Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18017A9151999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr ML18017A8361999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr ML18016B0151999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr ML18016A9851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr ML18016A9581999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18016A8041999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr ML18016A7801998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr ML18016A7671998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr ML18016A7201998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr ML18016A6201998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr ML18016A5881998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr ML18016A5071998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr ML18016A4861998-06-30030 June 1998 Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr ML18016A4521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr ML18022B0521998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Shearon Harris Nuclear Power Plant.W/980514 Ltr ML18016A3901998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for SHNPP.W/980414 Ltr ML18016A3511998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for SHNPP.W/980313 Ltr ML18016A3181998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Shearon Harris Nuclear Power Plant.W/980212 Ltr ML18016A2851997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1.W/980114 Ltr ML18016A2651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Shearon Harris Nuclear Power Plant.W/971216 Ltr ML18016A2291997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Shearon Harris Nuclear Power Plant.W/971114 Ltr ML18016A2121997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Shearon Harris Nuclear Power Plant,Unit 1.W/971014 Ltr ML18016A1871997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Shearon Harris Nuclear Plant.W/970911 Ltr ML18012A8591997-07-31031 July 1997 Monthly Operating Rept for July 1997 for SHNPP.W/970813 Ltr ML18012A8321997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Shearon Harris Nuclear Power Plant.W/970711 Ltr ML18012A8131997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Shearon Harris NPP, Unit 1.W/970616 Ltr ML18012A7821997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant.W/970514 Ltr ML18012A6181997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1.W/970415 Ltr ML18012A5821997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Shearon Harris Nuclear Power Plant.W/970312 Ltr PY-CEI-NRR-2150, Monthly Operating Rept for Feb 1997 for Pnpp1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pnpp ML18012A5141997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Shearon Harris Nuclear Power Plant.W/970214 Ltr ML18012A4651996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Shearon Harris Nuclear Power Plant.W/970110 Ltr ML18012A4431996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Shearon Harris Nuclear Power Plant.W/961211 Ltr ML18012A4291996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Shearon Harris Nuclear Power Plant.W/961113 Ltr ML18012A4001996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Shearon Harris Nuclear Power Plant.W/961014 Ltr ML18012A3601996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Shearon Harris Nuclear Power Plant.W/960911 Ltr ML18012A3321996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Shearon Harris Nuclear Power Plant.W/960812 Ltr ML18012A2951996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Shearon Harris Nuclear Power Plant Unit 1.W/960711 Ltr ML18012A2731996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Shearon Harris Nuclear Power Plant.W/960614 Ltr ML18012A2441996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Harris Nuclear Plant.W/960513 Ltr ML18012A2091996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Harris Nuclear Plant.W/960410 Ltr ML18012A1711996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Harris Nuclear Plant.W/960311 Ltr ML18012A1271996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Shearon Harris Nuclear Power Plant.W/960209 Ltr ML18011B0971995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for SHNPP.W/960110 Ltr ML18011B0821995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Shearon Harris Nuclear Power Plant.W/951213 Ltr ML18011B0491995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Shearon Harris Nuclear Power Plant.W/951109 Ltr ML18011B0261995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Harris Nuclear Plant.W/951012 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18017A9181999-10-0808 October 1999 LER 99-008-00:on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With 991008 Ltr ML18017A9151999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18017A8671999-09-10010 September 1999 LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr ML18016B0481999-08-0404 August 1999 LER 99-006-01:on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised ML18017A8361999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr ML18016B0151999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18016A9801999-06-0404 June 1999 LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr ML18016A9851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr ML18017A8981999-05-12012 May 1999 Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. ML18016A9581999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML18016A9111999-04-12012 April 1999 LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr ML18016A8971999-04-0808 April 1999 LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr ML18016A8941999-04-0505 April 1999 Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8661999-03-31031 March 1999 Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. ML18017A8931999-02-28028 February 1999 Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant. ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18016A8261999-02-22022 February 1999 LER 99-003-00:on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With 990222 Ltr ML18016A8531999-02-18018 February 1999 Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'. ML18016A8111999-02-12012 February 1999 LER 99-002-00:on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With 990212 Ltr ML18016A7971999-02-0505 February 1999 LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr ML18022B0631999-02-0404 February 1999 Rev 0 to Nuclear NDE Manual. with 28 Oversize Uncodable Drawings of Alternative Plan Scope & 4 Oversize Codable Drawings ML20202J1161999-02-0101 February 1999 SER Accepting Relief Requests Associated with Second 10-year Interval Inservice Testing Program ML18016A8041999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr ML18016A7941999-01-29029 January 1999 LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor ML18016A7801998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr ML18016A7671998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr ML18016A9731998-11-28028 November 1998 Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With 990527 Ltr ML18016A8351998-11-28028 November 1998 ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1. ML18016A7411998-11-25025 November 1998 Rev 1 to Shnpp Cycle 9 Colr. ML18016A7211998-11-17017 November 1998 LER 98-007-00:on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With 981117 Ltr ML18016A7071998-11-0303 November 1998 Rev 0 to Harris Unit 1 Cycle 9 Colr. ML18016A7201998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves ML18016A6201998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr ML18016A5971998-09-21021 September 1998 Rev 1 to Harris Unit 1 Cycle 8 Colr. ML18016A5881998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr ML18016A5071998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr ML18016A9431998-07-0707 July 1998 Rev 1 to QAP Manual. ML18016A4841998-07-0707 July 1998 LER 97-002-01:on 970207,determined That Cold Weather Conditions Resulted in Mfiv Being Potentially Inoperable During Period 970117-20.Caused by Inadequate Design of HVAC Sys.Implemented Mods to Steam Tunnel HVAC Sys ML18016A9371998-06-30030 June 1998 Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp. ML18016A4861998-06-30030 June 1998 Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr ML18016A4701998-06-30030 June 1998 LER 97-021-03:on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 ML18016A4491998-06-0808 June 1998 LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr ML18016A4521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr ML18016A7711998-05-26026 May 1998 Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'. 1999-09-30
[Table view] |
Text
,ACCELERATED DI+IBUTION DEMONST3$TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM '(RIDS)
ACCESSION NBR:8712170227 DOC.DATE: 87/11/30 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION HALE,M.W. Carolina Power & Light Co.
WATSON,R.A. Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Nov 1987.W/871215 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTRJ- ENCL~ SIZE: I l TITLE: Monthly Operating Report (per Tech Specs) '
"NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME PD2-1 LA BUCKLEY,B LTTR ENCL 1
1, 0 0
ID CODE/NAME PD2-1 PD LTTR ENCL 5 5 j A
INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 1 1 NRR/DOEA/EAB 1 1 RPB 1 1 NRR/PMAS/ILRB 1 1 REG FILE 01 1 1 RGN2 1 1 EXTERNAL: DOE NE32 FULNER 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 8
A TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19
DOCKET NOe: 050-400 UNIT! Harris Unit 1 DATE: November 1987 COMPLETED BY: Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at a 73.07 percent Availability Factor for the month of November with a 63.01 percent capacity factor. There was 1 continued scheduled shutdown, 1 manual scram, 1 auto-scram, and 4 load reductions.
Details are provided in the Unit Shutdowns and Power Reduction sheets'here are 157 fuel assemblies in the reactor and 0 spent fuel bundles in the Harris Unit 1 fuel pool.
8712l70227 871130 PDR *DOCK 05000400 DCD MEM/DATAREPa/Page 1/OS3
'c
'CPhL Co PLANT I El'<FORNANCE DATA AUSTEN r- AGE-
..auN .DATE <2re3z87 OPERATING DATA aEPQ~ F<PD36-088 RUH 'I IHE 33:23:59 HARRIS UNIT DOCKET Ho ~ 858-488 CONPI ETED BY NARK M. HALE OPERATING STATUS TELEr-HoNE UNIT NAHE: HARRIS UHI T I NOTE There are 157 Puel I
