IR 05000373/2022402

From kanterella
Jump to navigation Jump to search
County Station - Security Baseline Inspection Report 05000373/2022402 and 05000374/2022402
ML22320A266
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/17/2022
From: Alan Anderson, Steven Orth
NRC/RGN-III/DRSS/SEPIR
To: Rhoades D
Constellation Energy Generation
References
IR 2022402
Download: ML22320A266 (1)


Text

SUBJECT:

LASALLE COUNTY STATION - SECURITY BASELINE INSPECTION REPORT 05000373/2022402 AND 05000374/2022402

Dear Mr. David Rhoades:

On November 1, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station and discussed the results of this inspection with Ms. Cynthia Wilson, Security Manager and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000373 and 05000374 License Nos. NPF-11 and NPF-18

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000373 and 05000374

License Numbers:

NPF-11 and NPF-18

Report Numbers:

05000373/2022402 and 05000374/2022402

Enterprise Identifier:

I-2022-402-0014

Licensee:

Constellation Nuclear

Facility:

LaSalle County Station

Location:

Marseilles, IL

Inspection Dates:

October 24, 2022 to November 01, 2022

Inspectors:

A. Anderson, Allegation/Enforcement Specialist

E. Bonano, Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Security, Emergency Preparedness,

and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at LaSalle County Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All

Tier II: 02.06 a, d; 02.07 a; 02.08 a - d, e, h

Tier III: 02.10 a

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All

Tier II: 02.09 a; 02.10 a; 02.11 d; 02.13 a Tier III: 02.14; 02.15

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this inspection procedure. Specifically, the licensee has not initiated a physical security plan change in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2) since the last performance of this inspection procedure.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) September 1, 2021 through September 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 1, 2022, the inspectors presented the security baseline inspection results to Ms. Cynthia Wilson, Security Manager and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Miscellaneous

Access Authorization Denial List

10/01/2021 -

10/10/2022

SY-AA-101-110

Security Sealing Operations

SY-AA-101-112

Exelon Security Search Processes

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

SY-AA-101-118

Control of Badges

SY-AA-101-120

Control of Security Access Control Devices

71130.02

Procedures

SY-LA-101-112

OCA Warehouse Search Activities

Miscellaneous

Safeguards Event Log, LaSalle

05/06/2022 -

10/11/2022

LEP-GM-165

Security UPS (0IS04E) General Inspection

LEP-SS-02

Door Intrusion Alarm Surveillance

LES-SS-03

Security Microwave Transmitter-Receiver Surveillance

LES-SS-05

Security Diesel Generator Preventive Maintenance

Inspection

LES-SS-06

Perimeter Camera Surveillance

LES-SS-12

Unizone Early Warning System Inspection

LIP-IS-903

Entryscan 4 Explosives Detector Maintenance and Testing

LIP-IS-904

Security Maintenance Requests

SY-101-122-102

Performance of Early Warning Detection System Tests

SY-101-122-103

Performance of Access Control Device and Portal Tests

SY-AA-101-122

Testing Security Equipment

SY-AA-101-122-

101

Performance of Perimeter Intrusion Detector-Camera

SY-AA-101-122-

104

Performance of Special Purpose Detector, Communication

SY-AA-150-103

Firearms Maintenance, Testing and Accountability

SY-AA-150-103-

F-04

Rifle Material Condition Inspection/Functionality/Accuracy

Tests

71130.04

Procedures

SY-AA-150-103-

F-13

Range Firearm Inspection, Cleaning and Maintenance

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.09

Miscellaneous

LaSalle County Station Security Plan, Training and

Qualification Plan, Safeguard Contingency Plan and

Independent Spent Fuel Storage Installation Security Plan

Miscellaneous

Security Performance Indicator Data

09/01/2021 -

09/01/2022

SY-AA-101-155

Security Events and Nuclear Regulatory Commission

Performance Indicators

71151

Procedures

SY-AA-1024

Security Performance Monitoring, Oversight and Indicators

13