ML18177A193

From kanterella
Revision as of 07:23, 25 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Comment (24) of Albert Gomez on Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4
ML18177A193
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/21/2018
From: Antonio Gomez
- No Known Affiliation
To:
Rules, Announcements, and Directives Branch
References
83FR23726 00024, NRC-2018-0101
Download: ML18177A193 (8)


Text

PUBLIC SUBMISSION Docket: NRC-2018-0101 As of: 6/22/18 2:19 PM Received:

June 21 , 2018 Status: Pending_Post Tracking No. lk2-93ur-3w3b Comments Due: June 21, 2018 Submission Type: Web Turkey Point Nuclear Plant Units 3 and 4 SUNS! Review Complete Template= ADM-013 Comment On: NRC-2018-0101-0001 E-RIDS=ADM-03 Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4 ADD~ Yvonne Edmonds , Eric Oesterie Document:

NRC-2018-0101-DRAFT-0024 Comment on FR Doc # 2018-10806 Name: Albert Gomez Address: 3566 Vista Court Miami , FL, 33133 Email: albert@icassemblies.com Submitter Information General Comment LaShawnna Lewis, Benjamin Beasley COMMENT (24) PUBLICATION DATE: 5/22/2018 CITATION#

83 FR 23726 Within the attached file , there are 10 contentions detailed with related requests that explain why the current Turkey Point Nuclear Plant , Units 3 & 4 Initial Lice nse Renewal Application should be withheld, withdrawn and rejected by the NRC. UNI T ED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFIC E OF NUCLEAR REACTOR REGULATION , PETITION TO INTERVENE ON RENEWED FACILITY OPERATING LICENSE NOS. DPR-31 , DPR-41 DOCKET ID NRC-2018-0074 Turkey Point Nuclear Power Plant , Unit 3 and Unit 4 PROPOSED PETITION TO INTERVENE UNDER 10 C.F.R. 103 Introduction of Petitioner Albert Gomez Miami , FL. 33133 Nature of the Petitioner right under U.S. Nuclear Regulatory Commission (NRC): U.S. Citizen and resident of the City of Miami , Florida III. Nature of the Petitioner interest under U.S. Nuclear Regulatory Commission (NRC): Citizen of the U.S.,

Home owner , business owner , resident of Miami , FL USA , sitting City of Miami Sea Level Rise Committee member , manufacturing and technology expert supporting many industries including the power industry , ecological activist and conservationist, resilience leader and advisor in South Florida IV. PETITIONERS CONCERNS:

Turkey Point Nuclear Power Plant (TPNPP) Unit 3 , and Unit 4 (Docket No. DOCKET ID NRC-2018-0074 License No. NPF-XX) Turkey Point Nuclear Plant , Units 3 & 4 Initial License Renewal Application

  • Concerns listed on attached PDF. I will include my ending statement here. In closing , if the above stated comments to reach to the measure of withholding , withdrawing , rejecting or contestation of the current Turkey Point Nuclear Plant , Units 3 & 4 License Renewal Application , please consider extension of the current public comments period for further illumination by the public and municipal authorities related to FPLs continued operation and relicensing of Turkey Point Nuclear Plant , Units 3 & 4. Thank you for your thoughtful consideration of time to ensure the safe use of radioactive materials for beneficial civilian purposes while protecting people and the environment.
  • Supplemental page included below -It is an excerpt of the NRC approval notice for Turkey Point Reactor , unit 6 & unit 7 COLA , in support of clarifying FPLs current stance on sea level rise projection related to Turkey Point Nuclear Power Plant operations. These assumptions were also included in the current Turkey Poin t Nuclear Plant , Units 3 & 4 License Renewal Application.

