June 26, 2023

SUBJECT:

LASALLE COUNTY STATION - QUADRENNIAL FIRE PROTECTION TEAM INSPECTION REPORT 05000373/2023011 AND 05000374/2023011

Dear David P. Rhoades:

On June 8, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station and discussed the results of this inspection with John Van Fleet, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Nolan, Catherine on 06/26/23 Caty E. Nolan, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000373 and 05000374 License Nos. NPF-11 and NPF-18

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000373 and 05000374 License Numbers: NPF-11 and NPF-18 Report Numbers: 05000373/2023011 and 05000374/2023011 Enterprise Identifier: I-2023-011-0032 Licensee: Constellation Nuclear Facility: LaSalle County Station Location: Marseilles, IL Inspection Dates: May 22, 2023 to June 08, 2023 Inspectors: M. Abuhamdan, Reactor Inspector B. Jose, Senior Reactor Inspector L. Rodriguez, Senior Reactor Inspector Approved By: Caty E. Nolan, Chief Engineering Branch 2 Division of Operating Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quadrennial Fire Protection Team Inspection at LaSalle County Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Unit 1 Emergency Diesel Generator (EDG)
(2) Unit 1 Reactor Core Isolation Cooling (RCIC) System
(3) Unit 1 Residual Heat Removal (RHR) Pump A

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensured that the licensees FPP contains adequate procedures to implement the selected administrative control. Verified that the selected administrative control meets the requirements of all committed industry standards.

(1) Hot Work Control Program
(2) Fire Impairments Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) LF2020-005; Change to Fire Protection Report (FPR) for Frequency Extensions Evaluated in Support of Engineering Change (EC) 6333244
(2) LF2021-001; Revise FPR, LaSalle National Fire Protection Association (NFPA) Code Deviation Summary Matrix

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 8, 2023, the inspectors presented the Quadrennial Fire Protection Team Inspection results to John Van Fleet, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.05 Calculations L-002808 Fire Protection Hydraulic Model 0A

VX-09 Battery Rooms Hydrogen Concentration 01/04/2011

Corrective Action 04423187 B.5.b Pump #1 Degraded Flow 05/12/2021

Documents 04437330 U1 Diesel Generator Corridor Cable Tray Sprinkler 07/27/2021

Compressor Not Running

04357945 Multiple Spurious Fire Panel Trouble Alarms 07/21/2020

04444667 0FP21 Could Not Maintain Water Pressure 09/04/2021

04477360 Multiple Issues on A Diesel Fire Pump 0FP01 KA 02/10/2022

04527227 Fire Protection (FP) Valves to Exceed 7 Day Technical 10/06/2022

Requirements Condition for Technical Requirements

Manual (TRM) 3.7.J RA B.1 or B.2

04548783 FP Self Assessment Review of Completed Fire Protection 01/17/2023

Permits

Corrective Action 04680111 NRC Identified 1FP173 Packing Leak 05/23/2023

Documents 04680588 NRC Identified Oil Leak 05/25/2023

Resulting from 04680654 NRC Identified - Documentation Gaps in Electrical 05/25/2023

Inspection Maintenance Work Package

04681346 NRC Identified - Piping Design Data Table Needs 05/30/2023

Updating

04682307 Procedure Enhancement Opportunity - NRC Identified 06/02/2023

04682738 2023 NRC FP Audit - Enhancement to Fire Protection 06/05/2023

Report (FPR) Section H.4.2.9.1

04683058 Gap in Communication to Fire Brigade - NRC Identified 06/06/2023

04683200 2023 NRC FP Audit - LOA-FX-101(201) Procedure 06/07/2023

Change Request Action

04683218 2023 NRC FP Audit - Hose Reel Removal Engineering 06/07/2023

Change (EC) New Fuel Area

Drawings 1E-1-4214AA Schematic Diagram Remote Shutdown System "RS" M

1E-2-4214AA Schematic Diagram Remote Shutdown System "RS" J

(C61)

M-71FD Flow Diagram for Fire Protection System G

Engineering 633168 86-10 Evaluation Supporting Removal of Fire Hoses from 0

Inspection Type Designation Description or Title Revision or

Procedure Date

Changes Hose Station

633169 Implement Fire Hose Removal Strategy 0

Engineering L-003779 Multiple Spurious Operations (MSO) Scenario Analysis 0 and 0A

Evaluations

Fire Plans FZ 2I4 Reactor Building. 673'-4" Elevation U1 Low Pressure Core 3

Spray (LPCS)/Reactor Core Isolation Cooling (RCIC)

Pump Cubicle

Miscellaneous 0-22-162-TRM Fire Protection Impairment - Isolation of Fire Protection 12/07/2022

Line 0FPA7A-10"

FBP07 Emergency Response Training Fire Brigade Program - 10

Hose Streams, Appliances, and Tools

LES-FP-05 Test Group 1A Fire Detector Test Data Sheet for 03/23/2023

1A Zone 1-31

for Zone 1-31

Procedures ER-AA-600-1069 High Risk Fire Area Identification 4

LEP-GM-173 General Electric Magne-Blast Switchgear Preventive 10

Maintenance

LMS-FP-15 Technical Requirements Manual Fire Hose Stations 26

Inspection

LOA-FX-101 Unit 1 Safe Shutdown with a Fire in the Control Room or 32

Auxiliary Electrical Equipment Room

LOP-FP-01 Fire Protection System Filling, Venting, Start-Up, 25

Operation and Draining

LOP-RX-04 Startup and Operation of RCIC from the Remote 15

Shutdown Panel

LOS-FP-M7 Fire Brigade Equipment Availability Check 4

OP-AA-201-007 Fire Protection System Impairment Control 2

Work Orders 01796898-01 LOS-RX-SR1 U1 RCIC All Modes 09/21/2017

04627572 Technical Requirement Yard Loop Flow Test 08/16/2019

04952598 Technical Requirement Yard Loop Flow Test 09/04/2021

04974885-01 Fire Hose Station Inspection Rerack and Gasket 07/29/2021

Inspection

224548-03 Perform Unit 1 Fire Zone Functional Test 03/23/2023

LES-FP-05 Att. 1A

Inspection Type Designation Description or Title Revision or

Procedure Date

274985-01 Perform LES-DC-106-2E Quarterly Emergency Light 10/25/2022

Inspection

05325849-01 Perform LES-DC-106-2B Quarterly Emergency Light 04/27/2023

Inspection

05331499-01 Perform LES-DC-106-2E, Quarterly Emergency Light 03/21/2023

Inspection

7