IR 05000373/2023011

From kanterella
Jump to navigation Jump to search
County Station - Quadrennial Fire Protection Team Inspection Report 05000373/2023011 and 05000374/2023011
ML23174A177
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/26/2023
From: Catherine Nolan
NRC/RGN-III/DORS/EB2
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023011
Download: ML23174A177 (1)


Text

SUBJECT:

LASALLE COUNTY STATION - QUADRENNIAL FIRE PROTECTION TEAM INSPECTION REPORT 05000373/2023011 AND 05000374/2023011

Dear David P. Rhoades:

On June 8, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station and discussed the results of this inspection with John Van Fleet, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Caty E. Nolan, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000373 and 05000374 License Nos. NPF-11 and NPF-18

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000373 and 05000374

License Numbers:

NPF-11 and NPF-18

Report Numbers:

05000373/2023011 and 05000374/2023011

Enterprise Identifier:

I-2023-011-0032

Licensee:

Constellation Nuclear

Facility:

LaSalle County Station

Location:

Marseilles, IL

Inspection Dates:

May 22, 2023 to June 08, 2023

Inspectors:

M. Abuhamdan, Reactor Inspector

B. Jose, Senior Reactor Inspector

L. Rodriguez, Senior Reactor Inspector

Approved By:

Caty E. Nolan, Chief

Engineering Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quadrennial Fire Protection Team Inspection at LaSalle County Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Unit 1 Emergency Diesel Generator (EDG)
(2) Unit 1 Reactor Core Isolation Cooling (RCIC) System
(3) Unit 1 Residual Heat Removal (RHR) Pump A

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensured that the licensees FPP contains adequate procedures to implement the selected administrative control. Verified that the selected administrative control meets the requirements of all committed industry standards.

(1) Hot Work Control Program
(2) Fire Impairments Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) LF2020-005; Change to Fire Protection Report (FPR) for Frequency Extensions Evaluated in Support of Engineering Change (EC) 6333244
(2) LF2021-001; Revise FPR, LaSalle National Fire Protection Association (NFPA) Code Deviation Summary Matrix

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 8, 2023, the inspectors presented the Quadrennial Fire Protection Team Inspection results to John Van Fleet, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

L-002808

Fire Protection Hydraulic Model

0A

Calculations

VX-09

Battery Rooms Hydrogen Concentration

01/04/2011

04423187

B.5.b Pump #1 Degraded Flow

05/12/2021

04437330

U1 Diesel Generator Corridor Cable Tray Sprinkler

Compressor Not Running

07/27/2021

04357945

Multiple Spurious Fire Panel Trouble Alarms

07/21/2020

04444667

0FP21 Could Not Maintain Water Pressure

09/04/2021

04477360

Multiple Issues on A Diesel Fire Pump 0FP01 KA

2/10/2022

04527227

Fire Protection (FP) Valves to Exceed 7 Day Technical

Requirements Condition for Technical Requirements

Manual (TRM) 3.7.J RA B.1 or B.2

10/06/2022

Corrective Action

Documents

04548783

FP Self Assessment Review of Completed Fire Protection

Permits

01/17/2023

04680111

NRC Identified 1FP173 Packing Leak

05/23/2023

04680588

NRC Identified Oil Leak

05/25/2023

04680654

NRC Identified - Documentation Gaps in Electrical

Maintenance Work Package

05/25/2023

04681346

NRC Identified - Piping Design Data Table Needs

Updating

05/30/2023

04682307

Procedure Enhancement Opportunity - NRC Identified

06/02/2023

04682738

23 NRC FP Audit - Enhancement to Fire Protection

Report (FPR) Section H.4.2.9.1

06/05/2023

04683058

Gap in Communication to Fire Brigade - NRC Identified

06/06/2023

04683200

23 NRC FP Audit - LOA-FX-101(201) Procedure

Change Request Action

06/07/2023

Corrective Action

Documents

Resulting from

Inspection

04683218

23 NRC FP Audit - Hose Reel Removal Engineering

Change (EC) New Fuel Area

06/07/2023

1E-1-4214AA

Schematic Diagram Remote Shutdown System "RS"

M

1E-2-4214AA

Schematic Diagram Remote Shutdown System "RS"

(C61)

J

Drawings

M-71FD

Flow Diagram for Fire Protection System

G

71111.21N.05

Engineering

633168

86-10 Evaluation Supporting Removal of Fire Hoses from

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Hose Station

Changes

633169

Implement Fire Hose Removal Strategy

Engineering

Evaluations

L-003779

Multiple Spurious Operations (MSO) Scenario Analysis

and 0A

Fire Plans

FZ 2I4

Reactor Building. 673'-4" Elevation U1 Low Pressure Core

Spray (LPCS)/Reactor Core Isolation Cooling (RCIC)

Pump Cubicle

0-22-162-TRM

Fire Protection Impairment - Isolation of Fire Protection

Line 0FPA7A-10"

2/07/2022

FBP07

Emergency Response Training Fire Brigade Program -

Hose Streams, Appliances, and Tools

Miscellaneous

LES-FP-05

1A

for Zone 1-31

Test Group 1A Fire Detector Test Data Sheet for

Zone 1-31

03/23/2023

ER-AA-600-1069

High Risk Fire Area Identification

LEP-GM-173

General Electric Magne-Blast Switchgear Preventive

Maintenance

LMS-FP-15

Technical Requirements Manual Fire Hose Stations

Inspection

LOA-FX-101

Unit 1 Safe Shutdown with a Fire in the Control Room or

Auxiliary Electrical Equipment Room

LOP-FP-01

Fire Protection System Filling, Venting, Start-Up,

Operation and Draining

LOP-RX-04

Startup and Operation of RCIC from the Remote

Shutdown Panel

LOS-FP-M7

Fire Brigade Equipment Availability Check

Procedures

OP-AA-201-007

Fire Protection System Impairment Control

01796898-01

LOS-RX-SR1 U1 RCIC All Modes

09/21/2017

04627572

Technical Requirement Yard Loop Flow Test

08/16/2019

04952598

Technical Requirement Yard Loop Flow Test

09/04/2021

04974885-01

Fire Hose Station Inspection Rerack and Gasket

Inspection

07/29/2021

Work Orders

224548-03

Perform Unit 1 Fire Zone Functional Test

LES-FP-05 Att. 1A

03/23/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

274985-01

Perform LES-DC-106-2E Quarterly Emergency Light

Inspection

10/25/2022

05325849-01

Perform LES-DC-106-2B Quarterly Emergency Light

Inspection

04/27/2023

05331499-01

Perform LES-DC-106-2E, Quarterly Emergency Light

Inspection

03/21/2023