on Generic Implications of Salem ATWS Events Generic Letter 83-28 Generic Letter 83-28, "Required Actions Based on Generic Implications of Salem ATWS Events," issued July 8, 1983, required licensees to take certain actions to address issues related to reactor trip system reliability and general management capability.
Your letter of October 4, 1989 (Gordon E. Edison to J. H. Goldberg) requested that Florida, Power & Light Company (FPL) provide a status of implementation, of',actions required by Generic Letter 83-28.
Attached is the implementation status for Turkey Point. Units 3 and 4 ~
Should there be any questions on the attached information, please contact us.
Very truly yours, N arri Vice resident Turk Point, Nuclear Plant KNH/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9004170l94 900405 05000250 PDR AGOCK P PQC an FPL Group company
4
~P~ r.
4 tt
ATTACHMENT Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Status of Implementation Required Actions Based on Generic Implications of Salem ATWS Events Generic Letter 83-28 Item 1.1, Post-Trip Review - Program Description and Procedure (NRC TAC Nos. 52810 and 52811)
Item 1.1 required licensees to describe their program for ensuring that unscheduled reactor shutdowns are analyzed and that a determination is made that the plant can be restarted safely.
By letters dated November 8, 1983 (FPL letter No. L-83-555) and May 31, 1985 (FPL letter No. L-85-214) FPL provided information regarding its post-trip review program and procedures for Turkey Point Units 3 and 4. By letter dated June 25, 1985, the NRC provided a Safety Evaluation Report (SER) stating that the post-trip review program and procedures were acceptable. There are no actions remaining.
Item 1.2, Post-Trip Review - Data and Information Capability (NRC TAC Nos. 53643 and 53644)
Item 1.2 required that licensees have or have planned a capability to record, recall and display data and information to permit diagnosing the causes of unscheduled reactor shutdowns prior to restart for ascertaining the proper functioning of safety-related equipment.
By letters dated November 8, 1983 (FPL letter No. L-83-555) and September 27, 1985 (FPL letter No. L-85-364), and by telephone on August 15, 1985, FPL provided information regarding its post-trip review program data and information capabilities for Turkey Point Units 3 and 4. By letter dated November 27, 1985 the NRC provided an SER stating that, the post-trip review data and information capabilities were acceptable. There are no actions remaining.
Item 2.1, Equipment Classification and Vendor Interface - Reactor Trip System Components (NRC TAC Nos. 52891 and 52892)
Item 2.1 required licensees to confirm that all components whose functioning is required to trip the reactor are identified as safety-related on all plant documentation and in information handling systems that are used to control all activities performed on the safety-related equipment, and to confirm that an interface has been established with the Nuclear Steam Supply System (NSSS) vendor or with the vendors of each of the components of the reactor trip system.
By letters dated November 8, 1983 (FPL letter No. L-83-555) and April 17, 1987 (FPL letter No. L-87-174) FPL provided the confirmation required by Item 2.1.
By letter dated September 2, 1988 the NRC provided an SER that concluded that the programs described by FPL met the requirements of Item 2.1 (Parts 1 and 2) and were acceptable. There are no actions remaining.
Item 2.2, Equipment Classification and Vendor Interface - Programs for All Safety-Related Components (NRC TAC Nos. 53726 and 53727)
Item 2.2 required licensees to describe their program for ensuring that all components of safety-related systems necessary for accomplishing required safety functions are identified as safety-related on plant documentation used to control safety-related activities, and to establish, implement, and maintain a continuing program to ensure that vendor information for safety-related components is complete, current and controlled throughout the life of the plant, and appropriately referenced or incorporated in plant instructions and procedures.
By letters dated November 8, 1983 (FPL letter No. L-83-555),
October 19, 1984 (FPL letter No. L-84-290), June 14, 1985 (FPL letter No. L-85-233), and April 17, 1987 (FPL letter No. L-87-174)
FPL provided information in response to the requirements of Item 2.2.
The NRC has not yet completed its review of this item.
Item 3.1, Post-Maintenance Testing - Reactor Trip System Components (NRC TAC Nos. 52972 and 52973, 53053 and 53054)
Item 3.1 required that licensees submit the results of their review of test and maintenance procedures and Technical Specifications to assure that post-maintenance operability testing of safety-related components in the reactor trip system is required to be conducted and that the testing demonstrates that the equipment is capable of performing its safety functions before being returned to service.
It also required licensees to submit the results of their checks of vendor and engineering recommendations to ensure that any appropriate test guidance is included in the test and maintenance procedures or the Technical Specifications, where required, and
- identify, existing if applicable, any post-maintenance test, requirements in Technical Specifications which can be demonstrated to degrade rather than enhance safety.
