Letter Sequence Request |
---|
TAC:ME7522, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
Other: ML120250079, ML120590119, ML12276A050, ML13018A149, ML13024A105, ML13029A667, ML13101A278, ML13192A314, ML13232A258, ML13232A263, ML13339A428, ML15103A010, ML15121A310, ML15223A968
|
MONTHYEARML11279A1602011-09-27027 September 2011 Submittal of WNA-DS-02442-PGE, Rev. 2, Diablo Canyon Units 1 and 2 Process Protection System Replacement Project, Advanced Logic System (Als) - System Requirements Specification Project stage: Request ML1200602142012-01-0606 January 2012 Notice of Forthcoming Meeting in San Luis Obispo, CA, with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System of RPS and ESFAS Project stage: Meeting ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review Project stage: Other ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation Project stage: Meeting ML1204006512012-02-21021 February 2012 Summary of Meeting in San Luis Obispo, CA, with Pacific Gas and Electric; Discuss Digital Replacement of Process Protection System of Reactor Protection System and Engineered Safety Feature Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Meeting ML1205300742012-02-22022 February 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205300782012-02-22022 February 2012 3/7/2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205901192012-02-29029 February 2012 Summary of Phone Call with Licensee on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Other ML1207200832012-03-13013 March 2012 4/4/2012 - Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200922012-03-13013 March 2012 4/18/12 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200622012-03-20020 March 2012 Summary of 3/7/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-030, Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement2012-04-0202 April 2012 Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1209006882012-04-0404 April 2012 3/21/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1210101022012-04-11011 April 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-039, Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement2012-04-30030 April 2012 Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1211505042012-05-0303 May 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A2142012-05-24024 May 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time Project stage: Withholding Request Acceptance ML12170A8402012-06-0606 June 2012 Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. Project stage: Request ML12170A8372012-06-0606 June 2012 Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12222A1012012-06-0707 June 2012 Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 Project stage: Request ML12222A1002012-06-0707 June 2012 Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 Project stage: Request ML12222A0982012-06-0707 June 2012 Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 Project stage: Request ML12151A2582012-06-11011 June 2012 5/16/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A0342012-06-18018 June 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A8662012-06-27027 June 2012 6/13/2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 72012-07-11011 July 2012 Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 Project stage: Request ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents Project stage: Withholding Request Acceptance ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document Project stage: Withholding Request Acceptance ML12195A1732012-07-24024 July 2012 Forthcoming Meeting on 8/22/12 with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 Project stage: Meeting ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T Project stage: Request ML12208A3642012-08-0707 August 2012 Request for Additional Information, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions Project stage: RAI ML12240A0752012-08-27027 August 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-083, Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement2012-09-11011 September 2012 Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement Project stage: Response to RAI ML12242A2562012-09-25025 September 2012 8/22/12 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12275A2962012-10-0202 October 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12276A0502012-10-10010 October 2012 Regulatory Audit Plan for 11/13-16/2012 Audit at the Invensys Operations Management Facility in Lake Forest, CA, to Support Digital Replacement of Process Protection System License Amendment Request Project stage: Other ML12228A4042012-10-10010 October 2012 Request for Withholding Information from Public Disclosure, 7/23/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, for 993754-1-802 R2, 993754-1-813 R1, and 993754-1-906 R1 Project stage: Withholding Request Acceptance ML12284A4452012-10-16016 October 2012 Summary of 9/19/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML13004A4742012-10-24024 October 2012 Document 993754-1-915(NP), Rev. 1, Pacific Gas & Electric Company Nuclear Safety-Related Process Protection System Replacement, Diablo Canyon Power Plant, Safety Analysis. Project stage: Request ML12296A1822012-10-24024 October 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12297A2432012-10-31031 October 2012 Summary of 10/17/2012 Teleconference Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-120, Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement2012-11-27027 November 2012 Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12338A0932012-12-0404 December 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-121, Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement2012-12-0505 December 2012 Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12355A1382012-12-20020 December 2012 1/24/2013 - Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12361A3602013-01-10010 January 2013 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting 2012-04-11
[Table View] |
|
---|
Category:Letter type:DCL
MONTHYEARDCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System 2024-09-09
[Table view] |
Text
Attachment 1 to the Enclosure contains Proprietary Information - Withhold Under 10 CFR 2.390 Pacific Gas and Electric Company James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.3462 April 30, 2012 Internal: 691. 3462 Fax: 805.545.6445 PG&E Letter DCL-12-039 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Submittal of V1 0 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement
References:
- 1. PG&E Letter DCL-11-104, "License Amendment Request 11-07, Process Protection System Replacement," dated October 26,2011.