Attachments DOCKET ID NRC-2018-0074 Albert Gomez Comments UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION , PETITION TO INTERVENE ON RENEWED FACILITY OPERATING LICENSE NOS. DPR-31 , DPR-41 DOCKET ID NRC-2018-0074 Tu r key Point Nuclear Power Plant , Unit 3 and Unit 4 PROPOSED PETITION TO INTERVENE UNDER 1 0 C.F.R. 103 I. I ntroduction of Pet i t i oner Albert Gomez Miami , FL. 33133 II. Nature of the Petitioner right under U.S. Nuclear Regulatory Commission (NRC): U.S. Citizen and resident of the City of Miam i, Flo r ida Ill. Nature of the Petit i oner interest under U.S. Nuclear Regulatory Commission (NRC): C i tizen of the U.S., Home owner , business owner , resident of Miami , FL USA , s i tting City of Miami Sea Level Rise Committee member , manufacturing and technology expert supporting many industries including the power industry , ecological activist and conservationist , resilience leader and advisor in South Florida IV. PETITIONERS CONCERNS:

Turkey Point Nuclear Power Plant (TPNPP) Unit 3 , and Unit 4 (Docket No. DOCKET ID NRC-2018-0074 License No. NPF-XX) Turkey Point Nuclear Plant , Units 3 & 4-lnitial License Renewal Application 1-The application in question has only been ava i lable to the public since March 21st , 2018. Closing the public comments period within 93 days of the first public posti n g does not reasonably accommodate the public with adequate review of the license renewal application and accompanying EIS & SEIS. 1 a. Based on Petitioners concernsSection IV. No. 1 , The Petitioner request that an extension to public comments be allowed in order to reasonably accommodate public comment. 2-The application in question has only been available to the public since March 21st , 2018. There are current municipal board & committee motions in process within City of Miami in support of an extension to the public comment period and to enable a formal response by the City of Miami. These motions are scheduled to be docketed into City of Miami Commission agenda after the public comment period closes. The compressed and shortened public comment period does not reasonably accommodate the City of Miami with a formal response to the Turkey Point Nuclear Reactor Powe r Plant Unit 3 , a n d Unit 4 I nitial License Renewal Application. 2a-Based on Petitioners concernsSection I V. No. 2 , The Petitioner request that an extension to public comments be allowed in order to reasonably accommodate the City of Miami Commission with an opportunity to review the active motion related to Turkey Point Nuclear Plant , Units 3 & 4 -Initial License Renewal Application , and comment if its rules i n favo r of entering said comment.

3-Since metallurgical failure would pose significant environmental disaster , the petitioner is including concerns related to metallurgical safety review within public comments.

Within the metallurgical analysis section 10 CFR 54.21, it states (c), such that there is reasonable assurance

-fatigue flaw growth analyses that are based on cyclical loading assumptions

and (e) fracture mechanics analyses that are based on cycle-based loading assumptions. If the current application renewal process is advance prior to qualification of said assumptions and critical metallurgical analysis , such analysis will not be complete , nor val i dated as certain. This will leave in question any Quality Assurance that metallurg i cal embr i ttlement will not exceed acceptable levels, it will also leave in question whether the Structural integrity of critical operating member such as the reactor vessel and base decisions on unfulfilled assumptions. By putting the license renewal process ahead of the metallurgical aging study , FPL could expose the public to undue hardship and high uncerta i nty. If the vessel were to fracture based on metallurgical failure , it would result in catastrophic failure of reactor 3 or 4 and expose the public, the environment, two national parks and its water supply to severe harm , extreme radiological contaminat i on and force localized evacuation , retreat and abandonment of a 50 mile radius around the facility.

3a-Based on Petitioners concernsSection IV. No. 3 , The Petitioner request that any Turkey Point Nuclear Plant , U n its 3 & 4 -License Renewal Applications be withheld and withdrawn until said metallurgical analys i s is completed by FPL and reviewed by a third party certified metallurg i cal analysis firm. 4-Th e cooling canals we r e mandated by the federal government and are current l y required to maintain safe operating temperature within Turkey Point Reactors 3 & 4. FPL has currently entered into a env i ronmental clean up agreement with Miami-Dade County via the Department of Environmental Resource Management for c l ean up of the permeating and leaking cooling canals. These cooling canals are leaking a host of caustic poisonous chemicals and highly saline waste water into our water supply , already affecting wells and permeating into our aquifer. FPL within the agreement has put forward a clean up regime which has not been qual i fied. Said clean up regime has already been reviewed by several outside scientific bodies and institutions and has shown to be unsatisfactory and non-efficacious for the desired results. To date , there is no qualified clean up methodology , nor has the clean commenced. 4a-Based on Petitioners concernsSection IV. No. 4 , T he Petit i oner request that any Turkey Point Nuclear Plant , Units 3 & 4 -License Renewal Applications be withheld and withdrawn until the current clean up of the poisonous and high salin i ty plume is completed and a pre-determined non-pollution probationary time frame be set before any existing or future renewal applications be accepted similar to other federal r egulatory agencies such as the FDA and EPA. 4b. Based on Petitioners concernsSection IV. No. 4 and Based on the poisonous and high salinity plume and clean-up methodologies in question , The Petitioner request that any Turkey Point Nuclear Plant , Units 3 & 4 -License Renewal App li cations be withheld and withdrawn until any law suits related to potential clean water act violations stated within ongoing FPL law suits related to said plume and pollution violation be settled prior to acceptance of any existing or future renewal applications.

