TSTF-17-08, Change in TSTF Traveler Invoicing
ML17187A476 | |
Person / Time | |
---|---|
Site: | Technical Specifications Task Force |
Issue date: | 07/05/2017 |
From: | Gustafson O, Morris J, Redd J, Vaughan J, Linda Williams APOG, B&W Pantex, BWR Owners Group, CE Avery, Combustion Engineering, PWR Owners Group, Westinghouse |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
TSTF-17-08 | |
Download: ML17187A476 (1) | |
Similar Documents at Technical Specifications Task Force | |
---|---|
Category:Letter type:TSTF
MONTHYEARTSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022
[Table view]Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-4932019-06-18018 June 2019 TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-06-18018 June 2019 Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-01, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems2019-01-17017 January 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems TSTF-18-13, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program.2018-12-20020 December 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. TSTF-18-06, TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition2018-10-31031 October 2018 TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition TSTF-18-12, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR2018-10-24024 October 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2018-10-12012 October 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. TSTF-18-08, Updated TSTF Membership and Distribution2018-07-17017 July 2018 Updated TSTF Membership and Distribution TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 22018-07-0202 July 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 TSTF-18-05, TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR2018-05-29029 May 2018 TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR TSTF-17-19, TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2018-04-27027 April 2018 TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program TSTF-18-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues.2018-04-16016 April 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. TSTF-18-03, Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases2018-03-30030 March 2018 Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition.2018-02-0808 February 2018 Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. TSTF-17-18, Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems.2018-01-19019 January 2018 Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems. TSTF-18-01, Technical Specifications Task Force - Change in TSTF Traveler Invoicing2018-01-12012 January 2018 Technical Specifications Task Force - Change in TSTF Traveler Invoicing TSTF-17-17, Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program2017-12-19019 December 2017 Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program TSTF-17-16, Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.22017-12-19019 December 2017 Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-17-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2017-10-30030 October 2017 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-17-12, Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr.2017-08-28028 August 2017 Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr. TSTF-17-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements.2017-08-0202 August 2017 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. TSTF-17-09, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement.2017-07-24024 July 2017 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. TSTF-17-08, Change in TSTF Traveler Invoicing2017-07-0505 July 2017 Change in TSTF Traveler Invoicing TSTF-17-07, Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2017-05-10010 May 2017 Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program TSTF-17-06, Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications2017-05-0909 May 2017 Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications TSTF-17-03, Technical Specifications Task Force - Request for Fee Exemption for TSTF-567, Add Containment Sump TS to Address GSI-191 Issues.2017-03-30030 March 2017 Technical Specifications Task Force - Request for Fee Exemption for TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. TSTF-17-04, Technical Specifications Task Force - Transmittal of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues.2017-03-30030 March 2017 Technical Specifications Task Force - Transmittal of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. TSTF-17-05, Technical Specifications Task Force (TSTF) - Updated TSTF Membership and Distribution2017-02-23023 February 2017 Technical Specifications Task Force (TSTF) - Updated TSTF Membership and Distribution TSTF-16-11, Response to NRC Request for Additional Information Regarding TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement.2017-02-0202 February 2017 Response to NRC Request for Additional Information Regarding TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. TSTF-17-02, Technical Specifications Task Force - Request for NRC to Withdraw November 7, 2013 Letter to TSTF Concerning TSTF-51, TSTF-286, and TSTF-4712017-02-0202 February 2017 Technical Specifications Task Force - Request for NRC to Withdraw November 7, 2013 Letter to TSTF Concerning TSTF-51, TSTF-286, and TSTF-471 TSTF-17-01, TSTF Draft Response to NRC Questions on TSTF-505, Provide Risk-Informed Extended Completion Times for 02/16/2017 Public Meeting2017-01-31031 January 2017 TSTF Draft Response to NRC Questions on TSTF-505, Provide Risk-Informed Extended Completion Times for 02/16/2017 Public Meeting TSTF-16-12, Technical Specifications Task Force - Updated TSTF Membership and Distribution2016-11-18018 November 2016 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-16-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 22016-11-0202 November 2016 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 TSTF-16-08, Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains.2016-10-13013 October 2016 Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains. 2022-07-08 |
Text
TECHNICAL SPECIFICATIONS TASK FORCE TSTF A JOINT OWNERS GROUP ACTIVITY July 5, 2017 TSTF-17-08 PROJ0753 Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Change in TSTF Traveler Invoicing The Technical Specifications Task Force requests a change in NRC review fee invoicing for the TSTF travelers listed below.
- TSTF-563, "Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program"
- TSTF-567, "Add Containment Sump TS to Address GSI-191 Issues" (If any review fees are assessed. A fee waiver has been requested and is being evaluated by the NRC.)
Future invoices for these travelers should be directed to NRC Project 0753, at the address:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Should you have any questions, please contact us.
James R. Morris (PWROG/W) Lisa L. Williams (BWROG)
Otto W. Gustafson (PWROG/CE) Jordan L. Vaughan (PWROG/B&W)
Jason P. Redd (APOG) cc: Michelle Honcharik, Technical Specifications Branch Robert Tjader, Technical Specifications Branch Jennifer Whitman, Technical Specifications Branch 11921 Rockville Pike, Suite 100, Rockville, MD 20852 Phone: 301-984-4400, Fax: 301-984-7600 Administration by EXCEL Services Corporation