Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request Associated with Modifications to the Control Bay Chillersystems at Browns Ferry Units 1, 2 and 3
ML18068A079
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/15/2018
From: Farideh Saba
Plant Licensing Branch II
To: James Shea
Tennessee Valley Authority
Saba F DORL/LPL2-2 301-415-1447
References
EPID L-2018-LRM-0009
Download: ML18068A079 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 15, 2018 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant, Units 1, 2, and 3

SUBJECT:

SUMMARY

OF FEBRUARY 15, 2018, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A PLANNED LICENSE AMENDMENT REQUEST ASSOCIATED WITH MODIFICATIONS TO THE CONTROL BAY CHILLER SYSTEMS AT BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (EPID L-2018-LRM-0009)

On February 15, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for TVA to present its planned license amendment request (LAR) regarding a design modification to utilize the Browns Ferry Unit 3 Control Bay Chiller as an alternate chilled-water source for Units 1 and 2 Electric Board Room Air Handling Units in order to support system operability. The meeting notice and agenda, dated February 2, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18045A711. A list of attendees is enclosed.

The licensee's presentation slides (ADAMS Accession No. ML18045A162) were provided prior to the meeting and the ADAMS Accession number associated with the slides was included in the meeting notice. During the meeting, the licensee described the plant configuration and prescribed the conditions resulting in the need for a Design Modification and LAR. The licensee also provided details on the proposed changes and its schedule for submittal and implementation of the LAR.

The NRC staff asked clarifying questions and provided observations on key issues. The staff also communicated to the licensee that the General Design Criterion 5 evaluation would be very important for NRC staff review of the submittal and that compensatory measures should be considered where appropriate. The licensee agreed with NRC staff's proposal that a technical or engineering audit may be needed as part of this review.

No regulatory decisions were made and no actions were taken during the meeting. There were no members of the public represented in the meeting. No Public Meeting Feedback forms were received.

Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.

Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES FEBRUARY 15, 2018, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A PLANNED LICENSE AMENDMENT REQUEST ASSOCIATED WITH MODIFICATIONS TO THE CONTROL BAY CHILLER SYSTEMS AT BROWNS FERRY NUCLEAR PLANT (BROWNS Ferry)

UNITS 1, 2, AND 3 Name Organization Natreon (Nate) Jordan U.S. Nuclear Regulatory Commission (NRC)

Andrew Hon NRC Robert Dennig NRC Matthew Hamm NRC Nageswara Karipineni NRC Larry Wheeler NRC Daniel Warner NRC Gurcharan Matharu NRC Ed Schrull Tennessee Valley Authority (TVA)

Gordon Williams TVA Erik Meisner TVA Todd Stafford TVA Ronald Hand TVA Matthew Kirschenheiter TVA Jamie Paul TVA Mike Oliver TVA Enclosure

SUBJECT:

SUMMARY

OF FEBRUARY 15, 2018, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A PLANNED LICENSE AMENDMENT REQUEST ASSOCIATED WITH MODIFICATIONS TO THE CONTROL BAY CHILLER SYSTEMS AT BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (EPID L-2018-LRM-0009)

DATED MARCH 15, 2018 DISTRIBUTION:

PUBLIC PM File Copy RidsNrrLABClayton Resource RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrPMBrownsFerry Resource RidsNrrDorl Resource RidsNrrDorlLp12-2 Resource AHon, NRR RidsNrrDssSbpb Resource MHamm, NRR NKaripineni, NRR LWheeler, NRR DWarner, NRR GMatharu, NRR TWertz, NRR LBurkhart, OEDO NJordan, NRR JBowen, OEDO ADAMS Access1on No.: ML18068A079 *b,y e-ma1*1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA NRR/DSS/SBPB/BC NAME NJordan BClayton BDennig*

DATE 3/13/2018 3/13/2018 3/13/2018 OFFICE DORL/LPL2-2/BC (A) DORL/LPL2-2/PM NAME BTindell FSaba DATE 3/15/2018 3/15/2018 OFFICIAL RECORD COPY