Letter Sequence Other |
---|
TAC:ME7522, Clarify Application of Setpoint Methodology for LSSS Functions (Open) TAC:ME7523, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
Other: ML120250079, ML120590119, ML12276A050, ML13018A149, ML13024A105, ML13029A667, ML13101A278, ML13192A314, ML13232A258, ML13232A263, ML13339A428, ML15103A010, ML15121A310, ML15223A968
|
MONTHYEARML11279A1602011-09-27027 September 2011 Submittal of WNA-DS-02442-PGE, Rev. 2, Diablo Canyon Units 1 and 2 Process Protection System Replacement Project, Advanced Logic System (Als) - System Requirements Specification Project stage: Request ML1200602142012-01-0606 January 2012 Notice of Forthcoming Meeting in San Luis Obispo, CA, with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System of RPS and ESFAS Project stage: Meeting ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review Project stage: Other ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation Project stage: Meeting ML1204006512012-02-21021 February 2012 Summary of Meeting in San Luis Obispo, CA, with Pacific Gas and Electric; Discuss Digital Replacement of Process Protection System of Reactor Protection System and Engineered Safety Feature Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Meeting ML1205300742012-02-22022 February 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205300782012-02-22022 February 2012 3/7/2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205901192012-02-29029 February 2012 Summary of Phone Call with Licensee on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Other ML1207200832012-03-13013 March 2012 4/4/2012 - Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200922012-03-13013 March 2012 4/18/12 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200622012-03-20020 March 2012 Summary of 3/7/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-030, Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement2012-04-0202 April 2012 Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1209006882012-04-0404 April 2012 3/21/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1210101022012-04-11011 April 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-039, Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement2012-04-30030 April 2012 Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1211505042012-05-0303 May 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A2142012-05-24024 May 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time Project stage: Withholding Request Acceptance ML12170A8402012-06-0606 June 2012 Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. Project stage: Request ML12170A8372012-06-0606 June 2012 Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12222A1012012-06-0707 June 2012 Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 Project stage: Request ML12222A1002012-06-0707 June 2012 Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 Project stage: Request ML12222A0982012-06-0707 June 2012 Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 Project stage: Request ML12151A2582012-06-11011 June 2012 5/16/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A0342012-06-18018 June 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A8662012-06-27027 June 2012 6/13/2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 72012-07-11011 July 2012 Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 Project stage: Request ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents Project stage: Withholding Request Acceptance ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document Project stage: Withholding Request Acceptance ML12195A1732012-07-24024 July 2012 Forthcoming Meeting on 8/22/12 with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 Project stage: Meeting ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T Project stage: Request ML12208A3642012-08-0707 August 2012 Request for Additional Information, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions Project stage: RAI ML12240A0752012-08-27027 August 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-083, Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement2012-09-11011 September 2012 Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement Project stage: Response to RAI ML12242A2562012-09-25025 September 2012 8/22/12 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12275A2962012-10-0202 October 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12276A0502012-10-10010 October 2012 Regulatory Audit Plan for 11/13-16/2012 Audit at the Invensys Operations Management Facility in Lake Forest, CA, to Support Digital Replacement of Process Protection System License Amendment Request Project stage: Other ML12228A4042012-10-10010 October 2012 Request for Withholding Information from Public Disclosure, 7/23/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, for 993754-1-802 R2, 993754-1-813 R1, and 993754-1-906 R1 Project stage: Withholding Request Acceptance ML12284A4452012-10-16016 October 2012 Summary of 9/19/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML13004A4742012-10-24024 October 2012 Document 993754-1-915(NP), Rev. 1, Pacific Gas & Electric Company Nuclear Safety-Related Process Protection System Replacement, Diablo Canyon Power Plant, Safety Analysis. Project stage: Request ML12296A1822012-10-24024 October 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12297A2432012-10-31031 October 2012 Summary of 10/17/2012 Teleconference Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-120, Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement2012-11-27027 November 2012 Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12338A0932012-12-0404 December 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-121, Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement2012-12-0505 December 2012 Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12355A1382012-12-20020 December 2012 1/24/2013 - Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12361A3602013-01-10010 January 2013 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting 2012-04-11
