Category:CORRESPONDENCE-LETTERS
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML20203G5821999-02-17017 February 1999 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Released in Entirety. Documents Listed in App D Being Withheld in Part (Ref FOIA Exemption 5) ML20202F4761999-01-29029 January 1999 First Partial Response to FOIA Request for Documents.Records in App a Encl & Being Released in Entirety.App B Records Being Withheld in Part (Ref FOIA Exemption 7C) ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML20195J9101998-11-18018 November 1998 Forwards Notice of Withdrawal of Application for Amends to Facility Operating Licenses (Notice).Notice Has Been Filed with Ofc of Fr.Amends Would Have Revised TS to Eliminate HPCI Pump auto-transfer on High Suppression Pool Level ML20155F7201998-11-0303 November 1998 Final Response to FOIA Request for Documents.Documents Listed in App B Being Encl & Being Released in Entirety. Documents Listed in App C Being Withheld in Part (Ref Exemption 7C) ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML20151W4951998-09-10010 September 1998 Informs That as Part of NRC Probabilistic Risk Assessment Implementation Plan,Commission Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Has Been Assigned SRAs for Region I IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML20202F5501998-07-17017 July 1998 Responds to PP&L Corp Auditing Repts 739459-97,739459-1-97 & 739459-2-98 Re SSES Investigations Into Missed Alarm Tests ML20236P9451998-07-15015 July 1998 Forwards Emergency Response Data Sys Implementation Documents Including Data Point Library Updates for Oconee (Number 255),Dresden (Number 257) & Susquehanna (Number 258) ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML20202H1331998-04-16016 April 1998 Partially Deleted Ltr Re Concerns Raised to NRC Concerning PP&L Susquehanna Facility NUREG-0619, Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable1998-04-15015 April 1998 Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable ML20216B6811998-04-0101 April 1998 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Being Released in Entirety ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20203M5071998-02-26026 February 1998 Final Response to FOIA Request for Documents.Records in App a Being Placed in PDR & Encl.Records in App B Partially Withheld (Ref FOIA Exemption 6) ML20203B5931998-02-23023 February 1998 Ack Receipt of & Wire in Amount of $55,000 in Payment for Civil Penatly Proposed by NRC Ltr . Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20216B7031998-02-22022 February 1998 Partially Deleted Ltr Requesting Copy of OI Rept on Plant, Unit 2,case 1-96-039 PLA-4851, Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing1998-02-18018 February 1998 Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing ML20203M5791998-02-10010 February 1998 Enters Appeal Due to Lack of Response to FOIA Request 97-473 ML18030A0971998-02-0202 February 1998 Forwards Proprietary Response to RAI Re Proposed License Amend 209 to TS Supporting Cycle 11 Reload.Proprietary Info Withheld,Per 10CFR2.790 ML20203G6071998-01-26026 January 1998 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Interim Rept 739459-97,dtd 971015 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept IR 05000387/19970031998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18030A4071998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18017A2931998-01-0606 January 1998 Provides Responses to Improved TS Section 3.8 Per 970324 NRC Rai.Schedule 980628 for Improved TS Implementation. Submittal of Revised Specifications Is Planned for Jan 1998 PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny1997-12-29029 December 1997 Expresses Appreciation for Support Received by Former Project Manager C Poslusny IR 05000387/19970041997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued As Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML18026A4901997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued as Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML20203M5741997-12-0505 December 1997 FOIA Request for Copy of Latest OI Rept on Susquehanna Ses Including All Exhibits & for Any Other Communication Between NRC & Susquehanna Ses/Pp&L PLA-4818, Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept1997-12-0404 December 1997 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML18026A3941990-09-0101 September 1990 Requests Waiver of Compliance from Tech Spec 3.8.1.1 to Evaluate Increase in Action from 72 H to 15 Days Re Ac Sources Based on 900829 Borescopic Insp of Emergency Diesel Generator ML17157A2741990-08-0808 August 1990 Forwards Topical Rept PL-NF-90-001, Application of Reactor Analysis Methods for BWR Design & Analysis. IR 05000387/19900801990-08-0303 August 1990 Responds to Violations Noted in Insp Repts 50-387/90-80 & 50-388/90-80.Corrective Actions:Util Conducted Operator Training on How to Implement Eops If Suppression Chamber Pressure Not Available ML18030A0741990-08-0303 August 1990 Responds to Violations Noted in Insp Repts 50-387/90-80 & 50-388/90-80.Corrective Actions:Util Conducted Operator Training on How to Implement EOPs If Suppression Chamber Pressure Not Available ML18026A2351990-07-0202 July 1990 Forwards Application for Proposed Amend 132 to License NPF-14,revising Tech Spec to Support Cycle 6 Reload ML18030A0721990-06-19019 June 1990 Forwards Rev 1 to SEA-EE-183, Evaluation of Unit 1 Computer Class 1E - Non-Class 1E Interfaces & Rev 1 to SEA-EE-184, Evaluation of Unit 1 Annunciator Class 1E - Non-Class 1E Interfaces. ML18026A3931990-06-0707 June 1990 Requests NRC Approval to Install Mod at Plant Determined to Constitute Unreviewed Safety Question When Evaluated.Util Will Implement Administrative Controls to Ensure Larger Min Vol Met for Diesel E Prior to Tech Spec Change ML18030A3671990-05-14014 May 1990 Forwards Proprietary Conclusions of Investigation Re Two False Negative Analytical Results from Two Blind Spike Urine Samples.Investigation Satisfactorily Evaluated Samples. Encl Withheld (Ref 10CFR2.790) ML20043A2461990-05-11011 May 1990 Forwards Draft of Proposed Decommissioning Financial Assurance Plan,Per 10CFR50.33 & 50.75,for Review.Telcon Scheduled for 900515 to Discuss Comments ML18030A0711990-03-19019 March 1990 Responds to Questions Delineated in 900131 Ltr Re Diesel Generator Events That Occurred During Sept & Oct 1989.Draft Procedures for Proposed Intake Air Temp Test Program Transmitted to NRC on 900205.Revised Procedures Encl ML18017A1871990-02-15015 February 1990 Forwards Books 1 & 2 to, Unit 2 Third Refueling & Insp Outage;Outage Summary Rept. IR 05000387/19890331990-02-0505 February 1990 Responds to NRC 900105 Ltr Re Violations Noted in Insp Repts 50-387/89-33 & 50-388/89-31.Corrective Actions:Rhr Svc Water Pump 2P506B Remains in Inoperable Status Until Cause of Deviation Determined & Condition Corrected ML18030A0701990-02-0505 February 1990 Responds to NRC 900105 Ltr Re Violations Noted in Insp Repts 50-387/89-33 & 50-388/89-31.Corrective Actions:Rhr Svc Water Pump 2P506B Remains in Inoperable Status Until Cause of Deviation Determined & Condition Corrected ML18040A9601990-02-0202 February 1990 Forwards Schedules That Provide Details of Tasks Required to Complete Activities Re Diesel Generators & Advises of Plan to Have Spare Parts on Site in Timely Manner to Support Each Diesel Insp ML20006B4501990-01-25025 January 1990 Forwards Preliminary Scope & Schedule for Security Upgrade Project.Encl Withheld (Ref 10CFR73.21) ML17156B6031990-01-25025 January 1990 Forwards NPDES Discharge Monitoring Rept for Dec 1989 & State of Pa,Dept of Environ Resources Monthly Facility Rept Form (01-112).Noncompliances