Similar Documents at Salem |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18102B6681997-10-0101 October 1997 Rev 8 to Inservice Testing Manual for Pumps & Valves Program. ML18106A8291997-09-0404 September 1997 Rev 2 to Reactivity Manipulations Documentation Guide. Page to Training Manual NC.TQ-TP.ZZ-0302,encl ML18102A7941997-01-21021 January 1997 Event Classification Guide,Technical Basis, for Hope Creek Generating Station & Salem ML18102A7931997-01-21021 January 1997 Event Classification Guide,Technical Basis, Salem Generating Station ML18102A6661996-11-19019 November 1996 Rev 2 to Pse&G Simulation Facility Certification Program. ML20115B7791996-07-0303 July 1996 Final Draft, Hope Creek Event Classification Guide, Sections 1-9 ML18101B1141995-11-14014 November 1995 Revised Salem Generating Station Event Classification Guide, Including Rev 46 to Table of Contents,Rev 37 to Attachments Signature Page,Rev 26 to Attachment 6,Rev 25 to Attachment 7 & Rev 24 to Attachment 9 ML20091M9911995-10-15015 October 1995 Event Classification Guide HCGS, Including Revised Eals, Technical Basis Document & NUMARC EAL-to-Hope Creek Comparison Summary ML18101A6911995-05-31031 May 1995 Nbu Issue Mgt & Prioritized Action Plan, Dtd May 1995 ML18101A7711995-05-11011 May 1995 Rev 1A to Vol a of Salem Generating Station Unit 2 Second 10-Yr Insp Interval ISI Program Plan. ML20134K0831995-02-27027 February 1995 Pse&G/Nuclear Business Unit Organizational Effectiveness Assessment Plan, ML18101A6751995-02-16016 February 1995 Rev 11 to EOP 1-EOP-TRIP-1, Reactor Trip or Safety Injection. ML18101A6761995-02-16016 February 1995 Rev 12 to EOP 1-EOP-TRIP-2, Reactor Trip Response. ML18101A5381995-01-27027 January 1995 Revised Salem Generating Station Event Classification Guide. ML18101A2111994-08-17017 August 1994 Revised Salem Event Classification Guide. ML18101A6771994-07-11011 July 1994 Rev 10 to EOP 1-EOP-TRIP-3, Safety Injection Termination. ML20147B1601994-04-23023 April 1994 Rev 3 to S1.OP-SO.CW-0001(Z), Circulating Water Pump Operation ML18100A8081994-01-0707 January 1994 Rev 30 to Salem Generating Station Event Classification Guide. ML20147B1491993-11-0202 November 1993 Rev 2 to Procedure S1.OP-SO.CW-0001(Z), Circulating Water Pump Operation ML18100A4201993-06-15015 June 1993 Justification for Sgs Units 1 & 2 Restart & Operation Rod Control Sys Failures. ML18100A3771993-05-0505 May 1993 Rev 27 to Salem Generating Station Event Classification Guide. ML18100A3661993-04-27027 April 1993 Rev 8 to Section 18 to Event Classification Guide, Correcting Typo on Pages 3 & 5 of 6 ML20147B1171993-04-13013 April 1993 Rev 1 to Procedure NC.NA-AP.ZZ-0015(Q), Safety Tagging Program ML18096B3251993-02-26026 February 1993 Integrated Scheduling Program. ML18096B2911993-02-10010 February 1993 Revised Event Classification Guide,Including Rev 25 to Table of Contents,Rev 14 to Attachment 6,Rev 13 to Attachment 7, Rev 8 to Attachment 8,Rev 13 to Attachment 9,Rev 3 to Section 10,Rev 4 to Section 17 & Rev 7 