IR 05000373/2023402

From kanterella
Jump to navigation Jump to search
County Station - Security Baseline Inspection Report 05000373/2023402 and 05000374/2023402
ML23354A134
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/20/2023
From: Steven Orth
NRC/RGN-III/DRSS/SEPIR
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023402
Download: ML23354A134 (1)


Text

SUBJECT:

LASALLE COUNTY STATION - SECURITY BASELINE INSPECTION REPORT 05000373/2023402 AND 05000374/2023402

Dear David P. Rhoades:

On December 6, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station and discussed the results of this inspection with Cindy Wilson, Senior Manager of Site Security, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000373 and 05000374 License Nos. NPF-11 and NPF-18

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000373 and 05000374

License Numbers:

NPF-11 and NPF-18

Report Numbers:

05000373/2023402 and 05000374/2023402

Enterprise Identifier:

I-2023-402-0059

Licensee:

Constellation Nuclear

Facility:

LaSalle County Station

Location:

Marseilles, IL

Inspection Dates:

November 13, 2023 to December 06, 2023

Inspectors:

J. Gilliam, Senior Reactor Inspector

J. Meszaros, Resident Inspector

M. Ziolkowski, Sr. Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Security, Emergency Preparedness, and Incident

Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at LaSalle County Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program. The following elements were evaluated:

Review of Power Reactor Target Sets

(1) Requirements: 03.01a; 03.02 a-d; 03.03a; 03.04 a-b; 03.05a

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On December 6, 2023, the inspectors presented the security baseline inspection results to Cindy Wilson, Senior Manager of Site Security, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Resulting from

Inspection

AR 04724441

Security SA-LA-101-502 Enhancements

2/19/2023

Engineering

Evaluations

EC 384315

Target Set Critical Digital Asset Evaluation

71130.14

Miscellaneous

SY-LA-101-502

LaSalle Power Station Security Target Sets Analysis and

Development