for Zinc on Cooling Tower Blowdown on 891228 & for Missed Sample Noted ML18040B2671990-01-0505 January 1990 Forwards Rev 0 to SEA-CW-037, Analysis of B & C 1989 Diesels Failure. Rept Details Util Analysis of Overpressurization Incidents Which Occurred in Sept & Oct 1989 of Diesel Generators ML18040B2651989-11-27027 November 1989 Forwards Response to Generic Ltr 89-21.Table of USIs for Which Technical Resolution Has Been Achieved Encl ML19325F1991989-11-0909 November 1989 Responds to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Util Has Developed & Issued Procedure Which Includes Safeguards Contingency Planning Using Approach Noted in Generic Ltr ML19325D7411989-10-19019 October 1989 Forwards Application for Amends 126 & 77 to Licenses NPF-14 & NPF-22,respectively,requesting Emergency Temporary Relief from Certain Requirements of Tech Specs 3.2.2 on One Time Basis for Period of 3 Months ML19325C3771989-10-11011 October 1989 Forwards Change DD to Physical Security Plan.Change Withheld (Ref 10CFR73.21) ML18040B2581989-10-0202 October 1989 Forwards Final Response to Request for Addl Info Re Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Listed Items Included in Previous & Current Ref Responses ML18040A9441989-09-12012 September 1989 Responds to Remaining Questions Raised During NRC Insp of Training Programs.Training Procedure Re Technical Exam Bank Instrumentation & Control Training Exams.Health Physics Technicians Trained Re High Radiation Levels PLA-3251, Forwards Response to Regulatory Effectiveness Review Rept. Util Established Team to Evaluate Appropriate Scope for Planned Major Project to Upgrade Security.Scope of Project to Be Finalized & Approved in Nov 1989.Response Withheld1989-08-31031 August 1989 Forwards Response to Regulatory Effectiveness Review Rept. Util Established Team to Evaluate Appropriate Scope for Planned Major Project to Upgrade Security.Scope of Project to Be Finalized & Approved in Nov 1989.Response Withheld ML18040A9421989-08-22022 August 1989 Requests Concurrence W/Scheduling of 1990 Annual NRC Observed Emergency Preparedness Exercise at Plant on 900502. Concurrence Requested by 890930 ML18040B2531989-08-10010 August 1989 Discusses Insp of Operational Status of Emergency Preparedness Program.Susquehanna Review Committee 1987 & 1988 Emergency Plan Audits Encl W/Other Supporting Documentation ML20246A0191989-06-30030 June 1989 Submits Comments on Containment Performance Improvement Program (Cpi).Believes Program Will Be Generic Approach to Improving Containment Performance During Severe Accident PLA-3218, Submits Info Re Settlement Agreements for Discrimination Matters Arising Under Energy Reorganization Act of 1974. No Settlements Made Between Licensee & Any Employees in Section 210 Proceedings1989-06-27027 June 1989 Submits Info Re Settlement Agreements for Discrimination Matters Arising Under Energy Reorganization Act of 1974. No Settlements Made Between Licensee & Any Employees in Section 210 Proceedings ML18040B2501989-06-20020 June 1989 Forwards Summary Rept of Safety Evaluations Approved During 1988.Changes Include Backseating Control Box to Electrically Backset HV-202168 to Reduce Steam Leakage & Rerouting Condensate Supply Line to Main Condenser Keepfill PLA-3194, Forwards Change CC to Physical Security Plan.Change Withheld (Ref 10CFR73.21)1989-05-30030 May 1989 Forwards Change CC to Physical Security Plan.Change Withheld (Ref 10CFR73.21) ML18040A9301989-04-28028 April 1989 Responds to 890322 Request for Addl Info Re Plant Fire Protection Review Rept.Analysis of Circuits Having Potential for Being Impacted by Fire Resulting in Multiple High Impedence Faults Will Be Completed by Last Quarter 1989 ML18040B2441989-04-14014 April 1989 Forwards Application for Amends to Licenses NPF-14 & NPF-22, Resulting from Mods Performed to Essential Svc Water