County Station License Renewal Phase 2 Report 05000373/2022010
ML22073A100
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 03/15/2022
From: Michael Ziolkowski
NRC/RGN-III/DRS/EB1
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2022010
Download: ML22073A100 (20)


Text

SUBJECT:

LASALLE COUNTY STATION - LICENSE RENEWAL PHASE 2 REPORT 05000373/2022010

Dear Mr. Rhoades:

On February 22, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station and discussed the results of this inspection with Mr. P. Hansett, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Acting Chief Engineering Branch 1 Division of Reactor Safety Docket No. 05000373 License No. NPF-11

Enclosure:

As stated

Inspection Report

Docket Number:

05000373

License Number:

NPF-11

Report Number:

05000373/2022010

Enterprise Identifier:

I-2022-010-0024

Licensee:

Constellation Nuclear

Facility:

LaSalle County Station

Location:

Marseilles, IL

Inspection Dates:

January 10, 2022 to February 22, 2022

Inspectors:

J. Bozga, Senior Reactor Inspector

M. Domke, Reactor Inspector

E. Fernandez, Reactor Inspector

I. Hafeez, Reactor Inspector

E. Magnuson, Reactor Inspector

G. O'Dwyer, Reactor Engineer

J. Park, Reactor Inspector

R. Trelka, Reactor Inspector

Approved By:

Michael E. Ziolkowski, Acting Chief

Engineering Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a License Renewal Phase 2 at LaSalle County Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

On February 1, 2022, the operating license for LaSalle County Station held by Exelon Generation Company, LLC was transferred to Constellation Energy Generation, LLC (Constellation) as documented in the associated license amendments (ML22021B660). While some or all of the inspection documented in this report was performed while the license was held by Exelon Generation Company, LLC, this report will refer to the licensee as Constellation throughout.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===71003 - Post-Approval Site Inspection for License Renewal From January 10, 2022 to February 22, 2022, the NRC continued monitoring LaSalle performance by conducting a Post-Approval Site Inspection for License Renewal - Phase II in accordance with the License Renewal Inspection Program (LRIP). This inspection took place prior to the Period of Extended Operation (PEO) for Unit 1, which will begin on April 17, 2022, respectively. Per Inspection Manual Chapter 2516, the LRIP is the process used by NRC staff to verify the adequacy of Aging Management Programs (AMPs), Time Limited Aging Analyses (TLAAs), and other activities associated with an applicants request to renew an operating license of a commercial nuclear power plant beyond the initial licensing period under Title 10 of the Code of Federal Regulations (CFR), Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants.

Post-Approval Site Inspection for License Renewal===

(1) Post-Approval Site Inspection for License Renewal
(1) License Conditions and Commitments for License Renewal, Implementation of AMPs and TLAAs.

There are a total of 46 regulatory commitments and one TLAA linked to the renewed operating license for LaSalle Nuclear Power Station Units 1 and 2. The inspectors reviewed a majority (greater than 70 percent) of regulatory commitments and associated AMPs and TLAAs in order to assess the adequacy and effectiveness of the license renewal program. For each item selected in the sample, the inspectors also reviewed the applicable license renewal program documents, conducted interviews with licensee staff, and performed system walkdowns to verify that the licensee completed the actions necessary to comply with the conditions listed in the renewed facility operating license. For those license renewal action items that were not completed at the time of this inspection, the inspectors verified, when possible, that there was reasonable assurance that such action items were on track for completion prior to the PEO or in accordance with an established implementation schedule consistent with the License Renewal Application (LRA), the NRC Safety Evaluation Report (SER), and the Updated Final Safety Analysis Report (UFSAR)supplement.

The regulatory commitments selected for the inspection sample are listed below along with the completion status of the item at the time of the inspection. The full description of each commitment is available in the UFSAR supplement for license renewal, as revised, and Appendix A of the NRC SER issued as NUREG-2205 (ML16271A039).

  • Commitment Item 1: Implementation of American Society of Mechanical Engineers (ASME)Section XI Inservice Inspection, Subsections IWB, IWC, and IWD Program. Status: Complete.
  • Commitment Item 2: Implementation of Water Chemistry Program. Status:

Complete.

  • Commitment Item 3: Implementation of Reactor Head Closure Stud Bolting Program. Status: Complete.
  • Commitment Item 4: Implementation of Boiling Water Reactor (BWR) Vessel ID Welds Program. Status: Complete.
  • Commitment Item 5: Implementation of BWR Feedwater Nozzle Program.

Status: Complete.