to Section 18 ML20147B1021993-01-21021 January 1993 Rev 5 to Procedure NC.NA-AP.ZZ-0009(Q), Work Control Process ML20135B6521992-12-29029 December 1992 Rev 0 to Loss of Overhead Annunciator Sys ML20147B1371992-12-22022 December 1992 Rev to Procedure SC.RP-TI.ZZ-0209(Q), Release of Items from Rca ML20147B2051992-09-21021 September 1992 Rove Time Keeping Procedure ML18096A9601992-08-28028 August 1992 Electrical Distribution Sys Functional Insp (Edsfi) Methodology & Plan. ML18100A3151992-07-28028 July 1992 Rev 1 to Process Computer Maint & Mod Control Program. ML18096B3191992-07-17017 July 1992 Rev 8 to Salem Nuclear Generating Station Odcm. ML20147B1691992-05-0707 May 1992 Rev 1 to Procedure NC.NA-AP.ZZ-0013(Q), Control of Temporary Modifications ML18096A6791992-04-30030 April 1992 Vols A-D of Salem Generating Station Unit 2 Inservice Insp Program (Second Insp Interval) Long-Term Plan. ML18096A4421992-01-15015 January 1992 Rev 17 to Salem Generating Station Event Classification Guide ML18096A3211991-10-0404 October 1991 Rev 13 to Event Classification Guide,Including Table of Contents,Section Signature Pages,Spill/Discharge Notification Form & Related Pages ML18096A1431991-06-28028 June 1991 Rev 12 to Salem Generating Station Event Classification Guide. ML18095A9661991-05-30030 May 1991 Artificial Island Salem Event Classification Guide, Rev 11 ML18096A1191991-05-28028 May 1991 Rev 2 to NFU-0039, Salem Reactor Physics Methods. ML18095A9391991-05-16016 May 1991 Revised Replacement Pages to Facility Inservice Testing Program 1999-09-10
[Table view] |
Text
.. SERVICE ELECTRIC & GA.OMPANY DOCUMENT DISTRIBUTION NO -E PAGE 1 OF 1 TO: NRC *-WASHINGTON DOCUMENT CONTROL DESK WASHINGTON, DC 20555 TRANSMITTAL:
DOG 0028290 *0028290*
COPYHOLDER:
SECGOlOl DESCRIPTION:
LEC/019 EP PROC A. PLEASE INSERT THE FOLLOWING DOCUMENTS INTO YOUR CONTROLLED SUPERCEDED DOCUMENTS MUST BE SO MARKED AND PHYSICALLY REMOVED OR:;OESTROYED . . :f . . ..* CLASS DOCUMENT ID PROC ECG-ATT.04 PROC ECG-SECG-TOC 9803250427 980313 PDR ADOCK 05000272 F PDR / SHT/ VOL -------" INST REV STAT 002 A 009 A : TYPE ------SECG Hi. 001 SECG 1('. 001 THIS ACKNOWLEDGEMENT RECEIPT MUST BE RETURNED WITHIN 5 WORKING DAYS TO: PSE&G DMG/MC N04 PO BOX 236 HANCOCKS BRIDGE, NJ 08038 YOUR SIGNATURE BELOW VERIFIES THAT (1) THE ABOVE DOCUMENTS HAVE FILED AND SUPERSEDED DOCUMENTS HAVE BEEN REMOVED AND DESTROYED OR CLEARLY MARKED AS OBSOLETE (2) THE MAILING ADDRESS AND COPYHOLDER INFORMATION ARE CORRECT OR CORRECTIONS HAVE BEEN IDENTIFIED ON THIS TRANSMITTAL.
SEE MY INSTRUCTIONS ABOVE CHANGE COPYHOLDER INFORMATION REMOVE FROM DISTRIBUTION (DOCUMENTS MUST BE RETURNED)
D_?l}l'C:
- SALEM GENERATING STATION EVENT CLASSIFICATION GUIDE March 13, 1998 CHANGE PAGES FOR REVISION #9 The Table of Contents forms a general guide to the current revision of each section and attachment of the Salem ECG. The changes that are made in this TOC Revision #9 are shown below. 1. Check that your revision packet is complete.
- 2. Add the revised documents.