Sys,Per 10CFR50,App R,Consisting of Proposed Amends 23 & 70 PLA-3173, Forwards Change Bb to Physical Security Plan.Encl Withheld (Ref 10CFR73.21)1989-03-22022 March 1989 Forwards Change Bb to Physical Security Plan.Encl Withheld (Ref 10CFR73.21) ML18040A9271989-03-10010 March 1989 Forwards Rev 6 to ISI-T-100.0 for Unit 1 & Rev 3 to ISI-T-200.0 for Unit 2 Pump & Valve Inservice Insp Testing Program. ML18040A9261989-03-0707 March 1989 Discusses Util Position Re Completion & Implementation of NRC Requested Actions Specified in Suppl 1 to NRC Bulletin 88-007, Power Oscillations in Bwrs. ML17156B0131989-02-0202 February 1989 Forwards Proprietary Rept & Affidavit Supporting Proposed Amend 119 to License NPF-14 ML17156A9771988-12-15015 December 1988 Forwards Rev 11 to Susquehanna Units 1 & 2 Emergency Plan ML18040B2331988-11-22022 November 1988 Forwards Listed Addl Info Re Plant Fire Protection Review rept.W/16 Oversize Drawings ML17156A9211988-11-0909 November 1988 Forwards Proprietary GE Rept, Tech Spec Improvement Analysis for Reactor Protection Sys for Susquehanna Steam Electric Station,Units 1 & 2. Rept Withheld (Ref 10CFR2.790) ML18040A9111988-09-15015 September 1988 Informs That Mods Re Fire Barrier Upgrades,Hvac Fan Switches,Ct Secondaries & Raceway Wrapping Completed Except as Listed ML18040A9101988-08-10010 August 1988 Forwards Application for Amend to License NPF-14,extending Operation During Cycle 4 W/One Circulation Loop Out of Svc. Fee Paid ML18040B2221988-08-10010 August 1988 Responds to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Staff Position on Matls, Water Chemistry,Crack Evaluation & Repair Criteria & Insp Schedules Among Topics Addressed.Flaw Evaluations Encl ML18040B2201988-07-27027 July 1988 Forwards Comments to Each Specific SALP Category,Per 880707 Meeting W/Nrc.Presentations from Meeting Also Encl ML18040A9061988-07-21021 July 1988 Forwards GE Rept, Susquehanna Unit 1 CRD Housing Cap Screw Corrosion. Rept Completes Action on Item ML18040A9031988-07-19019 July 1988 Forwards Approved Version of Topical Rept PL-NF-87-001-A, Qualification of Steady State Core Physics Methods for BWR Design & Analysis, Per 880428 Ltr ML18040A9041988-07-19019 July 1988 Forwards Rev 39 to Updated FSAR for Susquehanna Steam Electric Station Units 1 & 2 Per 10CFR50.71 ML18040B2131988-06-24024 June 1988 Forwards 1987 Annual Rept for Allegheny Electric Cooperative,Inc ML18040A9021988-06-15015 June 1988 Provides Revised Response to NRC 871130 Ltr Re Violations Noted in Insp Repts 50-387/87-19 & 50-388/87-19.Corrective Actions:Incumbent Will Be Removed from Emergency Plan Position of Radiation Protection Coordinator PLA-3028, Responds to Suppl 1 to Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Revs to Design Review for Original Bulletin Required as Result of Suppl1988-05-31031 May 1988 Responds to Suppl 1 to Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Revs to Design Review for Original Bulletin Required as Result of Suppl ML18040A8691988-04-0606 April 1988 Forwards Application for Proposed Amends 110 & 61 to Licenses NPF-14 & NPF-22,respectively,revising Tech Specs Re Radiation Monitoring Instrumentation.Fee Paid 1990-09-01
[Table view] |
Text
REGULATORY. FORMATION DISTRIBUTION SY M (RIDS)
ACCESSION NBR;8512230165 DOC ~ DATE+ 85/12/18 NOTARIZED: NO DOCKET FACIL:50 387 Susquehanna. Steam Electric Stations Unit 1-, Pennsylva 05000387 50-388 Susquehanna Steam Electric Stationp Unit 2'g Pennsylva 05000388 AUTH ~ NAME . AUTHOR AFFILIATION KEISERrH.WE Pennsy)vania Power L Light Co, RECIP,NAME RECIPIENT AFFILIATION ADENSAMgE, BWR Project Directorate 3 sc ~p+
SUBJECT:
Forwards response to NRCconcerns re,plant fire protection program~including criteria for fire'rotection of sys within fire zone not complying w/requirements safe'hutdown; of Section III,G analysis of associated circuits.
