IR 05000373/2018003

From kanterella
Revision as of 19:09, 12 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NRC Integrated Inspection Report 05000373/2018003 and 05000374/2018003
ML18313A199
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/08/2018
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018003
Download: ML18313A199 (34)


Text

/RA/

OFFICIAL RECORD COPY

Code of Federal Regulations

Concrete containment examinations: Fifth provisio For Class CC applications, the applicant or licensee must evaluate the acceptability of inaccessible areas when conditions exist in accessible areas that could indicate the presence of or the result in degradation to such inaccessible area For each inaccessible area identified, the applicant or licensee must provide the following in the ISI Summary Report required by IWA-6000:

(1) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; (2) An evaluation of each area, and the result of the evaluation; and (3) A description of necessary corrective action ****

sic