MONTHYEARTSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-190Issue date: 19 July 2022 Title: Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements Topic: Reactor Vessel Water Level TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-080Issue date: 8 July 2022 Title: Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability Topic: Safe Shutdown, High winds, Anticipated operational occurrence, Tornado Missile, Safe Shutdown Earthquake, Probabilistic Risk Assessment, Tornado-Generated Missile, Tornado Generated Missile, Fukushima Dai-Ichi, Tornado Missile Protection, Earthquake TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-220Issue date: 22 March 2022 Title: Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program Topic: Post Accident Monitoring, Probabilistic Risk Assessment, Pressure and Temperature Limits Report, Affidavit TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-230Issue date: 23 June 2021 Title: TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 Topic: Unanalyzed Condition, Reactor Vessel Water Level, Stroke time, Anticipated operational occurrence, Water Inventory Control, Hydrostatic, Past operability, Surveillance Frequency Control Program, Foreign Material Exclusion, Maintenance Rule Program, Fuel cladding TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-260Issue date: 26 January 2021 Title: Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Topic: Ultimate heat sink, Water Inventory Control, Surveillance Frequency Control Program TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-080Issue date: 8 June 2020 Title: Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections Topic: Non-Destructive Examination, Post Accident Monitoring, Nondestructive Examination, Pressure and Temperature Limits Report TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-090Issue date: 9 April 2020 Title: Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) Topic: Probabilistic Risk Assessment, Missed surveillance, Significance Determination Process, Surveillance Frequency Control Program, Large early release frequency, Pandemic TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-120Issue date: 12 February 2020 Title: Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements Topic: Water Inventory Control TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-160Issue date: 16 January 2020 Title: TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements Topic: Boric Acid, Surveillance Frequency Control Program, Pressure Boundary Leakage, Pressure boundary leak TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-130Issue date: 13 December 2019 Title: Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements Topic: Anticipated operational occurrence, Surveillance Frequency Control Program TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-030Issue date: 3 December 2019 Title: Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-050Issue date: 5 November 2019 Title: TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. Topic: Safe Shutdown, Ultimate heat sink, Anticipated operational occurrence TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-280Issue date: 28 August 2019 Title: Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position Topic: Ultimate heat sink, Anticipated operational occurrence, Water Inventory Control, Surveillance Frequency Control Program TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-080Issue date: 8 July 2019 Title: Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter Topic: Exemption Request TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-030Issue date: 3 July 2019 Title: Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. Topic: Reactor Vessel Water Level, High Radiation Area, Stroke time, Water Inventory Control, Operating Basis Earthquake, Surveillance Frequency Control Program, Earthquake, Control of Heavy Loads, Power Operated Valves, Fuel cladding, Offsite Circuit, Scaffolding, Affidavit TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-250Issue date: 25 June 2019 Title: TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition Topic: Shutdown Margin, Anticipated operational occurrence, Probabilistic Risk Assessment, Surveillance Frequency Control Program, Pressure Boundary Leakage TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-4932019-06-180Issue date: 18 June 2019 Title: TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 Topic: Backfit TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-06-180Issue date: 18 June 2019 Title: Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position Topic: Ultimate heat sink, Water Inventory Control, Surveillance Frequency Control Program TSTF-19-01, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems2019-01-170Issue date: 17 January 2019 Title: TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems TSTF-18-13, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program.2018-12-200Issue date: 20 December 2018 Title: TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. TSTF-18-06, TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition2018-10-310Issue date: 31 October 2018 Title: TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition Topic: Shutdown Margin, Anticipated operational occurrence, Probabilistic Risk Assessment, Surveillance Frequency Control Program, Pressure Boundary Leakage TSTF-18-12, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR2018-10-240Issue date: 24 October 2018 Title: TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR Topic: Reactor Vessel Water Level, Anticipated operational occurrence, Hydrostatic, Pressure and Temperature Limits Report, Surveillance Frequency Control Program, Minimum Critical Power Ratio, Fuel cladding TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2018-10-120Issue date: 12 October 2018 Title: TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. Topic: Probabilistic Risk Assessment, Surveillance Frequency Control Program, Large early release frequency TSTF-18-08, Updated TSTF Membership and Distribution2018-07-170Issue date: 17 July 2018 Title: Updated TSTF Membership and Distribution TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 22018-07-020Issue date: 2 July 2018 Title: TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 TSTF-18-05, TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR2018-05-290Issue