8 DISTRIBUTION CODE: A002D COPIESRECEIVED:LTR g'NCL f.'IZE;: I > ~ 17%
TITLE: OR Submi t tal: Inadequate Core Cooling (Item II ~ F.2) GL 8?<<28 NOTES: 1cy NMSS/FCAF/PM. LPDR 2cys Transcripts. 05000387 QL:
NMSS/FCAF/PM'PDR 2cys Transcripts",
07/17/82'cy 05000388 OLe03/23/84 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL BWR PD3 PD 1 1 BWR PD3 LA 1 1 CAMPAGNONE 2 2 INTERNAL; ACRS'RR 17 10 10 ADM/LFMB 1 0 BWR D IR 1 1 NRR BWR PD1 1 NRR PWR A DIR 1 1 NRR PWR B DIR 1 NRR SHEA,J 01 2 2 NRR/DHFT DIR 1 1 ~
NRR O DIR 1 1 NRR/ORAS 08 1 1 OQ 1 1 RGN1 07 1 1 EXTERNAL: 24X 1 1 LPDR 03 2 2 NRC PDR 02- 1 1 NSIC 06 1 1 NOTES: 3 3 TOTALS NUMBER OF COPIES REQUIRED: LTTR 30 'NCL 33
Pennsylvania Power 8 Light Company Two North Ninth Street ~ Allentown, PA 18101 ~ 215 / 770.5151 Harold W. Keiser Vice President-Nuclear Operations 21 5/770-7502 DEC 18 1985 Director of Nuclear Reactor Regulation Attention: Ms. E. Adensam, Project Director BWR Project Directorate No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION RESOLUTION OF FIRE PROTECTION PROGRAM CONCERNS ER 100450 FILE 841-2,143 Docket No. 50-387 PLA-2566 50-388
Dear Ms. Adensam:
This letter is provided in response 'to the NRC staff's concerns regarding the Fire Protection Program at Susquehanna SES. Specifically, it addresses the concerns regarding the criteria for fire protection of safe shutdown systems within a fire zone which does not comply with the requirements of Section III G and analysis of associated circuits within fire zones outside the control room. Summary reports addressing each of these concerns are attached.
PP&L has initiated the development of a computerized Appendix R safe shutdown analysis program. We will compare the results from this program with the work which we have completed to date. This program, in addition to giving us a firm and auditable analysis by shutdown path, would also enhance our ability to maintain our Appendix R commitments and allow us to expeditiously evaluate the effects of plant changes with respect to these commitments.
We do not anticipate significant changes in the information previously submitted to you. We expect this comparison to be completed by the Fourth Quarter 1986 or the First Quarter 1987. If any plant modifications should be identified in this comparison process, we will discuss their implementation schedule with you. We will maintain our previously committed schedule for completing the already identified plant modifications.
Very truly yours, H. W. Keiser Vice President-Nuclear Operations cc: M. J. Campagnone NRC R. H. Jacobs NRC
SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 & 2 FIRE PROTECTION PROGRAM APPENDIX R SUGARY REPORT FOR CONCERN $/2' CRITERIA FOR FIRE PROTECTION OF SAFE SHUTDOWN SYSTEMS WITHIN A FIRE ZONE WHICH DO NOT COMPLY WITH THE REQUIREMENTS,OF SECTION, III.G DOCKET NOS. 50-387 50-388 851223016 )
g g g p ~ ~
gg \
r 3,
~
g pg g g gag
~ g g t'g gg g g ' ~
g
SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 & 2 FIRE PROTECTION PROGRAM CONCERN 82 DOCKET NOS. 50-387 50-388
SUMMARY
REPORT INDEX PAGE SECTION
1.0 INTRODUCTION
........................................ 1 SECTION 2.0 METHODOLOGY UTILIZED ................................ 1 SECTION 3.0 ASSUMPTIONS & NRC GUIDANCE .......................... 2 SECTION 4.0 LISTING OF DEVIATIONS ............................... 2 SECTION 5.0 RESULTS ............................................. 3 SECTION 6.0 IDENTIFICATION OF MODIFICATIONS ..................... 5 SECTION 7.0 SCHEDULE ............................................ 5 SECTION 8.0 COMPENSATORY MEASURES ............................... 6 SECTION
9.0 CONCLUSION
.......................................... 6 APPENDIX A DEVIATION REQUESTS APPENDIX B TABLE: FIRE AREAS VS DEVIATION REQUESTS