  • Commitment Item 6: Implementation of BWR Control Rod Drive Return Line Nozzle Program. Status: Complete.

Complete.

  • Commitment Item 9: Implementation of, and enhancements to, the BWR Vessel Internals Program. Status: Complete.

Status: Complete.

  • Commitment Item 11: Implementation of, and enhancements to, the Bolting Integrity Program. Status: Complete.
  • Commitment Item 12: Implementation of, and enhancements to, the Open-Cycle Cooling Water System Program. Status: Incomplete. Inspection and testing activities designated to be completed prior to the PEO have been performed with the exception of several items scheduled during the last refueling outage prior to the PEO as stated in docketed letter RA21-050 from the LaSalle County Station, Unit 1 to the NRC, titled "Completion of License Renewal Activities Prior to Entering the Period of Extended Operation," dated November 9, 2021. Based on the review of the administrative controls in place to track the pending action, the inspectors determined that there was reasonable assurance that the licensee would complete the necessary action to meet Commitment Item 12.
  • Commitment Item 13: Implementation of, and enhancements to, the Closed Treated Water System Program. Status: Complete.
  • Commitment Item 14: Implementation of, and enhancements to, the Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Program. Status: Complete.
  • Commitment Item 15: Implementation of, and enhancements to, the Compressed Air Monitoring Program. Status: Complete.
  • Commitment Item 17: Implementation of, and enhancements to, the Fire Water Program. Status: Complete.
  • Commitment Item 18: Implementation of, and enhancements to, the Aboveground Metallic Tanks Program. Status: Complete.
  • Commitment Item 19: Implementation of, and enhancements to, the Fuel Oil Chemistry Program. Status: Complete.
  • Commitment Item 20: Implementation of, and enhancements to, the Reactor Vessel Surveillance Program. Status: Complete.
  • Commitment Item 21: Implementation of new One Time Inspection Program.

Status: Incomplete. Inspection and testing activities designated to be completed prior to the PEO have been performed with the exception of several items scheduled during the last refueling outage prior to the PEO as stated in docketed letter RA21-050 from the LaSalle County Station, Unit 1 to the NRC, titled "Completion of License Renewal Activities Prior to Entering the Period of Extended Operation," dated November 9, 2021. Based on the review of the administrative controls in place to track the pending action, the inspectors determined that there was reasonable assurance that the licensee would complete the necessary action to meet Commitment Item 21.

  • Commitment Item 22: Implementation of new Selective Leaching Inspection Program. Status: Incomplete. Inspection and testing activities designated to be completed prior to the PEO have been performed with the exception of an item scheduled during the last refueling outage prior to the PEO as stated in docketed letter RA21-050 from the LaSalle County Station, Unit 1 to the NRC, titled "Completion of License Renewal Activities Prior to Entering the Period of Extended Operation," dated November 9, 2021. Based on the review of the administrative controls in place to track the pending action, the inspectors determined that there was reasonable assurance that the licensee would complete the necessary action to meet Commitment Item 22.
  • Commitment Item 23: Implementation of new Unit 1 One-time Inspection of ASME Code Class 1 Small-Bore Piping Program. Status: Incomplete. Inspection and testing activities designated to be completed prior to the PEO have been performed with the exception of several items scheduled during the last refueling outage prior to the PEO as stated in docketed letter RA21-050 from the LaSalle County Station, Unit 1 to the NRC, titled "Completion of License Renewal Activities Prior to Entering the Period of Extended Operation," dated November 9, 2021. Based on the review of the administrative controls in place to track the pending action, the inspectors determined that there was reasonable assurance that the licensee would complete the necessary action to meet Commitment Item 23.
  • Commitment Item 24: Implementation of new External Surfaces Monitoring of Mechanical Components Program. Status: Complete.
  • Commitment Item 25: Implementation of new Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program. Status: Complete.
  • Commitment Item 26: Implementation of Lubricating Oil Analysis Program.

Status: Complete.

  • Commitment Item 27: Implementation of, and enhancements to, the Monitoring of Neutron-Absorbing Materials Other than Boraflex Program. Status: Complete.
  • Commitment Item 28: Implementation of, and enhancements to, the Buried and Underground Program. Status: Complete.
  • Commitment Item 29: Implementation of, and enhancements to, the ASME Section XI, Subsection IWE Program. Status: Complete.
  • Commitment Item 30: Implementation of, and enhancements to, the ASME Section XI, Subsection IWL Program. Status: Complete.
  • Commitment Item 31: Implementation of, and enhancements to, the ASME Section XI, Subsection IWF Program. Status: Complete.