date: 29 May 2018 Title: TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR Topic: Reactor Vessel Water Level, Anticipated operational occurrence, Hydrostatic, Pressure and Temperature Limits Report, Surveillance Frequency Control Program, Minimum Critical Power Ratio, Fuel cladding TSTF-17-19, TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2018-04-270Issue date: 27 April 2018 Title: TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Topic: Probabilistic Risk Assessment, Surveillance Frequency Control Program, Large early release frequency TSTF-18-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues.2018-04-160Issue date: 16 April 2018 Title: TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. Topic: Surveillance Frequency Control Program TSTF-18-03, Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases2018-03-300Issue date: 30 March 2018 Title: Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases Topic: Safe Shutdown, Missed surveillance TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition.2018-02-080Issue date: 8 February 2018 Title: Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. Topic: Shutdown Margin, Anticipated operational occurrence, Probabilistic Risk Assessment, Surveillance Frequency Control Program, Pressure Boundary Leakage TSTF-17-18, Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems.2018-01-190Issue date: 19 January 2018 Title: Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems. Topic: Surveillance Frequency Control Program TSTF-18-01, Technical Specifications Task Force - Change in TSTF Traveler Invoicing2018-01-120Issue date: 12 January 2018 Title: Technical Specifications Task Force - Change in TSTF Traveler Invoicing TSTF-17-17, Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program2017-12-190Issue date: 19 December 2017 Title: Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program Topic: Surveillance Frequency Control Program TSTF-17-16, Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.22017-12-190Issue date: 19 December 2017 Title: Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Topic: Surveillance Frequency Control Program TSTF-17-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2017-10-300Issue date: 30 October 2017 Title: Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-17-12, Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr.2017-08-280Issue date: 28 August 2017 Title: Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr. Topic: Reactor Vessel Water Level, Anticipated operational occurrence, Hydrostatic, Pressure and Temperature Limits Report, Surveillance Frequency Control Program, Minimum Critical Power Ratio, Fuel cladding TSTF-17-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements.2017-08-020Issue date: 2 August 2017 Title: TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. Topic: Water Inventory Control TSTF-17-09, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement.2017-07-240Issue date: 24 July 2017 Title: TSTF Comments on Draft Safety Evaluation for Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. Topic: Fuel cladding, Power change TSTF-17-08, Change in TSTF Traveler Invoicing2017-07-050Issue date: 5 July 2017 Title: Change in TSTF Traveler Invoicing Topic: Surveillance Frequency Control Program TSTF-17-07, Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2017-05-100Issue date: 10 May 2017 Title: Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Topic: Anticipated operational occurrence, Probabilistic Risk Assessment, Surveillance Frequency Control Program TSTF-17-06, Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications2017-05-090Issue date: 9 May 2017 Title: Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications Topic: Safe Shutdown TSTF-17-03, Technical Specifications Task Force - Request for Fee Exemption for TSTF-567, Add Containment Sump TS to Address GSI-191 Issues.2017-03-300Issue date: 30 March 2017 Title: Technical Specifications Task Force - Request for Fee Exemption for TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. TSTF-17-04, Technical Specifications Task Force - Transmittal of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues.2017-03-300Issue date: 30 March 2017 Title: Technical Specifications Task Force - Transmittal of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. Topic: Boric Acid, Ultimate heat sink, Coatings, Surveillance Frequency Control Program, Fuel cladding TSTF-17-05, Technical Specifications Task Force (TSTF) - Updated TSTF Membership and Distribution2017-02-230Issue date: 23 February 2017 Title: Technical Specifications Task Force (TSTF) - Updated TSTF Membership and Distribution TSTF-16-11, Response to NRC Request for Additional Information Regarding TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement.2017-02-020Issue date: 2 February 2017 Title: Response to NRC Request for Additional Information Regarding TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. TSTF-17-02, Technical Specifications Task Force - Request for NRC to Withdraw November 7, 2013 Letter to TSTF Concerning TSTF-51, TSTF-286, and TSTF-4712017-02-020Issue date: 2 February 2017 Title: Technical Specifications Task Force - Request for NRC to Withdraw November 7, 2013 Letter to TSTF Concerning TSTF-51, TSTF-286, and TSTF-471 TSTF-17-01, TSTF Draft Response to NRC Questions on TSTF-505, Provide Risk-Informed Extended Completion Times for 02/16/2017 Public Meeting2017-01-310Issue date: 31 January 2017 Title: TSTF Draft Response to NRC Questions on TSTF-505, Provide Risk-Informed Extended Completion Times for 02/16/2017 Public Meeting Topic: Maintenance Rule Program, Offsite Circuit TSTF-16-12, Technical Specifications Task Force - Updated TSTF Membership and Distribution2016-11-180Issue date: 18 November 2016 Title: Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-16-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 22016-11-020Issue date: 2 November 2016 Title: TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 Topic: Reactor Vessel Water Level, Water Inventory Control, Hydrostatic, Surveillance Frequency Control Program, Fuel cladding, Offsite Circuit TSTF-16-08, Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains.2016-10-130Issue date: 13 October 2016 Title: Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains. 2022-07-08
[table view] |