CATEGORY 1 REGULAT INFORMATION DISTRIBUTION "TEM (RIDS,)
-'k --.: >> >>>>
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERSIS.
Carolina Power
& Light Co.
CLARK,B.H.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000400 t for May 1997 for Shearon Harris SIZE:
NOTES:Application for permit renewal filed.
SUBJECT:
Monthl Unit
.W/970616 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR i ENCL TITLE: Monthly Operating Report (per Tech Specs) 05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS CENTER
~BB~PAB EXTERNAL: LITCO BRYCETJ H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME ROONEY,V AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1.
1 1
1 NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE'WASTE!
CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
1 0
P
~
I
Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 AN I t6 sy7 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 Serial: HNP-97-126 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING,REPORT
Dear Sir or Madam:
In accordance with Carolina Power &Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of May 1997 is provided.
. Sincerely, B. H. Clark Plant General Manager Harris Plant MV Enclosure c:
Mr. J. B. Brady
- NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. V. Rooney
- NRC Project Manager 9706240094 97053i PDR ADQCK;,,'05000400 R
PDR State Road 1134 New Hill NC
~-5
'I
Enclosure to Serial HNP-97-126 Sheet 1 of3 CPSL CO.
RUN DATE 06/03/97 RUN TXME 07:44:43 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1
RPD36-000 OPERATXNG STATUS DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 NOTES 1.
UNIT NAME:
HARRIS UNIT 1 2.
REPORTING PERZOD:
MAY 97 3.
LICENSED THERMAL POWER (MWT):
2775 4.
NAMEPLATE RATING (GROSS MWE):
950.9 5.
DESIGN ELECTRICAL RATING (NET MWE):
900.0 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 l
7.
MAX DEPENDABLE CAPACITY (NET MWE):
860.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHXCH RESTRICTED XF ANY (NET MWE):
10.
REASONS FOR RESTRICTION IF ANY:
THIS MONTH YR TO DATE CUMUL ATIVE 11:
HOURS IN REPORTING PERIOD 12.
NUMBER OF HOURS REACTOR CRITICAL 13.
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR ON LXNE 15.
UNIT RESERVE SHUTDOWN HOURS
, 16.
GROSS THERMAL ENERGY GEN.
(MWH) 17.
GROSS ELEC.
ENERGY GEN (MWH) 18.
NET ELEC.
ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABlLITYFACTOR 21.
UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS 744.00
.00
.00
.00
.00
.00
.00
-8467.00
.00
.00
-1.32
-1.26
.00 (TYPE,
- DATE, 3623.00 2223.79
.00 2210.13
.00 6099787.44 1
2050566.00 1911320.00 61.00 61.00 61.34 58.62 2.14 AND DURATION OF EACH):
88392.00 73489.90
.00 72767.79
.00 94984120.70 64917818.00 60536059.00 82.32 82.32 79.63 76.10 3.29 Unit remains shutdown for Refueling Outage 7.
- 25. IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP: June 7,
1997 26.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 1.16 9
~0 A
4 k
Enclosure to Serial: HNP-97-126 Sheet2of3 CP&L CO.
PLANT PERFORMANCE DATA SYSTEM RUN DATE 06/03/97 APPENDIX B AVERAGE DAILY POWER LEVEL RUN TIME 07:44:42 HARRIS UNIT 1 PAGE 1
RPD39-000 1997 DAY AVG. DAILY POWER LEVEL (MWE-NET)
DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG. DAILY POWER LEVEL (MWE"NET) 10 12 13 15
-10
-10
-10
-10
-12 17 18 19 20 21 22 23 25 26 27 28 29 30 31
-12
-12
-10
-10
-10 "15
-15
-13
-26
Enclosure to Serial: HNP-97-126.
'heet 3of3 is'NIT NAME:
Harris DATE:
03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE:
(919) 362-2573 REPORT MONTH UNITSl IUTDO'tVNSAND POPOVER REDUCTION NUMBER DATE TYPE I
DURATION (HOURS)
REASON 2
METHODOF SHUTTING DOWN REACTOR 3
LICENSEE EVENT REPORT g SYSTEM CODE 4 COMPONENT CODES CAUSE AND CORRECTIVE ACTIONTO PREVENT RECURRENCE 97404 970501 744.0 N/A Plant remains oNine for Refueling Outage 7.
I F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8: License Examination F-Administrative G4)perational Error (Explain)
Hither (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation ofData Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source