By letters dated November 8, 1983 (FPL letter No. L-83-555), June 19, 1986 (FPL letter No. L-86-258) and July 31, 1986 (FPL letter No. L-86-294) FPL provided information in response to the requirements of Item 3.1. By letters dated November 14, 1985 and January 14, 1987 the NRC provided SERs stating that FPL's responses were acceptable and met the intent of the generic letter. A re-
~ 'review of the Rea or Trip System as part o the Select System Review was completed (SEG Phase II Report dated December 1, 1986).
There are no actions remaining.
Item 3.2, Post-Maintenance Testing - All Other Safety-Related Systems (NRC TAC Nos. 53809 and 53810, 53892 and 53893)
Item 3.2 required that licensees submit a report documenting the extending of test and maintenance procedure and Technical Specifications review to assure that post-maintenance operability testing of all safety-related equipment is required to be conducted and that the testing demonstrates that the equipment is capable of performing its safety functions before being returned to service.
It also required licensees to submit the results of their check of vendor and engineering recommendations to ensure that any appropriate test guidance is included in the test and maintenance procedures or the Technical Specifications where required, and to identify, if applicable, any post-maintenance test requirements in existing Technical Specifications which are perceived to degrade rather than enhance safety.
By letters dated November 8, 1983 (FPL letter No. L-83-555) and July 31, 1986 (FPL letter No. L-86-294) FPL provided information in response to the requirements of Item 3.2. By letters dated November 14, 1985 and January 14, 1987, the NRC provided SERs stating that FPL's responses were acceptable and met the intent of the generic letter. FPL's program to update vendor manuals was completed in November 1987. The Select System Reviews identified in the January 14, 1987 SER were completed and documented in the SEG Phase II Select System Review Reports issued in December 1986 and October 1989, and in the Design Basis Verification Reports issued in May and June 1989. As discussed in Item 3.2.1 in the January 14, 1987 SER, FPL committed to a re-review of existing maintenance procedures to ensure that post maintenance testing adequately verifies component capability to perform all required safety functions. The current requirements for post maintenance testing are embodied in the Post Maintenance Test procedure, AP-0190.28, with support from the Plant Work Order Preparation procedure, 0-ADM-701. The PWO procedure requires that a PWO include post maintenance test instructions using the guidelines of procedure AP-0190.28. The post maintenance procedure sets forth the minimum testing criteria required to ensure that safety-related equipment is capable of performing all required safety functions following the completion of maintenance. The additional reviews of test and maintenance procedures to ensure that appropriate vendor and engineering recommendations for testing and maintenance are incorporated are scheduled to be completed by September 1, 1990
'tem 4.1, Reactor Trip System Reliability - Vendor-Related Modifications (NRC TAC Nos. 53107 and 53108) '
Item 4.1 required that all vendor-recommended reactor trip breaker modifications be reviewed to verify that. either: (1) each modification has, in fact, been implemented; or (2) a written evaluation of the technical reason for not implementing a modification exists.
- For example, the ification recommended by stinghouse in NCD Elec-18 for the DB-50 breakers and a March 31, 1983, letter for the J)S-416 breakers shall be implemented or a justification for not implementing shall be made available. Modification not previously made shall be incorporated or a written evaluation shall be provided.
By letter dated November 8, 1983 (FPL letter No. L-83-555) FPL provided information in response to Item 4.1. By letter dated May 1, 1986, the NRC provided an SER .stating that FPL's response was acceptable and met the intent of the generic letter. There are no actions remaining.
Item 4.2, Reactor Trip System Reliability - Preventative Maintenance and Surveillance Program for Reactor Trip Breakers (NRC TAC Nos. 53160 and 53161, 53947 and 43948)
Item 4.2 required that licensees describe their preventative maintenance and surveillance program to ensure reliable reactor trip breaker operation. The program was required to include the following:
- 1. A planned program of periodic maintenance, including lubrication, housekeeping, and other items recommended by the equipment supplier.
- 2. Trending of parameters affecting operation and measured during testing to forecast degradation of operability.
- 3. Life testing of the breakers (including the trip attachments) on an acceptable sample size.
- 4. Periodic replacement of breakers or components consistent with demonstrated life cycles.