- 2. NRC Letter "Diablo Canyon Power Plant, Unit Nos. 1 and 2 ~
Acceptance Review of License Amendment Request for Digital Process Protection System Replacement (TAC Nos. ME7522 and ME7523)," dated January 13, 2012.
- 3. PG&E Letter DCL-12-030, "Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement," dated April 2,2012.
Dear Commissioners and Staff:
In Reference 1, Pacific Gas and Electric (PG&E) submitted License Amendment Request 11-07 to request NRC approval to replace the Diablo Canyon Power Plant Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Invensys Operations Management Tricon Programmable Logic Controller, Version 10, and the CS Innovations, LLC (a Westinghouse Electric Company), Advanced Logic System.
In Reference 2, the NRC staff documented its acceptance of Reference 1 for review and requested further clarification be provided for nine items. PG&E's response to the staff's request for further clarification was submitted in Reference 3. In the Reference 3 response for clarification Item 1, PG&E committed to submit the time response calculation for the Invensys Operations Management V1 0 Tricon PPS Replacement architecture. The V1 0 Tricon PPS Replacement architecture time response calculation is contained in Attachment 1 to the Enclosure.
Attachment 1 to the Enclosure contains Proprietary Information When separated from Attachment 1 to the Enclosure, this document is decontrolled .
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
Attachment 1 to the Enclosure contains Proprietary Information - Withhold Under 10 CFR 2.390 I
I I
Document Control Desk
~ April 30, 2012 Page 2 PG&E Letter DCL-12-039 The Invensys Operations Management document 993754-1-817, Revision 1, "Maximum TSAP Scan Time", contained in Attachment 1 to the Enclosure contains information proprietary to Invensys Operations Management. Accordingly, Attachment 2 to the Enclosure includes Invensys Operations Management Affidavit No. 993754-AFF-36T. The affidavit is signed by Invensys Operations Management, the owner of the information. The affidavit sets forth the basis on which the Invensys Operations Management proprietary information contained in Invensys Operations Management document 993754-1-817, Revision 1, "Maximum TSAP Scan Time" may be withheld from public disclosure by the Commission, and it addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390 of the Commission's regulations. PG&E requests that the Invensys Operations Management proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390.
Correspondence with respect to the Invensys Operations Management proprietary information or the Invensys Operations Management affidavit provided in Attachment 2 to the Enclosure should reference Invensys Operations Management Affidavit No. 993754-AFF-36T and be addressed to Roman Shaffer, Project Manager, Invensys Operations Management, 26561 Rancho Parkway South, Lake Forest, CA 92630.
If you have any questions, or require additional information, please contact Tom Baldwin at (805) 545-4720.
This information does not affect the results of the technical evaluation or the significant hazards consideration determination previously transmitted in Reference 1.
This communication does not contain any regulatory commitments (as defined by NEI99-04).
I state under penalty of perjury that the foregoing is true and .correct.
Executed on April 30, 2012.
Sincerely,
~"---"1 James R. Becker Site Vice President Attachment 1 to the Enclosure contains Proprietary Information When separated from Attachment 1 to the Enclosure, this document is decontrolled .