5-FPL within the Turkey Point Nuclear Plant, Units 3 & 4 -License Renewal Application states that the reason for fast tracking the current License Renewal Application within the SEIS appendix states that , they are submitting said application and requesting a fast tracking based assumptions that the planning process for replacing the current power production at Turkey Point Nuclear Plant , Units 3 & 4 would require 10 years and since the current license ends in 2032 and 2033 respectively the need to start planning now for replacement power solutions for Turkey Point Nuclear Plant , Units 3 & 4. Within FPL's 8.2 Alternative Energy Sources review they do not include solar nor wind power in their analysis.

Also as a function of holding a sole utility power supplier status within South Florida and following standard best business practices, continuity and risk planning is something that is a common business practice and an ongoing business continuity process and does not cease or begin at the end of life of critical reactor operations, therefore applying an inconsistent business practice and unqualified assumption.

Sa-Based on Petitioners concernsSection IV. No. 5, The Petitioner request that any Turkey Point Nuclear Plant , Units 3 & 4 -License Renewal Applications be withheld and withdrawn, until a complete Alternative Energy Sources analysis is completed and included within any existing or future license renewal application.

6-During the public comment meeting at Homestead related to Turkey Point Nuclear Plant , Units 3 & 4 -License Renewal Application revelations were identified that FPL may renew a request for uprating of Turkey Point Nuclear Plant , Units 3 & 4. During the last uprating, FPL was required to submit an emergency use authorization to operate the plant in excess of the safe maximum operating temperature.

There are no assurances that this temperature exceedance past the safe operating temperature will not occur again , if any current or future Turkey Point Nuclear Plant , Units 3 & 4 -License Renewal Application(s) is approved and an uprating accepted.

6a-Based on Petitioners concernsSection IV. No. 6, The Petitioner request that any Turkey Point Nuclear Plant, Units 3 & 4 -License Renewal Applications be withheld and withdrawn based on the risk of further expanding the poisonous and high salinity plume and potential putting the public in danger by operating Turkey Point Nuclear Plant, Units 3 & 4 beyond safe operating temperatures stated in the operating Manuels and operating guidelines for the Westinghouse reactors found at Turkey Point Nuclear Plant , Units 3 & 4. 7-Within the current EIS , GEIS and SEIS and related supplements and appendixes , the NRC states that: I can't say we have I a lot of experience that we can draw on in terms of issues that were triggered by the content of I the application.

-our inspection activities are derived from plant operating experience , It also states that the GEIS conclusion is that the impact is of SMALU a J significance (except for collective offsite radiological impacts from the fuel cycle and high-level waste. and spent fuel, which were not assigned a single significance level). These statements highlight and expose the a gap in certainty within the NRC related to operating a reactor beyond its original design life. It also highlights that the NRC may not be incorporating the latest government authorized sea level rise projections and how that impacts its high level waste and spent fuel onsite storage. 7a-Based on Petitioners concernsSection IV. No. 7 , The Petitioner request that any Turkey Point Nuclear Plant, Units 3 & 4 -License Renewal Applications be withheld and withdrawn based on the egregious misrepresentation and shear lack of local governing sea level rise projections within FPL's current Turkey Point Nuclear Plant, Units 3 & 4 -License Renewal Application.

8-Within the current EIS , GEIS and SEIS and related supplements and appendixes , the NRC states that:(a) Environmental effects are not detectable or are so minor that they will neither destabilize nor noticeably alter any important attribute of the resource.