Status: Complete.

  • Commitment Item 33: Implementation of, and enhancements to, the Masonry Walls Program. Status: Complete.
  • Commitment Item 34: Implementation of, and enhancements to, the Structures Monitoring Program. Status: Complete.
  • Commitment Item 35: Implementation of, and enhancements to, the RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants Program. Status: Complete.
  • Commitment Item 36: Implementation of Protective Coating Monitoring and Maintenance Program. Status: Complete.
  • Commitment Item 37: Implementation of new Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program. Status: Incomplete. Inspection and testing activities designated to be completed prior to the PEO have been performed with the exception of several items scheduled during the last refueling outage prior to the PEO as stated in docketed letter RA21-050 from the LaSalle County Station, Unit 1 to the NRC, titled "Completion of License Renewal Activities Prior to Entering the Period of Extended Operation," dated November 9, 2021. Based on the review of the administrative controls in place to track the pending action, the inspectors determined that there was reasonable assurance that the licensee would complete the necessary action to meet Commitment Item 37.
  • Commitment Item 38: Implementation of new Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits Program. Status:

Complete.

  • Commitment Item 39: Implementation of new Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program.

Status: Complete.

  • Commitment Item 40: Implementation of, and enhancements to, the Metal Enclosed Bus Program. Status: Complete.
  • Commitment Item 41: Implementation of new Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program.

Status: Complete.

  • Commitment Item 42: Implementation of new Service Level III and Service Level III Augmented Coatings Monitoring and Maintenance Program. Status:

Incomplete. Inspection and testing activities designated to be completed prior to the PEO have been performed with the exception of several items scheduled during the last refueling outage prior to the PEO as stated in docketed letter RA21-050 from the LaSalle County Station, Unit 1 to the NRC, titled "Completion of License Renewal Activities Prior to Entering the Period of Extended Operation,"

dated November 9, 2021. Based on the review of the administrative controls in place to track the pending action, the inspectors determined that there was reasonable assurance that the licensee would complete the necessary action to meet Commitment Item 42.

  • Commitment Item 43: Implementation of, and enhancements to, the Fatigue Monitoring Program. Status: Complete.
  • Commitment Item 44: Implementation of, and enhancements to, the Concrete Containment Tendon Prestress Program. Status: Complete.
  • Commitment Item 45: Implementation of Environmental Qualification (EQ) of Electric Components Program. Status: Complete.
  • Commitment Item 46: Implementation of Operating Experience Program. Status:

Complete.

  • Commitment Item 47: Implementation of TLAA - Slip Joint Clamp. Status:

Complete.

(2) Review of Newly Identified Structures, Systems, and Components The inspectors discussed the identification of newly identified Structures, System, and Components (SSCs) under the purview of 10 CFR 54.37(b) with the licensee staff. The NRC SER issued as NUREG-2205 stated, in part, "as part of the periodic UFSAR update in accordance with 10 CFR 54.37(b), their site engineering will determine whether there are any newly identified SSCs that require aging management." No newly identified SSCs were documented in the UFSAR supplement for license renewal.
(3) Description of Aging Management Programs in the UFSAR Supplement As part of the review of implementation activities for the selected AMPs, the inspectors reviewed the corresponding UFSAR sections to verify that the program descriptions were consistent with the LRA and the corresponding section of the NRC SER. The inspectors reviewed a version of the UFSAR supplement for license renewal as follows:
  • The inspectors reviewed the latest revision of the UFSAR supplement for license renewal (Revision 23) to verify that the program attributes and inspection activities were consistent with the AMPs as originally approved by the NRC and subsequent revisions performed under the provisions of 10 CFR 50.59. The inspectors also verified that any changes caused by the inclusion of newly identified SSCs were included in the UFSAR supplement.
(4) Changes to license renewal commitments and the UFSAR supplement for license renewal As part of the review of license renewal commitments, AMPs, and TLAAs described in this report, the inspectors reviewed a sample of license renewal commitment change documents to verify the licensee followed the guidance in Nuclear Energy Institute (NEI) 99-04, Guidelines for Managing NRC Commitment Changes, for any change to the commitments, including their elimination. Except as identified in the Inspection Results section of the report, the inspectors verified that the licensee properly evaluated, reported, and approved where necessary, changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59, as required by the Renewed Operating License (Section 2.C.(46)).