- 3. Remove and recycle the outdated material listed below. ADD REMOVE Pages Description Pages Description ALL TOC 9 ALL TOC 8 ALL Attachment 4 2 ALL Attachment 4 1 Salem-ECG 1 of 1
- SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE TITLE REV# ECG T.O.C. Pg. 1of4 PAGES/o'bATE T.O.C. '"{able of Contents/Signature Page 08 4 . 02/27/98 Introduction and Usage 00 j,Q/ 01/21/97 ii of Acronyms & Abbreviations 00 / 6 01/21/97 '\. 111 Status Trees (CFSTs), Unit 1 2v 6 02/27/98 Critical Status Trees (CFSTs), Unit 2 23 . 6 08/19/97 ' 1.0 Fuel Clad 00 1 01/21/97 2.0 RCS Challenge\
0-1 01/21/97 3.0 Fission Product (Table) 00 1 01/21/97 4.0 EC Discretion
\, 00 1 01/21/97 5.0 Failure to TRIP '\ 00 1 01/21/97 6.0 Radiological
'\., 6.1 Gaseous Effluent 00 4 01/21/97 6.2 Liquid Effluent Release, 00 1 01/21/97 6.3 In Plant Radiation Occu'fr.e ces 00 1 01/21/97 Irradiated Fuel Event \ 6.4 \, 00 2 01/21/97 7.0 \, Electrical Power \ 7 .1 Loss of AC Powe Capabilities 00 2 01/21/97 7.2 Loss of DC Po er Capabilities
\" 00 1 01/21/97 8.0 System Malfunctioni
\ 8.1 Loss ofH at Removal Capability 2 01/21/97 8.2 Annunciators 00 1 01/21/97 8.3 Loss f Communications Capability 0 1 01/21/97 8.4 Con rol Room Evacuation 00 1 01/21/97 8.5 Tefchnical Specifications 00 1 01/21/97 9.0 Hazards Internal/External
9.1 Security
Threats 00 01/21/97 9.2 Fire 00 1 01/21/97 9.3 Explosion 00 " 01/21/97 9.4 Toxic/Flammable Gases 00 2 9, Seismic Event 00 1 01/21/97 I. High Winds 00 1 o'i/2-1191 6*6 I .7 Flooding 00 1 01121/97--
9.8 Turbine
Failure/Vehicle Crash/ 00 1 01/21/97 Missile Impact 9.9 River Level 00 1 01/21/97 PSE&G SGS CONTROL SEC& COPY # 01ol Rev. 08 I) l '
- Pg. 2of4 SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE SECTION TITLE REV# PAGES DATE 10.0 Reserved for future use NIA 11.0 Reportable Action Levels (RALs) 11.1 Technical Specifications 00 3 01/21/97 11.2 Design Basis/ Unanalyzed Condition 00 2 01/21/97 11.3 Engineered Safety Features (ESF) 01 1 08/28/97 11.4 Personnel Safety/Overexposure 00 2 01/21/97 11.5 Environmental 00 1 01/21/97 11.6 After-the-Fact 00 1 01/21/97 11.7 Security/Emergency Response 01 1 03/13/97 Capabilities 11.8 Public Interest 00 1 01/21/97 11.9 Accidental Criticality/
00 2 01/21/97 Special Nuclear Material/
Rad Material Shipments
-Releases 11.10 Voluntary Notifications 00 1 01/21/97
- WC Salem ECG Charts (Located In ERFs)
- Pg. 3of4 SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE ATTACHMENT TITLE REV# PAGES DATE 1 UNUSUAL EVENT 00 9 01/21/97 '* 2 ALERT 01 5 02/27/98 3 SITE AREA EMERGENCY 01 6 02/27/98 4 GENERAL EMERGENCY 01 8 02/27/98 5 NRC Data Sheet Completion Reference 00 7 01/21/97 6 Primary Communicator Log 04 9 12/04/97 7 Primary Communicator Log (GE) 04 8 12/04/97 8 Secondary Communicator Log 01 8 02/27/98 9 Non-Emergency Notifications Reference 05 3 01/22/98 IO 1 Hr Report -NRC Regional Office 00 3 01/21/97 11 1 Hr Report (Common Site) Security/Safeguards 00 3 01/21/97 12 1 Hr Report -NRC Operatio.ns 00 3 01/21/97 13 4 Hr Report -Contaminated Events Outside 00 7 01/21/97 OfTheRCA 14 4 Hr Report -NRC Operations 00 3 01/21/97 15 Environmental Protection Plan 01 3 03/13/97
- 16 Spill I Discharge Reporting 00 7 01/21/97 17 4 Hr Report -Fatality or Medical 00 4 01/21/97 Emergency 18 4 Hr Report -Radiological 01 4 05/12/97 Transportation Accident 19 24 Hr Report -Fitness For Duty (FFD) 01 3 05/12/97 Program Events 20 24 Hr Report -NRC Regional Office 00 3 01/21/97 21 Reportable Event -LAC/ Memorandum Of 00 2 01/21/97 Understanding (M.O.U.) 22 T /S Required Engineering Evaluation 00 2 01/21/97 23 Reserved 24 UNUSUAL EVENT (Common Site) 01 IO 05/12/97 25 1 Hr Report (Common Site) -00 3 01/21/97 Major Loss of Emergency Assessment, Offsite Response, OR Communications Capability
[' * ----------
.. '
- SIGNATURE PAGE Prepared By: l/C I .J. evisions Only, Last Approved Revi Section/ Attachments Revised: __ A lT-'--'-1 (List Non Editdrial Only -Section/Attachments)
Reviewed By: ____
VVstation Qualified Reviewer Reviewed By: _______
_______ _ ,
M{b°agef'-
CA, EP, & IT Reviewed By: _________
r-J--f--/
Manager -Quafity Assessment
-NBU (If Applicable)
SORC Review and Station Approvals ECG T.O.C. Pg. 4of4 d -/f?-'j'g Date 2-l/S-9f Date c?JM/tff Date DatJ Mtg. No. / Salem Chairman
- )c}6-9'f5 Date Effective Date of this Revision:
- ATTACHMENT 4 GENERAL EMERGENCY ECG ATT4 Pg. 1 of 8 EMERGENCY COORDINATOR (EC) LOG SHEET PSE&G CONTROLi COPY*# S. EECG 0101 A. DECLARE A GENERAL EMERGENCY AT HOPE CREEK EAL#(s) ______
________ _ Declared at hrs on --------------time date B. NOTIFICATIONS ( ) I. 2. ( ) ( ) ( ) ( ) 3. ( ) 4. ( ) 5 . CALL communicators to the Control Room. CAUTION A Protective Action Recommendation (PAR) SHALL be made on the Initial Contact Message Form (ICMF). MAKE AP AR by the following steps; a. REFER to Predetermined PAR Flowchart on Pg. 5 and CHOOSE the appropriate PAR. b. REFER to Recommended Protective Actions Worksheet on Pg. 6 to DETERMINE the compass designations for the downwind sectors affected.