[Table View] |
|
---|
Category:Audit Plan
MONTHYEARML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application ML24002B1802024-01-29029 January 2024 LRA Audit Plan ML23264A0012023-09-21021 September 2023 – Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML19106A3902019-04-23023 April 2019 Regulatory Audit Plan for Audit in Support of the License Amendment Request to Revise Technical Specification for Use of Full Spectrum Loss-Of-Coolant Accident Methodology ML17177A4462017-07-0606 July 2017 Audit Plan for Licensee Responses Concerning Seismic Hazard Reevaluations Related to Request for Information -(50.54(F) Letter) Regarding Recommendation 2.1 of the Near-Term Task Force ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML16193A3322016-07-12012 July 2016 Audit Plan for August 3-4, 2016, Nrr/Dra/Arcb Regulatory Audit at Westinghouse Facility in Rockville, MD, to Support Review of License Amendment Request for Adoption of Alternative Source Term ML15355A1572015-12-24024 December 2015 Regulatory Audit Plans for 01/12-14/2016 Audit at Westinghouse Facility to Support Review of License Amendment Requests for Adoption of Alternative Source Term and Revision of the UFSAR for Beacon Methodology ML15244B0992015-09-0404 September 2015 Nuclear Regulatory Commission Plan for the Audit of Pacific Gas and Electric Company'S Seismic Hazard and Screening Report Submittal Related to the Near-Term Task Force Recommendation 2.1- Seismic for Diablo Canyon Power Plant Unit Nos. 1 a ML15233A5182015-08-28028 August 2015 License Renewal Environmental Site Audit Regarding Diablo Canyon Power Plant, Units 1 and 2-SAMA ML15217A3562015-08-14014 August 2015 Nuclear Regulatory Commission Plan for the Audit of Pacific Gas and Electric Company'S Seismic Hazard and Screening Report Submittal Related to the Near-Term Task Force Recommendation 2.1 - Seismic for Diablo Canyon Power Plant, Unit Nos. 1 ML15189A3382015-07-20020 July 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15148A2072015-06-10010 June 2015 Nuclear Regulatory Commission Plan for the Audit of Pacific and Gas Electric Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 Flooding for Diablo Canyon Power Plant, Units 1 and 2 ML15121A3102015-05-15015 May 2015 Regulatory Audit Plan for June 8-12, 2015 Audit at the Westinghouse Facility in Warrendale, PA, to Support Digital Replacement of Process Protection System License Amendment Request (TAC ME7522-ME7523) ML14126A3772014-05-20020 May 2014 Regulatory Audit Plan for June 3-5, 2014 Audit at the Invensys Operations Management Facility in Lake Forest, CA, to Support Digital Replacement of Process Protection System License Amendment Request (TAC ME7522-ME7523) ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 ML13192A3142013-07-22022 July 2013 Regulatory Audit Plan for August 6-8, 2013, Audit to Support Review of Digital Instrumentation and Control License Amendment Request ML13029A6672013-02-0101 February 2013 Audit Plan for 2/11-14/13, Regulatory Audit at the CS Innovations/Westinghouse Facility in Scottsdale, Az, to Support Digital Replacement of Process Protection System License Amendment Request (TAC Nos. ME7522-ME7523) 2024-05-20
[Table view] Category:Letter
MONTHYEARML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 May 15, 2015
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 -REGULATORY AUDIT PLAN FOR JUNE 22-26, 2015, AUDIT AT WESTINGHOUSE FACILITY IN WARRENDALE, PENNSYLVANIA, IN SUPPORT OF DIGITAL PROCESS PROTECTION SYSTEM REPLACEMENT LICENSE AMENDMENT REQUEST (TAC NOS. ME7522 AND ME7523)
Dear Mr. Halpin:
By letter dated October 26, 2011, as supplemented by letters dated December 20, 2011; and April 2, April 30, June 6, August 2, September 11, November 27 and December 5, 2012; and March 7, March 25, April 30, May 9, May 30, and September 17, 2013; and April 24 and April 30, 2014; and February 2, 2015 (Agencywide Documents Access and Management System Accession Nos. ML113070457, ML113610541, ML12094A072, ML12131A513, ML12170A837, ML12222A094, ML12256A308, ML13004A468, ML12342A149, ML13267A129, ML13093A311, ML13121A089, ML13130A059, ML13154A049, ML13261A354, ML14205A031, ML14121A002, and ML15062A386, respectively), Pacific Gas and Electric Company requested the U.S. Nuclear Regulatory Commission (NRC) staff's approval of an amendment for the Diablo Canyon Power Plant, Units 1 and 2 (Diablo Canyon). The proposed license amendment request would provide a digital replacement of the Process Protection System portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon. To support its safety evaluation, the NRC Instrumentation and Controls Branch will conduct an audit at the Westinghouse facility in Warrendale, Pennsylvania, during the week of June 22-26, 2015. Enclosed is the plan to support this audit.