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 22, 2022, the inspectors presented the License Renewal Phase 2 results to Mr. P. Hansett, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1603204-02-01

Annotate CY-AB-120-100

03/01/2017

1603204-02-02

Annotate CY-AB-120-110

03/01/2017

1603204-02-03

Annotate CY-AB-120-1100

03/01/2017

1603204-02-04

Annotate CY-AB-120-120

03/01/2017

1603204-02-05

Annotate CY-AB-120-130

03/01/2017

1603204-02-06

Annotate CY-AB-120-200

03/01/2017

1603204-02-07

Annotate CY-AB-120-300

03/01/2017

1603204-02-08

Annotate CY-AB-120-310

03/01/2017

1603204-02-09

Annotate CY-AB-120-320

03/01/2017

1603204-03-01

Annotate ER-AA-330

03/01/2017

1603204-03-02

Annotate ER-AA-330-001

03/01/2017

1603204-03-03

Annotate ER-AA-330-002

03/01/2017

1603204-03-04

Annotate ER-AA-330-009

03/01/2017

1603204-03-05

Revise MA-AB-756-601

03/01/2017

1603204-03-06

Annotate Passport Cat IDs, Head Studs, Washers, Nuts

03/01/2017

1603204-03-07

Revise Model WO's 908800-01 & 00861010-01

03/01/2017

1603204-06-01

Annotate ER-AA-330

03/01/2017

1603204-06-02

Annotate ER-AA-330-002

03/01/2017

1603204-07-02

Annotate ER-AA-330-002

03/01/2017

1603204-07-03

Annotate CC-AA-501-1017-Site Approval

05/01/2018

1603204-07-04

Annotate ER-AA-330-009

03/01/2017

1603204-08-01

Revise LTS-600-8

05/01/2018

1603204-08-02

Annotate ER-AA-330

03/01/2017

1603204-08-03

Annotate ER-AA-330-001

03/01/2017

1603204-08-04

Annotate ER-AA-330-002

03/01/2017

1603204-08-05

Site Approval of LR Annotation of ER-AB-331

05/01/2018

1603204-09-01

Site Approval of LR Annotation of ER-AB-331

05/01/2018

1603204-09-02

Site Approval of LR Annotation ER-AB-331-1001

05/01/2018

1603204-09-05

Submit an Inspection Plan

04/17/2020

1603204-10-01

Site Approval of LR ER-AA-430 Markup

08/17/2018

71003

Corrective Action

Documents

1603204-10-02

Site Approval of LR ER-AA-430-1001 Markup

08/09/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1603204-10-03

Site Approval of LR ER-AA-430-1004 Markup

08/09/2019

1603204-26-01

Annotate 54 Various Lube Oil Sampling Activities

03/01/2017

1603204-26-02

Annotate MA-AA-716-230

03/01/2017

1603204-26-03

Annotate MA-AA-716-006

03/01/2017

1603204-26-04

Site Approval of LR Annotate MA-AA-716-230-1001

05/01/2018

1603204-47-02

Revise LTS-1200-4

03/01/2017

2695121

AR for WR to Generate WOs for SL Inspection on PASS

Pipe

07/21/2016

4111682

1B RHR HX Partition Repairs Delayed Until L1R19

03/06/2018

4112360

Perform an Assessment for Unit 1 Internal Surfaces in

Miscellaneous Piping and Ducting Components

03/07/2018

277865

License Renewal (LR) Coating Inspection for 0DG01A HX

09/09/2019

298227

License Renewal (LR) Coating Inspection for 2DG01AHX

11/18/2019

4317117

L1R18; Component 1TD17B-Tee Low Wall Thickness

2/12/2020

4318084

LR Inspection Performed for 1A CRD Pump Gearbox Oil

Cooler

2/14/2020

4318109

L1R18 FAC; Component 1RH007 Low Wall Thickness

2/14/2020

4318110

L1R18 FAC; Component 1RH010_1 Low Wall Thickness

2/15/2020

4318123

License Renewal (LR) Coating Inspection for Drywell -

L1R18

2/15/2020

4318124

License Renewal (LR) Coating Inspection for Supp Chamber

2/15/2020

4318440

L1R18 1HG005B & 1HG006B LLRT Above Alarm Limit

04/19/2020

4318671

License Renewal - Degraded Coating on 1A VP Chiller

2/17/2020

4318699

1A VP Chiller Condenser Needs Re-Tubing

2/17/2020

4319048