4 I I 4 4 e e e ~ 4
~ 4 ~ 4 ~ e 4 I ~ ~
~ 4 n 4 ~, ~ 4 I ~ ~
SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 & 2 FIRE PROTECTION PROGRAM DOCKET NOS. 50-387 50-388
SUMMARY
REPORT CONCERN 82: CRITERIA FOR FIRE PROTECTION OF SAFE SHUTDOWN SYSTEMS WITHIN A FIRE ZONE WHICH DO NOT COMPLY WITH THE RE UIREMENTS OF SECTION III.G (Deviation Request Response)
1.0 INTRODUCTION
As a result of audits performed in the first quarter of 1985 on the Fire Protection Program at Susquehanna Steam Electric Station (SSES), the NRC, in a letter dated April 18, 1985, issued a statement of their concerns related to the SSES Fire Protection Program. Subsequently, PP&L issued a letter numbered PLA-2482 dated June 11, 1985, which described each of the NRC concerns and delineated the description of the concern, a description of PP&L's method of resolution of the NRC concern and a description of PP&L's deliverables to the NRC. All of these items were discussed with and agreed to by the NRC staff.
The intent of this report is to provide a resolution to Concern 82, Criteria for Fire Protection of Safe Shutdown Systems Within a Fire Zone Which Do Not Comply With the Requirements of Section III.G, by identifying all applicable deviation requests. Justification is provided to show that a commensurate level of protection has been provided to assure safety is achieved and deviations from 10 CFR 50, Appendix R, Section III.G are acceptable.
- 2. 0 METHODOLOGY UTILIZED PP&L, has reviewed each Fire Area identified in the Fire Barrier Analysis and applied the methodology as described below:
a) Each specific requirement of 10 CFR 50, Appendix R, Section III.G was identified.
b) Specific guidance and information from Generic Letters 83-33, and 85-01 and Information Notice 84-09 was listed with the appropriate Appendix R requirement.
c) Fire protection features for each fire area which contain essential safe shutdown raceways, were compared to each Appendix R requirement and related guidance in order to determine compliance.
I I'
4 r
d) When a Fire Area was found to be in compliance, the methods of compliance were documented.
e) Deviations from requirements were identified and data to describe the Fire Area and support the justification for the deviation was collected.
f) Deviations requests were written.
OR g) Additional analysis was performed or corrective action was identified as an alternative to preparing deviation requests.
3.0 ASSUMPTIONS AND NRC GUIDANCE 3.1 This response was based on the following NRC documents.
a) 10 CFR 50, Appendix R, Section III.G b) NRC Generic Letter 83-33 c) IE Information Notice 84-09 d) NRC Generic Letter 85-01 3.2 The following assumptions were used in formulating this response.
3.2.1 Fire Areas as identified in PPGL response to Concern f/1 Unrated Fire Barrier Analysis (PLA-2529, September 4, 1985) are acceptable. Changes to those fire areas may change these exemption requests.
3.2.2 It was assumed that the requirement for fire suppression in 10 CFR 50, Appendix R III.G.3 applies to both III.G.3a and III.G.3b.
3.2.3 It was assumed deviations from NFPA codes which concern the detection system monitoring functions and control room response do not require a deviation request. These deviations have already been identified in Section 3.2, Item 95 of the Fire Protection Review Report Revision 1 and 2.
3.2.4 It was assumed that all existing fire rated barriers (1.5, 2, and 3 hrs.) which were approved by NRC in SER Rev. 0 are acceptable as fire area boundaries.
4.0 LISTING OF DEVIATIONS 4.1 Previous deviation request numbers 1 through 7 were submitted on September 4, 1985 (PLA-2529) as PP&L's response to NRC Concern //1 and 4b.