E. Halpin If you have any questions, please contact me at 301-415-1564 or via e-mail at Siva.Lingam@nrc.gov.
Docket Nos. 50-275 and 50-323
Enclosure:
Audit Plan cc w/encl: Distribution via Listserv Sincerely, Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 IN WARRENDALE, PENNSYLVANIA.
TO SUPPORT REVIEW OF DIGITAL PROCESS PROTECTION SYSTEM REPLACEMENT LICENSE AMENDMENT REQUEST Background PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT. UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323 The U.S. Nuclear Regulatory Commission (NRC) staff is currently engaged in a review of a digital safety system replacement for the Diablo Canyon Power Plant, Units 1 and 2 (Diablo Canyon). By letter dated October 26, 2011, Pacific Gas and Electric Company (PG&E, the licensee) submitted license amendment request (LAR) 11-07 to replace the Diablo Canyon Eagle 21 Process Protection System (PPS) with a new digital PPS (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11307A457). In addition, the licensee supplemented the LAR by letters dated December 20, 2011, and April 2, April 30, June 6, August 2, September 11, November 27, and December 5, 2012, and March 7, March 25, April 30, May 9, May 30, and September 17, 2013, and April 24 and April 30, 2014, and February 2, 2015 (ADAMS Accession Nos. ML113610541, ML12094A072, ML12131A513, ML12170A837, ML12222A094, ML12256A308, ML13004A468, ML12342A149, ML13267A129, ML13093A311, ML13121A089, ML13130A059, ML13154A049, ML13261A354, ML14205A031, ML14121A002, and ML15062A386, respectively).
The LAR requested NRC review and approval of the proposed design. As part of this review, the NRC staff is conducting a regulatory audit of the Advanced Logic System (ALS) portion of the Diablo Canyon PPS (DCPPS) replacement system. In February of 2013, the NRC staff conducted an initial audit of the ALS system development processes in Scottsdale, Arizona (see audit report dated October 8, 2013; ADAMS Accession No. ML13232A263).
During that audit, the NRC staff was unable to observe how the design phase outputs are subject to the Verification and Validation (V&V) processes because the V&V activities had not been completed.
The NRC staff also identified several open items and noted that a follow-up audit would be necessary to evaluate resolution activities for each of these open items. Regulatory Audit Basis To support its safety evaluation (SE), the NRC Instrumentation and Controls Branch (EICB) will conduct a second audit at the Westinghouse facility in Warrendale, Pennsylvania.
The purpose of this confirmatory audit is to determine if the life cycle processes used, and the outputs of those processes have resulted in a PPS system for use at Diablo Canyon, which will meet Enclosure regulatory requirements.
This audit will provide information necessary to complete the NRC staff's evaluation of the proposed ALS portion of the DC PPS. Regulatory Audit Scope The objective of this audit is to verify, via an independent evaluation, the ALS subsystem of the DCPPS conforms to applicable regulations, standards, guidelines, plans, and procedures by assessing the implementation of the systems developmental life cycle process. Audit Requirements
- 1. Threads reviewed during first audit -Several requirement threads were reviewed through the requirements phase during the first ALS audit. The team will select from this list to perform follow-up reviews through the design and implementation phases of PPS system development.
