ML18016A265

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1997 for Shearon Harris Nuclear Power Plant.W/971216 Ltr
ML18016A265
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1997
From: Donahue J, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-97-219, NUDOCS 9712230389
Download: ML18016A265 (7)


Text

CATEGORY 1 1

,4 REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,S. Carolina Power E Light Co.

DONAHUE,J.W. Carolina Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION Monthly operating re for Shearon Harris ltr.997

SUBJECT:

Nuclear Power Pla .W/ 71216 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-1 PD 1 1 ROONEY,V 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I t

Carolina Power 8 Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 DEC 16 1997 United States Nuclear Regulatory Commission Serial: HNP-97-219 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power 8~, Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 1997 is provided.

Sincerely, J. W. Donahue Director of Site Operations Harris Plant MV Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. V. Rooney - NRC Project Manager r)ggQB~ IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII

-97i~Psog89 97Oi30 0 PDR ADQCK R

State Road 1134 New Hill NC

USNRC Document Contro esk HNP-97-219 / Page 2 bc: Mr. T. C. Bell Mr. B. H. Clark Mr. G. W. Davis Mr. W. J. Hindman Mr. W. D. Johnson Ms. W. C. Langston (PEARAS File)

Mr. R. D. Martin Mr. W. S. Orser Mr. W. R. Robinson Mr. R. F. Saunders Mr. W. G. Wendland (American Nuclear Insurers)

Nuclear Records Licensing File

4 4'

i

a Enclosure to Serial HNP-97-219 Sheet 1 of 2 CPCL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/04/97 OPERATING DATA REPORT RPD36-000 RUN TIME 09:42:59 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: NOVEMBER 97
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORTI G1VE REASONS:
9. POWER LEVEL TO WHXCH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTXON XF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTXNG PERIOD 720.00 8016.00 92785.00
12. NUMBER OF HOURS REACTOR CRITXCAL 720.00 6299.60 77565.71
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 720.00 6191.88 76749.54
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1994603.40 16892557.20 205776890.46
17. GROSS ELEC. ENERGY GEN (MWH) 672015.00 5619256.00 68486508.00
18. NET ELEC. ENERGY GENERATED (MWH) 631818.00 5247160.00 63871899.00
19. UNIT SERVICE FACTOR 100.00 77.24 82.72
20. UNXT AVAILABILITYFACTOR 100.00 77.24 82.72
21. UNIT CAP. FACTOR (USING MDC NET) 102.04 76.11 80.04
22. UNIT CAP. FACTOR (USXNG DER NET) 97.50 72.73 76.49
23. UNIT FORCED OUTAGE RATE .00 4.58 3.43 24 SHUTDOWNS SCHED OVER NEXT 6 MONTHS (TYPEI DATEi AND DURATION OF EACH)
25. XF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS XN TEST STATUS (PRIOR TO COMMERCIAL OPERATXON): FORECAST ACHIEVED INITIAL CRITICALXTY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9

Enclosure to Serial: HNP-97-219 Sheet 2 of2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/04/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 09:43:01 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 NOVEMBER 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 870 17 883 872 18 881 868 19 879 878 20 879 880 21 877 879 22 871 877 23 876 878 881 878 25 880 10 879 26 877 880 27 878 12 880 28 877 13 881 29 873 880 30 874 15 880 16 882