- c. IF a Radiologically Based PAR is IMMEDIATELY available, THEN COMP ARE the two P ARs and choose the most appropriate for inclusion on the IC:MF. COMPLETE the INITIAL CONTACT MESSAGE FORM (IC:MF) (last page of this attachment).
PROVIDE the ICMF to the Communicator (CMl) and DIRECT the CMl to implement Attachment
- 7. DIRECT the Secondary Communicator (CM2) to implement Attachment 8 for a GENERAL EMERGENCY.
Rev. 01
' .
- IF NOT done previously, ECG ATT4 Pg. 2 of 8 NOTIFY the ITOC Operator on NETS x5027 (973-430-8153, 7190, 7191) with the following message: "This is (your name), Operations Superintendent at Salem. Please IMPLEMENT EPIP 204S, Salem Emergency Response Callout, immediately.
This procedure is being implemented for an Actual Emergency." ITOC Operator name Direct the OS (NETS 5121; DID 5200) to make the time (EP96-003)
General Emergency page Announcement per ECG Attachment 4, Appendix 2. NOTIFY the Hope Creek OS. (NETS 5224; DID 3027) a. PROVIDE a briefing on the GE conditions.
- b. DIRECT implementation ofEPIP 101H, Section 3.2. IF Security Related, THEN DIRECT the PSE&G Security Supervisor (x2222) to implement the Security Contingency Plan. C. EMERGENCY COORDINATOR DUTIES 1. 2. 3. IF NOT done previously, THEN DIRECT the OSC Coordinator to ACTIVATE the OSC IAW EPIP 202S, OSC Activation and Operations.
COMPLETE and APPROVE the NRC Data Sheet (Attachment
- 5) for transmittal by the CMl within 60 minutes. IF the Emergency Coordinator is the EDO or OS, THEN REFER TO EPIP 104S, General Emergency, AND IMPLEMENT emergency actions assigned to the EDO until relieved while continuing at Step C.5 . Rev. 01 I W I I I
- IF the Emergency Coordinator is the ERM, THEN continue to REFER to EPIP 401, ERM Response. ( ) a. Notify the EDO of General Emergency details;
- EAL exceeded (Basis) ECG ATT4 Pg. 3 of 8
- Direct the EDO to implement EPIP 104 H, General Emergency ( ) b. Notify EOF Staff of the change in classification.
WHEN provided by the CM2, THEN REVIEW and APPROVE the Station Status Checklist (SSCL) for transmittal. ( ) a. REPEAT this step approximately every half hour. ( ) b. PERFORM immediately for any significant change in emergency status. (operational or radiological)
D. TURNOVER ( ) 1. ( ) 2. WHEN turning over EC duties, THEN DIRECT your Communicators to turnover notifications responsibilities to the oncoming facility communicators.
IF relieved as EC prior to termination of the GE, THEN DOCUMENT the name of your relief below: Name time E. TERMINATION
- 1. 2. TERMINATE the GE IAW EPIP 106S, Emergency Termination/Reduction
/Recovery/Reentry.
ENSURE appropriate reports are made IAW Section II, Reporting, of this attachment.
Rev. 01 I I I ' .J
- ECG ATT4 Pg. 4 of 8 II. " REPORTING
- 1. This is a permanent document.
- 2. ATTACH appropriate documents to this form and EXPEDITE the package through all steps. 1. PREPARE an Action Request (AR). AR# 2. FORWARD this attachment and supporting documentation, to the Operations Manager (OM). 3. REVIEW this attachment, the (AR) and any other relevant information for correct classification of event and corrective action taken. 4 . CONT ACT the LER Coordinator (LERC) and request that the required reports be prepared.