5
~ k
'II
,
I r L'
w l '4, W, ~
~
'
'p
'1 f
4.2 The NRC has previously approved two exemption requests. We have assigned the request for "One-Hour Wrap Without Sprinklers for Fire Zones 1-2D, 0-2B and 0-28H", dated February 9, 1982, (PLA-1013), as Request 88. The request. for "Spacing Closer than 20 feet Without a 1-Hour Wrap for Equipment in Fire Zone 2-5A" dated December 13, 1983 (PLA-1985) as Request 89. These were approved by the NRC in SER Supplements 734 and /36, respectively.
H 4.3 Request /310 concerns a future plant modification related to the fifth diesel generator installation which will be transmitted separate from this response.
4.4 Appendix A to this 'report contains the remainder of PP&L's deviation requests.
5.0 RESULTS 5.1 As described in Section 4.0, Deviation Requests 11-23 contained in Appendix A to this report and previous requests 1 through 9, comprise PP&L's response to NRC Concern //2, Criteria For Fire Protection of Safe Shutdown Systems Within a Fire Zone Which Do Not Comply With the Requirements of Section III.G.
5.2 The following conditions were identified through our analysis. The specific actions to bring each condition into compliance are given below:
A) Condition:
Fire Zones 0-26M and 0-26R contained essential safe shutdown raceway. The raceway separation satisfy the requirements of Regulatory Guide 1.75. The physical arrangement of the cable chases precluded transient combustibles. Fixed C02 fire suppression was provided. This configuration was previously
. used as a justification for not protecting the essential safe shutdown raceways with a one hour fire rated barrier.
Action:
These zones are now part of Fire Area CS-9 (Control Room) which uses alternate shutdown paths. Fire Zone 0-26M and 0-26R were reanalyzed to assure that cables in these zones did not prevent safe shutdown using Alternate Shutdown Paths as analyzed for the Control Room Analysis. As a result of this analysis supporting Concern No. 4b a deviation request is not required.
The following raceway in fire zone 0-26R will be wrapped with a 1-hour barrier:
B2K006
h g
h y
tf l
cf
B) Condition:
Fire Zones 2-5A, 1-3A and 1-4A contained some raceways not wrapped from "wall to wall" and these raceways are not encompassed by Deviation Request t/13.
Action:
The raceways in Fire Zone 2-5A were reanalyzed and protection is not required for the following raceways:
E2PK43 F2P375 E2PK44 F2P773 E2P373 F2P774 F2P803 The following raceways which are not completely wrapped with a fire rated barrier between fire zone boundaries will be provided with a fire rated wrap from wall to wall:
1-3A
'
Hour required because there are no sprinklers.
F1M434 1W300 F1KL12 13 14 15 FlKH12 13 14 15 1-4A F1K017 C) Condition:
Fire Zones 1-5B and 2-5B contained both Division I and Division II Core Spray Valves and Cable. These fire zones contained low combustible loading and a 6-foot separation was considered justified.
Action:
Since this condition and its justification does not support the conclusions drawn for these fire zones in the Fire Barrier Analysis, we have decided not to submit a deviation request.
These zones have been reanalyzed to demonstrate other safe shutdown paths are available. This will result in a change to the descriptions of Fire Zone 1-5B (RCIC path to be added) and 2-5B (HPCI Path to be added) in the Fire Barrier Analysis Report.
4 VV~
4 4 f f
~ I II I f, I 4 '
I Vf I I 4 4 II 4 Vf
\ V' M ~
I Y V I I 4 f ~ I II 4 4 4
'
I 8 1 rl ~
f' 4 1 yy f ~
The following additional raceway will be wrapped to assure the availability of the HPCI Path for Zone 2-5B and the RCIC Path for Fire Zone 1-5B. '
Zone 1-5B JB1253 E1K053 E1K489 Zone 2-5B E2KK24 E2KK25 E2KK26 E2KK27 E2K1C8 D2P006 D) Condition:
Fire Area CS-7 contains a minority essential raceway. The low combustible loading, separation of raceways in accordance with Regulatory Guide 1.75, limited space for transient combustibles, and fixed CO fire suppression was the previous justification for not providing a 1-hour fire rated barrier.
The loss of the minority raceway would result in the loss of the Division I Switchgear Cooling Fan control circuit.