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
Attachment 1 to the Enclosure contains Proprietary Information - Withhold Under 10 CFR 2 .390 Document Control Desk PG&E Letter DCL-12-039 April 30, 2012 Page 3 kjse/4328 SAPN 50271918 Enclosure cc: Diablo Distribution cc/enc: Gary W. Butner, Branch Chief, California Department of Public Health Elmo E. Collins, NRC Region IV Michael S. Peck, NRC, Senior Resident Inspector Joseph M. Sebrosky, NRR Project Manager Alan B. Wang, NRR Project Manager Attachment 1 to the Enclosure contains Proprietary Information When separated from Attachment 1 to the Enclosure, this document is decontrolled .
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
Attachment 1 to the Enclosure contains Proprietary Information - Withhold Under 10 CFR 2.390 Enclosure PG&E Letter DCL-12-039 PG&E Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement Invensys Operations Management provided detailed information on the deterministic operation of the V1 0 Tricon to address NRC Interim Staff Guidance 06 Enclosure B, Item 1.3, in Invensys Operations Management Letter No. NRC-V1 0-11-001, dated January 5, 2011. In support of the V1 0 Tricon safety evaluation, Invensys Operations Management submitted document 9600164-731, "Maximum Response Time Calculations," describing the worst-case response time for the V1 0 Tricon Qualification System. Included in document 9600164-731 are the standard equations for calculating worst-case response time of a given V10 Tricon configuration.
The time response calculation for the V1 0 Tricon for the Diablo Canyon Power Plant Process Protection System Replacement architecture is contained in Invensys Operations Management document 993754-1-817, Revision 1, "Maximum TSAP Scan Time," contained in Attachment 1 to this Enclosure. As previously stated in PG&E Letter DCL-12-030, "Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement," dated April 2, 2012, the Tricon response time will be verified as part of the factory acceptance test (FAT) and the results will be documented in the System Response Time Confirmation Report, 993754-1-818, that will be submitted to the staff as part of the ISG-06 Phase 2 submittals at the completion of FAT for the V10 Tricon PPS Replacement architecture.
1 Attachment 1 to the Enclosure contains Proprietary Information When separated from Attachment 1 to the Enclosure, this document is decontrolled.
to the Enclosure contains Proprietary Information - Withhold Under 10 CFR 2.390 Enclosure Attachment 2 PG&E Letter DCL-12-039 Invensys Operations Management Affidavit No. 993754-AFF-36T for Invensys Operations Management document 993754-1-817, Revision 1, "Maximum TSAP Scan Time" Attachment 1 to the Enclosure contains Proprietary Information When separated from Attachment 1 to the Enclosure, this document is decontrolled .
993754-AFF-36T AFFIDAVIT No. 993754-AFF-36T Re: Request for Withholding from Public Disclosure per 10CFR2.390 STATE OF CALIFORNIA ss COUNTY OF ORANGE I, Roman Shaffer, being duly sworn, hereby say and depose:
- 1. I am the Diablo Canyon PPS Replacement Project Manager for Invensys Operations Management, and as such I have been specifically delegated the function of reviewing company proprietary information sought to be withheld from public disclosure in connection with nuclear IE qualification and application of the TRICON Programmable Logic Controller (PLC) and am authorized to apply for its withholding on behalf of the Nuclear Delivery Unit of Invensys Operations Management.
- 2. The information sought to be withheld is contained in the document(s) described below:
(1) Maximum TSAP Scan Time, 993754-1-817, Rev 1 The indicated document contains information considered to be proprietary. Proprietary material in the enclosed document is indicated by brackets [ ] or other similar markings as required by IOCFR2.390(b)(1)(i)(B). A Non-proprietary version of the document is not being provided, due to the predominantly proprietary content.
This information is associated with the Diablo Canyon Power Plant (DCPP) Process Protection System Replacement Project, which incorporates Invensys Operations Management TRICON systems and delegated digital application project integration services. This will allow the NRC to verify compliance with current regulatory requirements for certain Invensys Operations Management activities in support of the DCPP PPS Replacement Project.
- 3. I am making this affidavit in confonnance with the provisions of I OCFR Part 2.390 of the Commission's regulations and in conjunction with the Invensys Operations Management application for withholding accompanying this affidavit.