L1R18 EPC; 1RH012 Low Wall Thickness

2/18/2020

4319055

L1R18 EPC: 1RH013 Low Wall Thickness

2/18/2020

4319410

L1R18 1B33-F020 LLRT Exceeds Warning Limit

2/19/2020

23449

License Renewal Buried Pipe Excavations

03/03/2020

4334088

LaSalle UFSAR Update for BWRVIP-25 Rev. 1

04/09/2020

4355477

NOS ID: Incorrect Acceptance Criteria Used for Two LLRTs

07/08/2020

4397242

2VP01CB North End Bell Coating Issue

01/21/2021

4412289

LR SL Inspection Point Change to1C CircWater Traveling

Screen

03/29/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

24360

LR Inspection for 1B IN Compressor

05/18/2021

26142

0WS31B-4" Below Minimum Wall Thickness During UT

Inspection

05/27/2021

4431031

WW LR Inspection Results - Pipe Nipple Corrosion

06/23/2021

4431106

LR UT Insp on 0WW30A-2 for OTI

06/03/2021

4431106

License Renewal UT Inspection on 0WW30A-2

06/23/2021

4431350

Request Revision to OPS Procedure LOR-1PM10J-B047

06/24/2021

4442418

New LR Selective Leaching Inspections

08/24/2021

4442554

New License Renewal Selective Leaching Inspections

08/25/2021

4452213

Extent of Condition for OTI AMP

10/11/2021

4452529

2A DG LR Inspection of Fuel Oil Storage Tank

10/12/2021

4455799

LR Diesel Fuel Oil Chemistry Inspection for 2B FOST

(2DO02T)

10/26/2021

4461916

SRV Tailpipe Inspections for OTI

11/18/2021

4471217

NRC LR Team Identified NF-LA-310-2000 Step 3.2.2 Should

be Labeled as a Commitment

01/11/2022

4471844

NRC ID ER-LA-450 Procedure Change Needed

01/14/2022

4471854

NRC ID LTS-1000-4 Procedure Change Needed

01/14/2022

4472490

Embedded Files Swapped in Bolting Integrity AMP ATs

01/18/2022

4473097

NRC ID Cracks in WS Tunnel Wall Identified

01/21/2022

4474112

NRC ID PM Frequency Adjustment

01/27/2022

Corrective Action

Documents

Resulting from

Inspection

4474425

NRC LR Inspection Questions

01/28/2022

Engineering

Changes

633528

LaSalle Unit 1 Core Plate Bolt BWRVIP-25 Appendix I

Evaluation, 006N3942

50.59 Screening

L21-88

UFSAR Appendix P Revision for BWR Vessel Internal LR

Commitment

08/20/2021

BWRVIP-25

BWR Vessel and Internals Project: BWR Core Plate

Inspection and Flaw Evaluation Guidelines

1A

LA-PBD-AMP-

XI.M1

ASME Section XI Inservice Inspection Subsections IWB,

IWC, and IWD

09/04/2015

LA-PBD-AMP-

XI.M3

Reactor Head Closure Stud Bolting

05/18/2016

Miscellaneous

LA-PBD-AMP-

BWR Vessel ID Attachment Welds

01/27/2016

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

XI.M4

LA-PBD-AMP-

XI.M5

BWR Feedwater Nozzle

01/25/2016

LA-PBD-AMP-

XI.M6

BWR Control Rod Drive Return Line Nozzle

2/11/2014

LA-PBD-AMP-

XI.M7

BWR Stress Corrosion Cracking

01/27/2016

LA-PBD-AMP-

XI.M8

BWR Penetrations

01/27/2016

LA-PBD-AMP-

XI.M9

BWR Vessel Internals

01/17/2016

License Renewal

Open Cycle

Cooling Water

Results Binder

AMP 12

Commitment 12 - Open Cycle Cooling Water LR Results

Binder

09/20/2021

License Renewal

Results Binder

AMP 3 - XI.M3 - Reactor Head Closure Stud Bolting (B.2.1.3)

License Renewal

Results Binder

AMP 4 - XI.M4 - BWR Vessel ID Attachment Welds (B.2.1.4)

License Renewal

Results Binder

AMP 6 - XI.M6 - BWR Control Rod Drive Return Line Nozzle

(B.2.1.6)

License Renewal

Results Binder

AMP 7 - XI.M7 - BWR Stress Corrosion Cracking (B.2.1.7)

License Renewal

Results Binder

AMP 8 - XI.M8 - BWR Penetrations (B.2.1.8)

License Renewal

Results Binder

AMP 9 - XI.M9 - BWR Vessel Internals (B.2.1.9)