- 2. REPORTING PERIOD: NOVEMBER 87 I assemblies in the Reactor I
- 3. LICENSED THERHAL POWER (NMT): 2775 and 0 spent fuel bundles in
- 4. HAHEPLATE RATlNG (GROSS) NME): 955.3 the spent fuel pool. I 5* DESIGH ELECTRXCAL RATING (HET MME>:.. 900.0 I 6* KNAX DEPENDABLE CAPACITY (GRO.)B HME): 9 .0.8 I I
- 7. HAX DEPENDABLE CAPACITY (HET NME): 868.0 8* IF CHAHGEB OCCUR IH CAPAClTY RATINGS (ITENS 3 THOU 7) SINCE LAST REPORT, GIVE REASONS: N/A 9* POWER L.EVEL TG WHICH RESTRICTED IF AHY (NET HWE): None
$ 0. REASONS FOR RI=STRICTION IF AHY: N/A Tl-I I 8) YR TQ CUHUL HQNTH DATE ATIVE HOURS IN REPORTIHG PERloD 720.08 51 $ 3.00 5< <3.88 NUHBER OF HOURS REACTOR CRITICAL 536.87 3705.89 3705.89 f3. REACTOR RESERVE SHUTDOWN HRS .00 .00 F 08
- 34. HOURS GENERATOR QN LXHE 526.33 3579.60 3579.68 UNIT RESERVE SHUTDOWN HOURS- .00 .00 .80 3'6. GROBS) THERHAL EHERGY GEH. (NWH) 1288678.84 9332997.86 9132997.86
$ 7~ GROSS ELEC. EHERGY GEH. (HMH) 424384.88 2981323.88 2981823.88 38 ~ HET ELECT EHERGY CvEHERATED (HMH> 398149.88 2)737321.88 273732)1.88 l9* UNIT SI=RV ICE FACTOR 73.07 78.81 70 81 F
- 20. UNX~ AVAXI.ABILITYr-ACTOR 73.07 78.83 78.81 23
- uHXT CAP. FACTOR <usxHG HDC HET> 63.81 62.25 62.25 22 UNXT CAP. FACTQF< <UslHG DER HET) 68.21 59.48 59.48 23 uHXT FoRcED ouTAGE RATE 282 12.33 12.33 BI-IUTDOWHS SCHED. OVER NEXT 6 HOHTHS (TYPE, DATE, AHD DURATION OF EACH):
None
- 25. XF SHUTDOMN AT END QF RLPGRT PERIOD, ESTIHATED DATE OF START UP:
UNITS xH TEsT BTATUB <rRxoR To cove~'RCIAL opERATIQN>: FGFiECAB~ AcHxEvED INITIAI CRXTICAI XTY INITIAL. ELECTRICITY COHHERCIAL OPERAT ION K $ .16 9
)
q)
MEM/DATAREPa/Page 2/OS3
lg ii 4 "'f)
'CPhL'O PLANT PERFORMANCE'ATA SYSTEM PAGE
,~RUN'.DATE 12/03/87 EHDIX B AVERAGE DAILY )ER LEVEL RPD39-OOC RUN TIME < 3: 23: 58 HARRIS UNIT DOCKET NO. 050-480 COMPLETED BY MARK W. HALE TELEPHONE (919)362-2944 NOVEMBER DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL
'MWE-NET)
(MWE-HET) 20 7 878 190 I
+7 870 387 873 30 877 535 1.$ 6 8 MEM/DATAREPa/Page 3/OS3
UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 12/3/87 COMPLETED BY: M, W Kale TELEPHONE: (919) 362-2944 REPORT MONTH: NOVEMBER 1987 Tl R Method No. Date y Duration of Licensee System Component Cause d, Corrective P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report 4 Prevent Recurrence Reactor 87-042 871009 183,05 N/A ZZ ZZZZZZ Unit removed from service to perform scheduled Surveillance Tests and Inspections. The inspections included:
pipe snubbers, diesel generators, and production equipment Repairs were implemented to the Steam Generator Slowdown valves, Heater Drain pumps, Main Feed Pumps, Moisture Separator Reheaters, and other production equipment, F: Forced Reason: Method: Exhibit G-instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E&perator Training d License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I Same Source H-Other (Explain)
MEM/DATAREPa/Page 4/OS3
UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 12/3/87 COMPLETED BY: M. W, Hale TELEPHONE: (919) 362-2944 REPORT MONTH: NOVEMBER 1987 Method No. Date Duration of Licensee System Component Cause 8 Corrective (Hours) Shutting Event Code 4 Code 5 Action to Down Report ff Prevent Recurrence Reactor 87-043 871107 87&62 ZZ ZZZZZZ Automatic Reactor Scram from 4 'g power while in Mode 2 (Start-up), due to error in setting the steam dump cont-roller. As the ~A.~ MSIV was opened, a safety injection on low steam line pressure occurred'n addition to the auto-scram and safety injection, a main steam line isolation occurred'he operating procedures were revised to have the steam dump controller in manual and valves shut prior to opening MSIV's. After the MSIV's are open, then the controller will be placed in automatic.
F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E&perator Training II, License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)
<< Corrective action to prevent recurrence per the Licensee Event Report.
MEM/DATAREPa/Page 5/OS3
UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 12/3/87 COMPLETED BY: M, W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: NOVEMBER 1987 Method No. Date Duration of Licensee System Component Cause d Corrective >>
(Hours) Shutting Event Code 4 Code 5 Action to Down Report 4 Prevent Recurrence Reactor3 87-044 871108 10 82 87-063 ZZ ZZZZZZ Manual Reactor Trip from 22$ power initiated due to loss of normal feedwater caused by a condensate recirc. Valve being left in the open position instead of the modulating positions Procedure for Condensate System has been revised to ensure valve is in the proper operating positions F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File 0-Regulatory Restriction 4-Continued (NUREG-0161 )
E&perator Training d License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I Same Source H-Other (Explain) w Corrective action to prevent recurrence per the Licensee Event Report.
MEM/DATAREPa/Page 6/OS3
Vy
-I 4 '4 ~
UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 12/3/87 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: NOVEMBER 1987 Method Date Duration of Licensee System Component Cause 4 Corrective No.