By letters dated November 8, 1983 (FPL letter No. L-83-555) and January 18, 1985 (FPL letter No. L-85-31) FPL provided information in response to Item 4.2. By letter dated April 29, 1985 the NRC provided an SER stating that FPL's responses for Items 4.2.1 and 4.2.2 were acceptable. The trending program committed to in our January 18, 1985 letter was implemented by August 1985. The NRC has not yet completed its review of Items 4.2.3 and 4.2.4.
Item 4.3, Reactor Trip System Reliability - Automatic Actuation of Shunt Trip Attachment for Westinghouse and B 6 W Plants (NRC TAC 53202 and 53203, 55384 and 55385)
Item 4.3 required that Westinghouse and B & W reactors be modified by providing automatic reactor trip system actuation of the breaker shunt trip attachments. The shunt trip attachment was required to be considered safety related (Class IE).
By letters dated November 8, 1983 (FPL letter No. L-83-555), July 16, 1984 (FPL letter No. L-84-177) and November 29, 1984 (FPL letter No. L-84-351) FPL provided information in response to Item 4.3. By letter dated December 3, 1984, the NRC provided an SER concluding that FPL's proposed design modifications were acceptable-
and satisfied the pre-implementation review requirements of Item 4.3. The December 3, 1984 NRC letter requested that FPL provide confirmation of the seismic qualification of the shunt trip when the Westinghouse Owners Group qualification program was complete, and also submit proposed Technical Specifications to require periodic testing of the undervoltage shunt trip functions and the manual reactor trip switch contacts and wiring. Additional guidance on Technical Specifications was provided by the NRC in Generic Letter 85-09, "Technical Specifications for Generic Letter 83-28, Item 4.3,- dated May 23, 1985.
The required modifications were implemented in Unit 3 by July, 1985 (PCM 85-03) and in Unit, 4 by June, 1986 (PCM 85-04). Qualification testing of the shunt trip attachments used with Westinghouse Type DB-50 reactor trip circuit breakers (as used at Turkey Point) was completed and a report (WCAP 8687, Supplement 2-E62B, Addendum 1, Rev. 0) issued in April 1986. The testing demonstrated the ability of the shunt trip attachment to maintain its structural integrity and functional operability during and after a seismic event. FPL reviewed the Westinghouse Equipment Qualification Test Report for the DB-50 shunt trip attachment and found Point. As stated in FPL letter No.
it L-87-174 acceptable for Turkey dated April 17, 1987, proposed Technical Specifications changes were submitted as part of the Technical Specification Upgrade effort on September 29, 1986. That submittal has been superseded by our 'June 5, 1989 submittal (FPL letter No. L-89-201). That submittal is being reviewed by the NRC.
Item 4.4, Reactor Trip System Reliability - Improvements in Maintenance and Test Procedures for B & W Plants)
This action applied to B & W licensees and OL applicants only.
Item 4.5, Reactor Trip System Reliability - System Functional Testing (NRC TAC Nos. 54119 and 54120, 54036 and 54037)
Item 4.5 required that licensees perform on-line functional testing of the reactor trip system, including independent testing of the diverse trip features:
1 ~ The diverse trip features to be tested include the breaker undervoltage and shunt trip features.
2 ~ Plants not currently designed to permit, periodic on-line testing shall justify not making modifications to permit such testing. Alternatives to on-line testing proposed by licensees will be considered where special circumstances exist and where the objective of high reliability can be met in another way.
3 ~ Existing intervals for on-line functional testing required by Technical Specifications shall be reviewed to determine that the intervals are consistent with achieving high reactor trip system availability when accounting for considerations such as:
1~ uncertainties in component failure rates 2 ~ uncertainty in common mode failure rates 3 ~ reduced redundancy, during testing 4 ~ operator errors during testing
- 5. component <<wear-our" caused by the testing Licensees currently not performing periodic on-line testing shall determine appropriate test intervals as described above. Changes to existing required intervals for on-line testing as well as the intervals to be determined by licensees currently not performing on-line testing shall be justified by information on the sensitivity of reactor trip system availability to parameters such as the test intervals, component failure rates, and common mode failure rates.
By letter dated November 8, 1983 (FPL letter No. L-83-555) FPL provided information in response to Item 4.5. In addition, the Westinghouse Owners Group provided information regarding Item 4.5.3 for all Westinghouse plants in a report, WCAP 10271 dated January 1983, followed by supplements in 1983 and 1986. By letters dated May 1, 1986 and June 12, 1989, the NRC provided SERs for Item 4.5.1, and for Items 4.5.2 and 4.5.3 respectively, concluding that FPL's response, as supplemented by the Westinghouse Owners Group reports, was acceptable and met the intent of the generic letter.
There are no actions remaining.