License Renewal

Results Binder -

AMP 21

Commitment 21 One-Time Inspection Aging Management

Program LR Results Binder

2/07/2021

License Renewal

Results Binder -

AMP 22

Commitment 22 Selective Leaching LR Results Binder

2/13/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

License Renewal

Results Binder -

AMP 24

Commitment 24 External Surfaces Monitoring of Mechanical

Components Aging Management Program LR Results Binder

09/20/2021

License Renewal

Results Binder -

AMP 25

Commitment 25 Internal Surfaces in Miscellaneous Piping

and Ducting Components Aging Management Program LR

Results Binder

09/20/2021

License Renewal

Results Binder-

AMP 27

Commitment 27 Monitoring of Neutron-Absorbing Materials

Other than Boraflex Aging Management Program LR Results

Binder

10/13/2021

License Renewal

Results Binder -

AMP 28

Commitment 28 Buried and Underground Piping Aging

Management Program LR Results Binder

01/07/2022

License Renewal

Results Binder,

AMP 11 - XI.M18

Bolting Integrity (B.2.1.11)

License Renewal

Results Binder,

AMP 14 - XI.M23

Inspection of Overhead Heavy Load and Light Load (Related

to Refueling) Handling Systems (B.2.1.14)

License Renewal

Results Binder,

AMP 23 - XI.M35

Unit 1 One-time Inspection of ASME Code Class 1 Small-

Bore Piping (B.2.1.23)

License Renewal

Results Binder,

AMP 32 - XI.S4

CFR Part 50, Appendix J (B.2.1.32)

License Renewal

Results Binder,

AMP 33 - XI.S5

Masonry Walls (B.2.1.33)

License Renewal

Results Binder,

AMP 34 - XI.S6

Structures Monitoring (B.2.1.34)

License Renewal

Results Binder,

AMP 35 - XI.S7

RG 1.127, Inspection of Water-Control Structures Associated

with Nuclear Power Plants (B.2.1.35)

License Renewal

Concrete Containment Tendon Prestress (B.3.1.2)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Results Binder,

AMP 44 - X.S1

License Renewal

Results Binder -

AMP 1

Commitment 1 - XI.M1 - ASME Section XI Inservice

Inspection, Subsections IWB, IWC, and IWD (B.2.1.1)