(Hours) Shutting Event Code 4 Code 5 Action to Down Report f Prevent Recurrence Reactor 87-045 871111 N/A INSTRU Load reduced to 85% power due to the loss of heater drain pumps The pump trips were attributed to poor level control by the pneumatic controller, Poor level control caused high level in Feedwater Heaters. This caused the extraction steam valves to shut which caused the trips on Low NPSH, After heater levels stabilized on alternate control, ihe extraction steam valves were reopened which allowed the Low NPSH interlock to clear. The pumps were then restarted.
Reason: Method: Exhibit G-Instructions F: Forced A-Equipment Failure (Explain) 1-Manual for Preparation of Data S: Scheduled B&aintenance or Test 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File C-Refueling 4-Continued (NUREG-0161 )
D-Regulatory Restriction E-Operator Training 4 License Examination 5-Reduced Load F-Administrative 6-Other Exhibit 1 Same Source G-Operational Error (Explain)
H-Other (Explain)
MEM/DATAREPa/Page 7/OS3
UNIT SHUTDOWNS AND POWER REDUCTIONDOCKET NO,:050-400 UNIT NAME: Harris DATE: 12/3/87 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: NOVEMBER 1987 Method of Licensee System Component Cause Ii, Corrective No, Date Duration (Hours) Shutting Event Code 4 Code 5 Action to Down Report $ Prevent Recurrence Reactor 87-046 871III N/A MOTORX Load reduced to 50$ to inspect IB mainfeed pump motor bearings due to excess vibration. The bearings were relieved at the horizontal parting joints per vendor recommendations Unit returned to full service, Reason: Method: Exhibit G-Instructions F: Forced A-Equipment Failure (Explain) I-Manual for Preparation of Data S: Scheduled B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File C-Refueling 4-Continued (NUREG-0161)
D-Regulatory Restriction E-Operator Training 4 License Examination 5-Reduced Load F-Administrative 6-Other Exhibit I - Same Source G-Operational Error (Explain)
H-Other (Explain)
MEM/DATAREPa/Page 8/OS3
UNIT SHUTDOWNS ANO POWER REOUCT IONDOCKET NO,:050-400 UNIT NAME: Harr I s DATE: 12/3/87 COMPLETED BY: H, W Hale TELEPHONE: (919) 362-2944 REPORT MONTH: NOVEMBER 1987 Method No. Date Duration of Licensee System Component Cause 8, Corrective (Hours) Shutting Event Code 4 5
'ode Action to Down Report J Prevent Recurrence Reactor 87-047 871114 N/A INSTRU Load reduced to 89/ due to the loss of IA heater drain pump low net positive suction head The pump trip was attributed to 4A feedwater heater level pneumatic controller. The controller was adjusted to correct the levels Unit returned to full service.
F: Forced Reason: Hethod: Exhibit G-Instructions S: Scheduled A<quipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Hanual Scram Entry Sheets for Licensee C~fueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161 )
E-Operator Training II, License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)
MEH/OATAREPa/Page 9/OS3
i' UNIT SHUTDOWNS AND POWER REDUCTIONDOCKET NO,:050-400 UNIT NAME: Harris DATE: 12/3/87 COMPLETED BY: H. W, Hale TELEPHONE: (919) 362-2944 REPORT HONTH: NOVEMBER 1987 T Hethod of Licensee System Component Cause 8, Corrective No. Date y Duration (Hours ) Shutting Event Code 4 Code 5 Action to P
e Down Report 4 Prevent Recurrence Reactor N/A HECFUN Load reduced to 50$ to perform 1B 87-048 871 I 15 mainfeed pump/motor hot alignment.
The alignment was completed and unit was returned to full service.
Reason: Hethod- Exhibit G-Instructions F: Forced A-Equipment Fai lure (Explain) 1-Manual for Preparation of Data S: Scheduled B-Maintenance or Test 2-Hanual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File C-Refueling 4-Continued (NURE~161 )
D-Regulatory Restriction E-Operator Training II, License Examination 5-Reduced Load F-Administrative 6-Other Exhibit 1 Same Source G-Operational Error (Explain)
H-Other (Explain)
MEH/DATAREPa/Page 10/OS3
r
~ <<~ ~
Carolfna Power 8 Lfght Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North Carolina 27562 DEC 15 1987 File Number.'HF/10-15505 Letter Number: HO-875019 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NOo NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of November 1987.
Yours very truly, R. A. Watson Vice President Harris Nuclear Project MWH:gmw Enclosure cc'. Dr. J. Nelson Grace (NRC)
Messrs. J. M. Taylor (NRC)
G, F. Maxwell (NRC-SHNPP)
R. G. Oehl (DOE)
MEM/HO-875019/Page 1/OS3
0 iv