The team intends to trace system requirements to specific test cases to be performed during the Factory Acceptance Test. 2. Additional topic areas to be covered during second audit: a. Time Response -The NRC will review the relation between the specified time response requirements for PPS and the safety analysis response time assumptions listed in the Updated Final Safety Analysis Report Table 15.1-2. The objective of this audit activity is to understand and confirm how the PPS component of the overall safety system response time assumptions is derived. b. Project Risk Mitigation (SE Section 3.4.1.1) -Westinghouse uses Risk Assessment Worksheet (RAW) to identify risk, problem and mitigation strategies.
This worksheet is maintained and reviewed periodically by the Project Leadership Team. The NRC staff plans to review RAWs associated with the PPS project to confirm performance of risk mitigation activities.
- c. Configuration Verification (SE Section 3.10.1. 7) -Conduct Audit activity to observe how the Maintenance Workstation/ALS Service Unit (ASU) is used to verify that correct logic implementation is installed into the DCPPS ALS-102 Core Logic boards. Determine if this verification activity can be done with the system operable and if surveillance tests will be performed to periodically verify correct logic implementation.
Determine if accessing the board's Non-Volatile Memory will require connecting the Test ALS Bus (TAB) or if this configuration information can be accessed through the communication channels TxB1, and TxB2 communication links. Review the Configuration Status Accounting document 6116-00050 and verify that the revision number and other identification information is available for each of the configuration items. This audit item is associated with Open Item 109 of the DC PPS Open Item List. d. Redundancy Checker (LAR 4.2.5.2 page 64) -The LAR states that the redundancy checker compares outputs and critical initial states from the two cores and will drive the board to a safe state when the outputs do not agree. The NRC staff plans to audit the requirements associated with defining these states and confirm implementation within the system design. This audit item is associated with Open Item 110 of the DC PPS Open Item List. e. TAB Connection Verification (LAR 4.2.13.5 page 95) -The LAR states that the ASU software ensures that the correct TAB is connected to the respective Electronics Industries Alliance (EIA)-485 port when the TAB is enabled. The NRC staff plans to review requirements associated with this function and confirm implementation within the ALS system design. f. TAB and TXB Configuration and Communication (LAR 4.2.9 page 74) -Transmit Bus TxB2 transmits data from each ALS chassis "A" and "B" ALS-102 Core Logic Board to the Maintenance Workstation.
Two-way communications are permitted only when the TAB communication link is physically connected between the TAB and the ALS Maintenance Workstation.
The NRC staff plans to review requirements associated with these functions and confirm implementation within the ALS system design. This audit item is associated with Open Items 69, 81, and 106 of the DC PPS Open Item List. g. V&V Activities Associated with "Verification of Diversity" -The NRC staff will audit V&V activities used to ensure that the completed Core A and Core B logic implementations are sufficiently diverse so that logic implementation errors common to both cores will not need to be considered.
The audit team plans to evaluate the ALS Platform Field Programmable Gate Array (FPGA) V&V Test Plan, 6002-00018 and the V&V activities prescribed therein to confirm the necessary degree of diversity is achieved.
- h. Indication of Channel Bypass Status -This audit item is associated with Open Item 111 of the DCPPS Open Item List. The NRC staff will perform a thread review of requirement R4082 of the FPGA Requirements Specification 6116-10201.
This requirement has been superseded; however, the NRC plans to evaluate how the initiating functional requirement is being satisfied in the completed system design. Additional V&V activity documents will be reviewed as necessary to accomplish the objectives of this audit item. i. Secure Development Environment
-Verify that the development environment established for the DCPPS development effort conforms to the requirements of Regulatory Guide 1.152, Revision 3. The NRC staff will review the secure development activities by Westinghouse since moving the development environment from Scottsdale, Arizona, to the Warrendale, Pennsylvania, facility. Information Necessary for the Regulatory Audit The following documentation and supporting materials will need to be available for review in the performance of this audit.
The NRC requests that these documents be available to the audit team upon arrival at the Westinghouse facility.