NET-28064-008-

Rev 0

NET-28064-008-01 Rev 0 Inspection and Testing of Rio

Tinte BORALCAN and BORAL Surveillance Coupons from

LaSalle Nuclear Power Plant

NET-332-01

20120618 Inspection and Testing of Boral and Fast Start

Surveillance Coupons from LaSalle Units 1 and 2

PMC-21-132053

Lake Screen House Submerged Bolting AMP LR Inspections

2/07/2021

RA20-065

Letter from LaSalle County Station to NRC Entitled 2019

Regulatory Commitment Change Summary Report

2/17/2020

RA21-050 from

the LaSalle

County Station

Unit 1 to the NRC

Completion of License Renewal Activities Prior to Entering

the Period of Extended Operation

11/09/2021

RA21-059

Letter from LaSalle County Station to NRC Entitled 2020

Regulatory Commitment Change Summary Report

11/30/2021

L1R13-001

VT-2 Visual Inspections of the Control Line Drive Return Line

2/14/2010

L1R13-014

UT Inspections of Reactor Closure Bolt Studs 1-68

2/08/2010

L1R14-013

UT Inspections of Reactor Closure Bolt Studs 1-68

2/14/2012

NDE Reports

L1R15-022

UT Inspections of Reactor Closure Bolt Studs 1-68

2/11/2014

5184232

Work Planning Instructions U1 A Train VP Valve External

Surfaces Examination

01/14/2022

CC-AA-102

Design Input and Configuration Change Impact Screening

CC-AA-205

Control of Undocumented-Unqualified Coatings Inside

Containment

CC-AA-501-1017

Welding Filler Material Procurement

CY-AA-120-400

Closed Cooling Water Chemistry

CY-AA-120-4000

Closed Cooling Water Chemistry Strategic Plan

ER-AA-330

Conduct of Inservice Inspection Activities

ER-AA-330-001

Section XI Pressure Testing

Procedures

ER-AA-330-002

Inservice Inspection of Section XI Welds

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ER-AA-330-003

Inservice Inspection of Section XI Component Supports

ER-AA-330-005

Visual Examination of Section XI Class CC Concrete

Containment Structures

ER-AA-330-006

Inservice Inspection and Testing of the Pre-Stressed

Concrete Containment Post Tensioning Systems

ER-AA-330-007

Visual Examination of Section XI Class MC and Metallic

Liners of Class CC Components

ER-AA-330-008

Exelon Safety-Related (Service Level I) Protective Coatings

ER-AA-330-009

ASME Section XI Repair-Replacement Program

ER-AA-330-012

ASME Code Class 1 Small-Bore Piping Aging Management

Program

ER-AA-330-014

Exelon Safety-Related (Service Level III) Coatings

ER-AA-340

GL 89-13 Program Implementing Procedure

ER-AA-340-1001

GL 89-13 Program Implementation Instructional Guide

ER-AA-340-1002

Service Water Heat Exchanger Inspection Guide

ER-AA-380

Primary Containment Leakrate Testing Program

ER-AA-450

Structures Monitoring

ER-AA-470

Fatigue and Transient Monitoring Program

ER-AA-5400-

1001

Raw Water Corrosion Program Guide

ER-AA-5400-

1002

Underground Piping and Tank Examination Guide

ER-AA-700

License Renewal Implementation Program

ER-AA-700-301

License Renewal One-Time Inspection Program

ER-AA-700-401

Selective Leaching Aging Management

ER-AA-700-402

External Surfaces Monitoring of Mechanical Components

Aging Management Program

ER-AA-700-403

Inspection for Internal Surfaces in Piping and Ducting AMP

ER-AA-700-405

Compressed Air Monitoring Aging Management Program

ER-LA-450

LaSalle Structures Monitoring Program

ER-LA-450-1006

LaSalle Structures Monitoring Instructions

ER-LA-700-301-

101

LASALLE One-Time Inspection Requirements and

Guidelines

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ER-LA-700-401-

1001

Guidance for Performing Selective Leaching Inspections

ER-LA-700-402-

1001

External Surfaces Monitoring of Mechanical Components

Aging Management Program

LA-PBD-AMP-

XI.M26

Program Basis Document LA-PBD-AMP-XI.M26 Fire

Protection

LA-PBD-AMP-

XI.M5

BWR Feedwater Nozzle

01/25/2016

LAP-100-51

Inservice Inspection Program for Post-Tensioning Tendons

LAP-100-51

Inservice Inspection Program for Post-Tensioning Tendons

LEP-AP-201

Unit 2 Non-Segregated Phase Bus Duct Preventive

Maintenance Inspection

LMP-GM-25

Emergency Core Cooling System (ECCS) Service Water

Strainer Maintenance

LMP-RI-02

Reactor Core Isolation Cooling Turbine Maintenance

LMS-DG-01

Main Emergency Diesel Unit Surveillances

LMS-FP-19

Turbine Building Smoke and Heat Vents Visual Inspection

and Operational Check

LMS-HC-01A

Reactor Building and Turbine Building Crane Monthly and

Annual Preventive Maintenance and Examination

LMS-HC-01B

Floor Operated Overhead Crane Annual Preventive

Maintenance and Examination

LMS-HC-01C

Monorail Crane Annual Preventive Maintenance and

Examination

LMS-HC-01D

Jib Crane Annual Preventive Maintenance and Examination

LMS-ZZ-04

Water Tight Door Inspection

LOR-1PM10J-

B407

Fire Protection Intermediate Jockey Pump 0FP027P Running

LOS-PC-M3