Action:
This fan can be started remotely using the interim procedures provided as a result of Control Room Fire Analysis which was our response to NRC Concern 84b. Therefore, a deviation request will not be submitted, and the permanent modification for the fan circuits as outlined in the Control Room Analysis Concern i4b will be'mplemented to also correct this problem.
6.0 MODIFICATIONS The only modifications identified are the raceways which require additional wrapping and were identified in Section 5.2.
7.0 SCHEDULE Any modifications committed to in this report will be accomplished in accordance with the schedule provided below. The commitment date is tied to the end of outage referenced. Actual dates provided are for outage time frame reference only. This is the same schedule identified in our response to NRC Concerns 1 and 4b (PLA-2529, 9/4/85).
u e w t
I'
UNIT COMPLETED BY REFERENCE DATE Modification in End of Unit //1 October 23, 1987 Unit Pl & Common 3rd Refueling Outage Modification in End of Unit f/2 April 29, 1988 Unit 82 2nd Refueling Outage 8.0 COMPENSATORY MEASURES Compensatory measures currently in place will remain in place until all identified modifications are completed.
9.0 CONCLUSION
Upon completion of the identified modifications and with the acceptance of all deviation requests identified herein, the NRC's concerns related to Concern F2, Criteria For Fire Protection 'of Safe Shutdown Systems Within A Fire Zone Which Do Not Comply With the Requirements of Section III.G, will be resolved.
dk/g 075a: krp
I I
~ ~ 'l i
)
I gg I 8 ~
I' f' N ('
~ I ( I (I
~4 g I, I(
(
'I g $) ~ ~"" V I II o.P
SUSQUERQHHR'S~ ELECTRZC STATZCH UNZTS 1 & 2 PZRE PROTECT+ Paar+ - CONCERN S2 DOCKETS NO i 50-387 50-388 APPENDXX A DEVXATZON REQUESTS
DEVIATION REQUEST NO. 11 PAGE NO. 1 APPENDIX R DEVIATION RE UEST HVAC PENETRATIONS REACTOR BUILDING FIRE WALLS DEVIATION RE VEST:
We request approval of the following:
Fire rated walls between fire areas which have a combustible load (in-situ and transient) on both sides of the wall of one hour or less are acceptable as Fire Area Boundaries without fire dampers installed in the horizontal ventilation ducts that penetrate the walls.
FIRE AREAS AFFECTED:
This deviation applies to any fire wall where the fire loading [in-situ and transient] on each side of the wall is less than 1-hour.
REASON FOR DEVIATION RE UEST:
NRC guidance to 10 CFR 50 Appendix R Section III.G.2 requires that fire areas shall have three hour barriers, and such barriers shall have fire rated dampers installed at duct penetrations. Various fire walls within the Unit 1 and Unit 2 Reactor Building have ventilation system (HVAC) duct penetrations without fire dampers thus rendering the rating of the barrier less than three hours.
EXISTING CONDITIONS:
The maximum combustible loading [in-situ and transient] is less than 1-hour.
JUSTIFICATION:
The National Fire Protection Association "Fire Protection Handbook" (14th edition, page 7-64) states:
"In the gauges commonly used, some sheet metal ducts may protect an opening in a building construction assembly for up to 1-hour, if properly hung and adequately fire stopped. Therefore, ducts passing through fire barriers having a rating of up to 1-hour fire resistance can be assumed to present no extraordinary hazard. If the wall, partition, ceiling or floor is required to have a fire resistance rating of more than 1-hour, a fire damper is required
<<g ff f
P
,n V
N,
DEVIATION REQUEST NO. 11 PAGE NO. 2 The 18-gauge minimum ducts used at Susquehanna are heavier than the commonly used gauges referred to by the NFPA Statement. The ducts are seismically hung and adequately fire stopped.
A 1-hour fire test of horizontal steel ducts without a fire damper at the fire wall penetrations was conducted by Underwriters Laboratories using ASTH E-119 criteria. The test confirms the validity, of the NFPA statement. The test report is Attachment Number 1 to this request.
www/rpk20224li
I ,a
~ I
\
ji 1 P ~, (I
,K ll l')