- Configuration Diagrams for the ALS portion of the DCPPS
- PPS Architecture drawings as required to demonstrate required functionality
- Diablo Canyon FPGA Requirements Specification 6116-10201
- Diablo Canyon Core A and Core B FPGA Design Specifications (6116-10203 and 6116-10204)
- Current DCPPS Requirements Traceability Matrix 6116-00059
- Configuration Status Accounting, 6116-00050, Rev. X (most current)
- DCPPS Configuration Management Report, 6116-00400, Rev. X (most current)
- DCPPS Secure Development Environment Vulnerability Assessment, Rev. X (most current)
- IOI Requirements, WNA-PS-02884-GEN
- IOI Assessment, WNA-CS-00117-GEN The audit staff also requests access to the current Project Traceability Matrix information in order to observe that applicable functional requirements are correctly implemented in the PPS. Team Assignments I Resource Estimates The resource estimate for this audit visit is approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> of direct review activity.
The NRC staff performing this audit will be: NRC/NRR [Office of Nuclear Reactor Regulation]/DE
[Division of Engineering]/EICB
- John Thorp (301) 415-8508 NRG/Region IV/DRS [Division of Reactor Safety]/EB2
{Engineering Branch 2]
- Shiattin Maker (817) 200-1507 Logistics The audit will start at 1 :00 p.m. on Monday, June 22, 2015, and conclude on Friday, June 26, 2015, at the Westinghouse offices in Warrendale, Pennsylvania. Our tentative schedule for the audit is as follows: Date Time Audit Activity Lead Monday 1 :00 p.m. Entrance meeting Stattel
- Discuss purpose & objectives of audit
- Westinghouse staff to provide overview of Warrendale PPS Project & facility.
2:00 p.m. Review Results of first audit in Scottsdale and Open Alvarado Items identified during that audit with PG&E and Westinghouse.
Discuss CS Innovations, LLC (CSI), a Westinghouse Electric Company, procedures superseded by Westinghouse.
3:00 p.m. Perform follow-up actions associated with the NRC requirement threads evaluated during previous audit. Review Secure Development Environment Darbali documentation.
5:00 p.m. Adjourn Tuesday 9:00 a.m. Morning meeting between NRC staff and Westinghouse to discuss activities and logistics for the day. 9:30 a.m. Review of PPS documentation I Conduct interviews NRC with key Westinghouse personnel.
Observe Secure Development Environment and Configuration Darbali Management features of the facility.
2:00 p.m. Discuss Preliminary Inspection Items List with Licensee Stattel 4:00 p.m. Discuss software planning documents.
Alvarado 5:00 p.m. Adjourn Wednesday 9:00 a.m. Morning meeting between NRC staff and Westinghouse to discuss activities and logistics for the day. 9:30 a.m. Discuss ALS system communication and Interim Staff NRC Guidance (ISG)-04 compliance.
Observe Configuration Verification features of the ALS Maintenance Work Station (MWS)/ASU.
2:00 p.m. Review status of Equipment Qualification (EQ) Stattel evaluations.
5:00 p.m. Adjourn Thursday 9:00 a.m. Morning meeting between NRC staff and Westinghouse to discuss activities and logistics for the day. 9:30 a.m. Perform audit review activities.
NRC 3:00 p.m. NRC staff internal meeting -identification I resolution of NRC any open items. Friday 9:00 a.m. NRC Staff Internal Meeting -Preparation for Exit NRC 10:00 a.m. Exit meeting -NRC staff -provide general overview of All observations
& identification of any open items. 11 :00 a.m. Adjourn Deliverables At the conclusion of the audit, the NRC staff will conduct an exit briefing and will provide a summary of audit results in each subject area defined in the audit scope. The NRC Regulatory Audit Report will be issued by August 10, 2015. References Licensee Documentation:
- Westinghouse Electric Company LLC, 6002-00301-NP-A, Revision 4, "Advanced Logic System Topical Report and Safety Evaluation," September 2013 (ADAMS Accession No. ML13298A094).