Provide this attachment and any other supporting documentation to the LERC. 5. PREP ARE required reports. Report or LER Number 6. FORWARD this attachment to the Central Technical Document Room for microfilming.
Rev. 01 L I I l .;J * *
- APPENDIX 1 PREDETERMINED PROTECTIVE ACTION RECOMMENDATIONS ECG ATT4 Pg. 5 of 8 PAR REQUIRED FOR GENERAL EMERGENCY
- SGS GE BASED ON 10 POINTS ON BARRIER TABLE YES EVACUATE ALL SECTORS 0-5 MILES ? NO >----EVACUATE DOWNWIND+/-.
1SECTOR 5-10 MILES SHELTER ALL REMAINING SECTORS 5-10 MILES DEFAULT PAR (any other GE) CAUTION: 0-5 MILES IF TRAVEL CONDITIONS PRESENT AN EXTREME HAZARD (SEVERE ICE, SNOW, WIND, FLOOD, QUAKE DAMAGE, ETC. ), CONSIDER SHELTER INSTEAD OF EVACUATE IN THE ABOVE SELECTED PAR Rev. 01 l
RECOMMENDED PROTECTIVE ACTION WORKSHEET WIND DIRECTION FROM DEGREES COMP ASS 349-011 N 011-034 NNE 034 -056 NE 056 -079 ENE 079 -101 E 101 -124 ESE 124 -146 SE 146 -169 SSE 169 -191 s 191 -214 SSW 214 -236 SW 236 -259 WSW 259 -281 w 281-304 WNW 304 -326 NW 326 -349 NNW PAR AFFECTED SECTORS DOWNWIND + 1 SECTORS ::::::> SSE-S -SSW ::::::> S-SSW-SW ::::::> SSW-SW-WSW
- > SW-WSW-W ::::::> WSW-W-WNW
- > W-WNW-NW ::::::> WNW-NW-NNW
- > NW-NNW-N ::::::> NNW-N-NNE
- > N-NNE-NE ::::::> NNE-NE-ENE
- > NE-ENE-E ::::::> ENE-E-ESE
- > E-ESE-SE ::::::> ESE-SE-SSE ::::::> SE -SSE-S ECG ATT4 Pg. 6 of 8 NOTE: CONSIDER ADDING A SECTOR TO THE PAR IF THE WIND DIRECTION (FROM) IS WITHIN +/-3° OF A SECTOR DIVIDING LINE. 10 3490 MILES 0110 281° 191° 169° SGS Rev. 01 l ; l l * * *
- APPENDIX2 GENERAL EMERGENCY PAGE ANNOUNCEMENT SOUND the Radiation Alert Alarm ANNOUNCE over the page the following: "Attention all personnel, Attention all personnel" "Salem is in an General Emergency due to ECG ATT4 Pg. 7 of 8 " "All PSE&G personnel assemble at your accountability stations.
All contractors leave the Owner Controlled Area immediately" (REPEAT) Rev. 01 I ,1 l I f * * * *
- I. INITIAL CONTACT MESSAGE FORM ECG ATT4 Pg. 8 of 8 THIS IS , COMMUNICATOR IN THE D CONTROL ROOM ---------(NAME) 0 TS C DEOF AT THE SALEM NUCLEAR GENERATING STATION. Ila. D THIS IS NOTIFICATION OF A GENERAL EMERGENCY WHICH WAS DECLARED AT ON ---------(TI ME -24 HOUR CLOCK) (DATE) EAL #(s) ________________________
_ DESCRIPTION OF EVENT: -------------------
lib. 0 THIS IS NOTIFICATION OF A PROTECTIVE ACTION RECOMMENDATION UPGRADE WHICH WAS MADE AT HRS ON -------(24 HOUR CLOCK) (DATE) III. D D NO RADIOLOGICAL RELEASE IS IN PROGRESS.
THERE IS A RADIOLOGICAL RELEASE IN PROGRESS.
} see NOTE for release definition IV. 33 FT. LEVEL WIND DIRECTION (From): WIND SPEED: ___ _ (From MET Computer) (DEGREES) (MPH) Sectors D WE RECOMMEND EVACUATION AS FOLLOWS 0 WE RECOMMEND SHELTERING AS FOLLOWS EC Initials (Approval to Transmit ICMF) Dist.-Miles NOTE: Radiological Release is defined as: Plant Effluent>
Tech Spec Limit of 2.42E+05 µCi/sec Noble Gas or 2. lE+Ol µCi/sec 1-131. SGS Rev. 01