Unit 1(2) Drywell Electrical Penetration Pressure and Cooling

Coil Temperature Check

LS8743R06-03

ISI Classification Basis Document

LS8743R06-04

ISI Program Plan Fourth Ten-Year Inspection Interval

LaSalle County Generating Station Units 1 & 2

LTP-300-9

Thermal Cycle Monitoring Program

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

LTS-100-43

RHR Loop A/B Valves Local Leak Rate Test 1(2)E12-

F017A/B, and 1(2)E12-F480A/B

LTS-1000-32

LaSalle Cooling Pond Major Dike Inspection

LTS-1000-4

CSCS Pond Surveillance

LTS-1200-4

Reactor Engineer's Core Monitoring Surveillance

LTS-600-19

Corbicula and Zebra Mussel Inspections

LTS-600-19

Corbicula and Zebra Mussel Inspections

LTS-600-23

CSCS Cooling Water Screen Bypass Supply Line and CW

Pump Inlet Bays Inspection

LTS-600-41

Primary Containment Inspections for ECCS Suction Strainer

Debris Sources

MA-AA-716-021

Rigging and Lifting Program

MA-AA-736-600

Torquing and Tightening of Bolted Connections

MA-AA-736-600

Torquing and Tightening of Bolted Connections

NF-LA-310-2000

Special Nuclear Material and Core Component Movement

PES-S-003

In Storage Maintenance of Nuclear Material

PES-S-003

In Storage Maintenance of Nuclear Material

PES-S-003

In-Storage Maintenance of Nuclear Material

PES-S-010

Fasteners

PI-AA-115

Operating Experience Program

RP-LA-826

Pneumatic / Air System Quality Surveillance

SA-AA-117

Excavation, Trenching, and Shoring

01787697

Perform Boral Coupons Removal and Shipment with L01-

Boralcoupwork

07/10/2015

04842059

LRA Perform Boral Coupons Removal and Shipment

06/25/2021

04842059

LRA Perform Boral Coupons Removal and Shipment

06/25/2021

05111806-02

0FP040 Valve Selective Leaching Inspection

06/23/2021

05148160-02

1FP136 Valve Selective Leaching Inspection

07/01/2021

05183009-02

0FP043 Valve Selective Leaching Inspection

09/29/2021

1585533

Vessel Inspection, Illinois Number U0187582 Chiller Unit

09/15/2015

1598701

EP (LR) 1CY01T: Perform NDE of Tank Floor

06/10/2020

1686546

0VC05CB Replace Compressor

07/18/2016

Work Orders

1794304

0VY03A Visual and Cleaning Air Side Cooling Coil

03/03/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1797698

MM 2A CRD PUMP SEAL COOLING LEAK 1 DPS

01/25/2017

1848881

1VY04A Visual and Cleaning of Air Side LPCS Rm Cooling

Coil

05/24/2018

1868192

Vessel Inspection, Illinois Number U0187582 Chiller Unit

2/27/2020

1883173

Exterior Containment Concrete Surface Inspection

09/02/2020

1890715-01

MM 1CW01PC, Inspect / Clean Circ Water Bay Per LTS-

600-23

2/19/2018

1891296-01

MM Inspection of South End of WS Tunnel for Corbicula and

Sediments

2/07/2017

1912182-01

MM 1CW01PB, Inspect / Clean Cir Water Bay

Per LTS-600-23

03/30/2017

28567

1/'4.GPM OUTBOARD SEAL LEAK FROM 1C11-C001B

06/13/2016

193261-01

Maintenance Rule Structures Monitoring Quarterly Walkdown

(Outage Walkdowns)

2/18/2020

193261-01

Maintenance Rule Structures Monitoring Quarterly Walkdown

(CY Tanks)

08/07/2020

193261-01

Maintenance Rule Structures Monitoring Quarterly Walkdown

(Lake Screen House)

10/13/2020

193261-01

Maintenance Rule Structures Monitoring Quarterly

Walkdowns (U1 Reactor Building Tendon Tunnel)

04/01/2020

193261-01

Maintenance Rule Structures Monitoring Quarterly

Walkdowns (U1 Diesel Generator Building)

10/18/2019

1933142-02

NDE Performed an Inspection of 0WW30A-2"

06/21/2021

1933979-02

License Renewal OneTime Inspections Work Planning

Instructions

01/14/2022

1938938

Model Work Order - Remove Selected Unit 1 RH Drywell

Spray Nozzles for LR Inspection for Loss of Material and

Flow Blockage Due to Corrosion of Upstream Piping

4397242

2VP01CB North End Bell Coating Issue

01/21/2021

25590-01

MM (LR) 1CW01PA, Inspect / Clean Circ Water Bay &

Bypass Line

04/12/2019

4633536

EC 402303 - 1VY03A Cooler Replacement - Install New

Cooler Coils

03/03/2018

4702757

B Upper End Welded Tendon Cover Visual Inspection

2/19/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4757662

LRA Inspect Unit 1 Primary Containment Drywell Coatings

2/14/2020

4807052-01

EWP U-1 Water Tight Door Inspection per LMS-ZZ-04,

ATT. A

2/02/2020

5149072

B Lower End of Vertical Tendons Inaccessible from Upper

End

2/30/2021

5184210

1E12-C300D External Surfaces Examination Work Planning

Instructions

01/14/2022

5184228

0A VC HVAC Pipe External Surfaces Examination Work

Planning Instructions

01/14/2022

5184232

Work Planning Instructions U1 A Train VP Valve External

Surfaces Examination

01/14/2022

5184254

Work Planning Instructions for 1DG001 Valve External

Surfaces Inspection for Item 24

01/14/2022

26374-01

EP Primary Containment Integrated Leak Rate Test (ILRT)

03/04/2008

73504-01

Annual Major Dike Inspection

09/02/2021