- 4. I have personal knowledge of the criteria and procedures utilized by the Nuclear Delivery Unit of Invensys Operations Management in designating information as a trade secret, privileged, or as confidential commercial or financial information. Some examples of categories of information which fit into the definition of proprietary infonnation are:
a) Information which discloses process, method, or apparatus, including supporting data and analyses, where prevention of its use by Invensys Operations Management's competitors without license or contract from Invensys constitutes a competitive economic advantage over other companies in the industry.
b) Information, which if used by competitors, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, application, installation, assurance of quality, or licensing of a similar product.
c) Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of Invensys Operations Management, its customers, its partners, or its suppliers.
Page 1 of3
993754-AFF-36T d) Information which reveals aspects of past, present, or future Invensys Operation Management customer-funded development plans or programs, of potential commercial value to Invensys.
e) Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
t) Information obtained through Invensys Operation Management actions which could reveal additional insights into nuclear equipment qualification processes, customer applications, and regulatory proceedings, and which are not otherwise readily obtainable by a competitor.
Information to be withheld is considered to be proprietary based on 10CFR2.390(a)(4), with consideration of the reasons set forth above.
- 5. This document describes the details ofa program to qualify Invensys Triconex equipment for IE application, product design details, and/or customer application approaches. Invensys Triconex is the first manufacturer ofa PLC to fully implement the requirements set forth in the EPRI TR-I07330, which has been endorsed by the Commission in an SER. Invensys Triconex has expended a significant amount of money and effort involving numerous contractors over a 10 year time period to develop and implement an ongoing successful approach to its test programs and nuclear applications. Information developed relating to test plans, approaches, equipment, specific problems encountered, licensing perspectives, application approaches, and lessons learned has significant value because of the resources expended to successfully accomplish this process and the usefulness of this knowledge to potential competitors.
Specific data showing compliance with requirements and demonstrating technical capability of the equipment has substantial commercial value because it provides the basis for qualifying Invensys Triconex equipment and implementing safety-related digital upgrades to nuclear plants. Existing options for digital upgrades in the nuclear industry are limited. We believe that ongoing successful 1E qualification upgrades of the TRICON PLC products and implementation of plant application projects will continue to give Invensys Operations Management a competitive advantage in this field.
Disclosure of information in these documents would cause substantial harm to the competitive position of the Invensys Operations Management, as there are other competing companies who wish to qualify digital PLC controllers and apply them in safety related applications in nuclear power plants. Competing firms could use our experience, successful approaches, and technical information to facilitate their own equipment qualification efforts, application approaches, and/or product design without compensating Invensys Operations Management.
- 6. Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Invensys Operations Management.
(ii) The information is of a type customarily held in confidence by Invensys Operations Management and not customarily disclosed to the public. Invensys Operations Management has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to detennine when and whether to hold certain types of information in confidence.
The application of that system and the substance of that system constitute Invensys Operations Management policy and provide the rational basis required.
(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10CFR Part 2.390, it is to be received in confidence by the Commission.
(iv) This information is not readily available in public sources.
(v) Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Invensys Operations Management because it would enhance the ability of competitors to provide similar design and qualification ofPLC systems and associated applications using similar project methods, equipment, testing approach, contractors, or licensing approaches. As described in section 5, this information is the result of considerable expense to Invensys and has great value in that it will assist Invensys in providing Invensys Triconex digital upgrade equipment and services to a new, expanding markets not currently served by the company.
Page 2 of3
993754-AFF-36T
- 7. The foregoing statements are true and correct to the best of my knowledge, information, and belief.
Project Manager, DCPP PPS Replacement Project Invensys Operations Management Sworn to and subscribed before me this I() dayof Apr~ ,2012 I
L-MiL~~
}clary Public State of Cali!O~a r .......~ t >a County of '-:;'~"!""~:-';;.J..~~~--
Subscribed and sworn tQ (or affirmed) beforen
~~ ~ d§~ ~ ,20. '
proved to me on the basis of ~tisfactory eVidence to be the py~nw00~r:~ me.
Signature~~ (Seal)
Page 3 of3