ML18022A676

From kanterella
Revision as of 03:39, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Proprietary NEDE-22148-P-A, Extended Burnup Evaluation Mehthodology, Dtd Nov 1985 & Author 841227 Ltr to Co Thomas,Nrc,Containing Addl Info Re Extended Burnup Fuel Operation.Documents Forwarded Per Util Request
ML18022A676
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/21/1988
From: Charnley J
GENERAL ELECTRIC CO.
To: Buckley B
NRC
References
JSC-64-88, MFN-59-88, NUDOCS 8808020045
Download: ML18022A676 (2)


Text

AC.CELERATED DISI"RIBUTION SYFI'EM DEMONSTRATION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8808020045 DOC.DATE: 88/07/21 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CHARNLEY,J.S. General Electric Co. .i)

RECIP.NAME RECIPIENT AFFILIATION BUCKLEY,B. NRC No Detailed Affiliation Given R SUMECT: Forwards listed documents re extended burnup fuel evaluation,per Z Martin request.

DISTRIBUTION CODE: AP01D COPIES RECEIVED:LTR g ENCL g SIZE: 1+ S'0 D TITLE: Proprietary Review Distribution Operating Reactor NOTES:Applicati'on for permit, renewal filed.;: 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/N~ LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA BUCKLEY,B gg PP' 1 1 3

PD2-1 PD P'I// 1 1 INTERNAL: ACRS Q/0 QP~ ~ ~6 D AEOD/DSP/TPAB OGC 15-B-18 ~ 1 1

6 1

0 AEOD/DOA NUDOCS FILE BSTRACI Pp jP' ~1 Ji EXTERNAL: LPDR 1 0 NRC PDR 1 D'.

TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 15

GE Nuclear Energy General Electnc Company 175 Curtner Avenue, San Jose, CA 95125 HC .687) PH. (408) 925-3697 July 21, 1988 go- Aoo MFN-59-88 SS08020045 gg072f JSC-64-88 PDR ADOCK 05000400 P PDC U.S. Nuclear Regulatory Commission 1 White Flint Building, Room 14B20 11555 Rockville Pike Rockvil1 e, HD 20852 Attention: Bart Buckley Harris Project Manager

Dear Mr. Buckley:

SUBJECT:

EXTENDED BURNUP FUEL EVALUATION

REFERENCES:

1) Letter, J.S. Charnley (GE) to C.O. Thomas (NRC),

"Response to NRC Request for Additional Information on Extended Burnup Fuel Operation," December 27, 1984.

2) GE Licensing Topical Report, NEDE-22148-P-A, "Extended Burnup Evaluation Methodology," dated November 1985.

The referenced documents are being sent to you at the request of Hr. Jack Hartin of Carolina Power and Light (CP&L) to assist in resolving NRC actions i ving CP&L's Shearon Harris reload submittal.

.S. Charnley Fuel Licensing Manager Enclosure(s) cc: Jack Hartin (CPEL)