This is stated while a federal law suit is in play related to potential EPA violations , an increasing plume migrates and expands both easterly and westerly from the current position threatening both our water supply and our federally protected bay. Ba-Based on Petitioners concernsSection IV. No. 8 , The Petitioner request that any Turkey Point Nuclear Plant, Units 3 & 4 -License Renewal Applications be withheld and withdrawn based on the above NRC statement being in contradiction with current environmental facts and pollution performance at Turkey Point Nuclear Plant , Units 3 & 4; and said contradictions must be reconciled within a new supplemental EIS related to new resource and environmentally threats and conditions related to the operations of Turkey Point Nuclear Plant , Units 3 & 4. 9-Turkey Point is currently in negotiation with Miami-Dade related to water required to recharge the current cooling canals to a low enough temperature to maintain the cooling function. This process is still under negotiation and the waste water option has already been put in question based on the fears that the waste water discharge may negatively impact Miami-Dade

's Consent Order placed on them by the EPA to reduce phosphorus and other caustic compounds into the bay and our water supply. FPL is also require to take any excess ground water to cool the canals. This conflict based on the open nature of the cooling canals systems creates a critical unknown to continued safe operations of the plant. 9a-Based on Petitioners concernsSection IV. No. 9 , The Petitioner request that any Turkey Point Nuclear P l ant , Units 3 & 4 -License Renewal Applications be withheld and withdrawn unt i l the water demand issue is resolved between Dade and FPL for safe operation of the plant without further threatening our bay or drinking and agricultural water supply. 10-FPL within the Turkey Point Nuclear Plant , Units 3 & 4 -License Renewal Application states utilizes a 1" sea level rise projection through 2100, similar to their stated projection within their COLA submission fo rTurkey Point Nuclear Plant , unit 6 & unit 7. Their stated conservatism on sea level rise projections of 1 foot through 2100 directly contradict the UN's IPCC-lntergovernmental Panel on Climate Change, the USACE-US Army Corp. of Engineers and NOAA-National Oceanic and Atmospheric Administration

's sea level rise yr. 2100 projections of 31", 61" and 81" respectfully.

FPL's stated projection also contradict the Southeast Florida Regional Climate Change Compact's standard projections, which Miami-Dade is a current consignee. FPL fails to meet federal standards based on their renewal application

's stated projections, which use 10 year old tidal gauges and do not include the most recent tidal gauge data. Therefore, FPL does not follow the POANHI -Process for Ongoing Assessment of Natural Hazard Information

-SECY-15-0137 part of the Post-Fukushima Near-Term Task Force Recommendations 2.2(R2.2). Whereas , this mandated framework known as POAHNI-Process for Ongoing Assessment of Natural Hazard Information requires any such operator of a Westinghouse reactor, such as the ones found at both Fukushima and Turkey Point , must ensure that staff proactively and routinely aggregates an assesses new natural hazard information. 1 Oa-Based on Petitioners concernsSection IV. No. 10 , The Petitioner request that any Turkey Point Nuclear Plant , Units 3 & 4 -License Renewal Applications be withheld , withdrawn and contested due to the contradictions with stated federal and local guidelines , sea level rise projections and nuclear safety recommendations within the POANHI -Process for Ongoing Assessment of Natural Hazard Information

-SECY-15-0137 part of the Post -Fukushima NearTerm Task Force Recommendations 2.2(R2.2). In closing , i f the above stated comments to reach to the measure of withholding , withdrawing , rejecting or contestation of the current Turkey Po i nt Nuclea r Plant , Units 3 & 4 -License Renewal Application , please consider extension of the current public comments period for further illumination by the public and municipal authorities related to FPL's continued operation and relicensing of Turkey Point Nuclear Plant , Units 3 & 4. Thank you for your thoughtful conside r ation of time to ensure the safe use of radioactive materials for beneficial civilian purposes while protecting people and the environment.

  • Supplemental page included below -I t i s an excerpt of the NRC approval notice for Turkey Point Reactor , unit 6 & unit 7 COLA , i n support of clarifying FPL's current stance on sea level rise projection related to Turkey Point Nuclear Power Plan t operations. These assumptions were also i ncluded in the current Turkey Point Nuclear Plant , Units 3 & 4 -License Renewal Application.

[End Comments]

1-----~-----al2flCI nl "" """'111

  • nd d ""'1drQ b 11 BlilM Za ar L.awiw nd. "' l'hll ... '-*pori,,d e 6ill'ld ll'l~lmiilUJ ll.1'11 ~C:-