- Pacific Gas & Electric, "Diablo Canyon Units 1 and 2, License Amendment Request 11-07 Process Protection System Replacement," dated October 26, 2011 (ADAMS package Accession No. ML113070457).
- Pacific Gas & Electric Company, "Process Protection System Replacement Diversity
& Defense-in-Depth Assessment Topical Report, Revision 1," August 201 O (ADAMS package Accession No. ML102580728).
- Pacific Gas & Electric Company, "Process Protection System (PPS( Replacement System Quality Assurance Plan (SyQAP), Revision 1," March 2013 (ADAMS Accession No. ML13130A059).
- Pacific Gas & Electric Company, "Process Protection System (PPS) Replacement System Verification and Validation Plan (SyVVP), Revision 1," February 2013 (ADAMS Accession No. ML13093A312).
- Pacific Gas & Electric Company, "Process Protection System Replacement, SCM 36-01 Software Configuration Management Plan (SCMP), Revision 1," May 2013 (ADAMS Accession No. ML13154A047).
- Pacific Gas & Electric Company, "Security Related Information to Support Process Protection System Replacement License Amendment Request 11-07" (security-related Enclosure to PG&E Letter DCL-11-123 dated December 20, 2011; ADAMS Accession No. ML113610541). NRC Guidance:
- U.S. Nuclear Regulatory Commission, NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition" (SRP), Chapter 7, "Instrumentation and Controls."
- U.S. Nuclear Regulatory Commission, Regulatory Guide 1.152, Revision 3, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants," July 2011 (ADAMS Accession No. ML102870022).
- U.S. Nuclear Regulatory Commission, Regulatory Guide 1.168, Revision 1, "Verification, Validation, Reviews, and Audits for Digital Computer Software Used in Safety Systems of Nuclear Power Plants," February 2004 (ADAMS Accession No. ML040410189).
- U.S. Nuclear Regulatory Commission, Regulatory Guide 1.169, "Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants," September 1997 (ADAMS Accession No. ML003740102).
- U.S. Nuclear Regulatory Commission, Regulatory Guide 1.173, "Developing Software Life Cycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants," September 1997 (ADAMS Accession No. ML003740101).
- Nuclear Energy Institute, NEI 08-09, Revision 6, "Cyber Security Plan for Nuclear Power Reactors," April 2010 (security-related).
Industry Standards:
- Institute of Electrical and Electronics Engineers Standard 7-4.3.2-2003, "IEEE Standard Criteria for Digital Computers in Safety Systems of Nuclear Power Generating Stations."
- American National Standards Institute/Institute of Electrical and Electronics Engineers Standard 1008-1987, "IEEE Standard for Software Unit Testing."
- Institute of Electrical and Electronics Engineers Standard 1012-1998, "IEEE Standard for Software Verification and Validation."
- Institute of Electrical and Electronics Engineers Standard 1028-1997, "IEEE Standard for Software Reviews and Audits."
- American National Standards Institute/Institute of Electrical and Electronics Engineers Standard 1042-1987, "IEEE Guide to Software Configuration Management."
- Institute of Electrical and Electronics Engineers Standard 1074-1995, "IEEE Standard for Developing Software Life Cycle Processes."
E. Halpin If you have any questions, please contact me at 301-415-1564 or via e-mail at Siva.Lingam@nrc.gov.
Docket Nos. 50-275 and 50-323
Enclosure:
Audit Plan cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorllpl4-1 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsRgn4MailCenter Resource RStattel, NRR/DE/EICB RAlvarado, NRR/DE/EICB SMakor, RIV/DRS/EB2 SDarbali, NRR/DE/EICB ADAMS A ccess1on N o.: ML15121A310 OFFICE NRR/DORL/LPL4-1
/PM NRR/DORL/LPL4-1
/LA NAME Slingam JBurkhardt DATE 5/4/15 5/4/15 Sincerely, IRA/ Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
- b d 1y memoran um NRR/DE/EICB/BC*
N RR/DORL/LPL4-1
/BC NRR/DORL/LPL4-1
/PM JThorp MMarkley Slingam 4/2/15 5/15/15 5/15/15 OFFICIAL RECORD COPY