SUBJECT:
LASALLE COUNTY STATION - QUADRENNIAL FIRE PROTECTION TEAM INSPECTION REPORT 05000373/2023011 AND 05000374/2023011
Dear David P. Rhoades:
On June 8, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station and discussed the results of this inspection with John Van Fleet, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Caty E. Nolan, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000373 and 05000374 License Nos. NPF-11 and NPF-18
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000373 and 05000374
License Numbers:
Report Numbers:
05000373/2023011 and 05000374/2023011
Enterprise Identifier:
I-2023-011-0032
Licensee:
Constellation Nuclear
Facility:
LaSalle County Station
Location:
Marseilles, IL
Inspection Dates:
May 22, 2023 to June 08, 2023
Inspectors:
M. Abuhamdan, Reactor Inspector
B. Jose, Senior Reactor Inspector
L. Rodriguez, Senior Reactor Inspector
Approved By:
Caty E. Nolan, Chief
Engineering Branch 2
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quadrennial Fire Protection Team Inspection at LaSalle County Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
- (1) Unit 1 Emergency Diesel Generator (EDG)
- (2) Unit 1 Reactor Core Isolation Cooling (RCIC) System
- (3) Unit 1 Residual Heat Removal (RHR) Pump A
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensured that the licensees FPP contains adequate procedures to implement the selected administrative control. Verified that the selected administrative control meets the requirements of all committed industry standards.
- (1) Hot Work Control Program
- (2) Fire Impairments Program
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors verified the following:
a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.
b. The adequacy of the design modification, if applicable.
c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.
- (1) LF2020-005; Change to Fire Protection Report (FPR) for Frequency Extensions Evaluated in Support of Engineering Change (EC) 6333244
- (2) LF2021-001; Revise FPR, LaSalle National Fire Protection Association (NFPA) Code Deviation Summary Matrix
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On June 8, 2023, the inspectors presented the Quadrennial Fire Protection Team Inspection results to John Van Fleet, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Fire Protection Hydraulic Model
0A
Calculations
VX-09
Battery Rooms Hydrogen Concentration
01/04/2011
04423187
B.5.b Pump #1 Degraded Flow
05/12/2021
04437330
U1 Diesel Generator Corridor Cable Tray Sprinkler
Compressor Not Running
07/27/2021
04357945
Multiple Spurious Fire Panel Trouble Alarms
07/21/2020
04444667
0FP21 Could Not Maintain Water Pressure
09/04/2021
04477360
Multiple Issues on A Diesel Fire Pump 0FP01 KA
2/10/2022
04527227
Fire Protection (FP) Valves to Exceed 7 Day Technical
Requirements Condition for Technical Requirements
Manual (TRM) 3.7.J RA B.1 or B.2
10/06/2022
Corrective Action
Documents
04548783
FP Self Assessment Review of Completed Fire Protection
Permits
01/17/2023
04680111
NRC Identified 1FP173 Packing Leak
05/23/2023
04680588
NRC Identified Oil Leak
05/25/2023
04680654
NRC Identified - Documentation Gaps in Electrical
Maintenance Work Package
05/25/2023
04681346
NRC Identified - Piping Design Data Table Needs
Updating
05/30/2023
04682307
Procedure Enhancement Opportunity - NRC Identified
06/02/2023
04682738
23 NRC FP Audit - Enhancement to Fire Protection
Report (FPR) Section H.4.2.9.1
06/05/2023
04683058
Gap in Communication to Fire Brigade - NRC Identified
06/06/2023
04683200
23 NRC FP Audit - LOA-FX-101(201) Procedure
Change Request Action
06/07/2023
Corrective Action
Documents
Resulting from
Inspection
04683218
23 NRC FP Audit - Hose Reel Removal Engineering
Change (EC) New Fuel Area
06/07/2023
Schematic Diagram Remote Shutdown System "RS"
M
Schematic Diagram Remote Shutdown System "RS"
(C61)
J
Drawings
M-71FD
Flow Diagram for Fire Protection System
G
71111.21N.05
Engineering
633168
86-10 Evaluation Supporting Removal of Fire Hoses from
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Hose Station
Changes
633169
Implement Fire Hose Removal Strategy
Engineering
Evaluations
Multiple Spurious Operations (MSO) Scenario Analysis
and 0A
Fire Plans
FZ 2I4
Reactor Building. 673'-4" Elevation U1 Low Pressure Core
Spray (LPCS)/Reactor Core Isolation Cooling (RCIC)
Pump Cubicle
0-22-162-TRM
Fire Protection Impairment - Isolation of Fire Protection
Line 0FPA7A-10"
2/07/2022
FBP07
Emergency Response Training Fire Brigade Program -
Hose Streams, Appliances, and Tools
Miscellaneous
LES-FP-05
1A
for Zone 1-31
Test Group 1A Fire Detector Test Data Sheet for
Zone 1-31
03/23/2023
High Risk Fire Area Identification
LEP-GM-173
General Electric Magne-Blast Switchgear Preventive
Maintenance
LMS-FP-15
Technical Requirements Manual Fire Hose Stations
Inspection
LOA-FX-101
Unit 1 Safe Shutdown with a Fire in the Control Room or
Auxiliary Electrical Equipment Room
LOP-FP-01
Fire Protection System Filling, Venting, Start-Up,
Operation and Draining
LOP-RX-04
Startup and Operation of RCIC from the Remote
Shutdown Panel
LOS-FP-M7
Fire Brigade Equipment Availability Check
Procedures
Fire Protection System Impairment Control
01796898-01
LOS-RX-SR1 U1 RCIC All Modes
09/21/2017
04627572
Technical Requirement Yard Loop Flow Test
08/16/2019
04952598
Technical Requirement Yard Loop Flow Test
09/04/2021
04974885-01
Fire Hose Station Inspection Rerack and Gasket
Inspection
07/29/2021
Work Orders
224548-03
Perform Unit 1 Fire Zone Functional Test
LES-FP-05 Att. 1A
03/23/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
274985-01
Perform LES-DC-106-2E Quarterly Emergency Light
Inspection
10/25/2022
05325849-01
Perform LES-DC-106-2B Quarterly Emergency Light
Inspection
04/27/2023
05331499-01
Perform LES-DC-106-2E, Quarterly Emergency Light
Inspection
03/21/2023