NRC 2012 Annual Assessment Presentation
ML13101A143
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/10/2013
From:
NRC/RGN-III
To:
References
Download: ML13101A143 (23)


Text

NRC's Annual Assessment of Perry Reactor Oversight Process

- 2012 Nuclear Regulatory Commission

- Region III Painesville, OH April 10, 2013

Opening Cynthia Pederson Deputy Regional Administrator, RIII 2

3 Our Mission To license and regulate the nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment

4 Agenda Introduction National Nuclear Plant Performance Summary Perry Plant Performance Results FENOC Response and Remarks NRC Closing Remarks Break NRC Available for Public Questions

5 National Summary Status as of 12/31/2012 Licensee Response Column 1 83 Regulatory Response Column 2 16 Degraded Cornerstone Column 3 3 Multiple/Repetitive Degraded Cornerstone Column 4 1 Unacceptable Column 5 0 0350 Oversight 1 Total 104 6 Significance Threshold Performance Indicators Green: Only Baseline Inspection White: Increases NRC Oversight Yellow: Increases NRC Oversight Red: Increases NRC Oversight Inspection Findings Green: Very Low Safety Issue White: Low to Moderate Safety Issue Yellow: Substantial Safety Issue Red: High Safety Issue

7 2012 Annual Assessment January 1

- December 31, 2012 Perry operated safely Two substantive cross

-cutting issues were closed in August 2012 Annual Assessment The NRC conducted a supplemental 95002 inspection of radiation protection The NRC decided to keep Perry in Column 3 8 2012 Supplemental 95002 Inspection Inspection focus was occupational radiation safety There were no issues with public radiation safety 9

2012 Supplemental 95002 Inspection The objectives of the inspection were to provide assurance that:

-the causes of the events were understood

-the extent of the issues were identified

-corrective actions would prevent repetition

-safety culture was evaluated 10 2012 Supplemental 95002 Inspection Results Perry's corrective actions had weaknesses Consequently, the NRC could not complete its review of the extent of the issues 11 Deviation from the ROP (2013)

Deviation -Keep Perry in Column 3; not move it to Column 4 Basis -Perry operated safely

-Other NRC inspections indicated that performance issues were limited to radiation protection Conditional

-Continued acceptable performance

-Successful supplemental 95002 inspection 12 NRC Actions In 2013 Additional NRC inspectors are at Perry during the current refueling outage A continuation of the supplemental 95002 inspection is planned for June 2013 The inspection will assess Perry's actions to address the previous corrective action weaknesses and assess the extent of issues 13 14 FENOC's Response and Remarks FirstEnergy Nuclear Operating Company

Closing Remarks Cynthia Pederson Deputy Regional Administrator, RIII 15 Break 16 17 Open to the Public The NRC places a high priority on keeping the public and stakeholders informed of its activities At www.nrc.gov, you can:

-Find public meeting dates and transcripts

-Read NRC testimony, speeches, press releases, and policy decisions

-Access the agency's Electronic Reading Room to find NRC publications and documents

18 Contacting the NRC Report an emergency

-301-816-5100 (call collect)

Report a safety concern

-800-695-7403 -Allegation@nrc.gov General information or questions

-www.nrc.gov

-Select "What We Do" for Public Affairs

19 NRC Representatives Viktoria Mitlyng, Office of Public Affairs, RIII

-630-829-9662 Prema Chandrathil, Office of Public Affairs, RIII

-630-829-9663 Michael Kunowski, Branch Chief, RIII

- 630-829-9618 Mark Marshfield, Senior Resident Inspector, Perry

- 440-259-3610 Jim Nance, Resident Inspector, Perry

- 440-259-3610 20 Reference Sources Reactor Oversight Process

-http://www.nrc.gov/NRR/OVERSIGHT/ ASSESS/index.html Public Electronic Reading Room

-http://www.nrc.gov/reading

-rm.html NRC Information Digest

-http://www.nrc.gov/reading

-rm/doc-collections/nuregs/staff/sr1350/

Public Document Room

-800-397-4209 (Toll Free)

NRC Social Media Channels Blog: http://public

-blog.nrc-gateway.gov/

Flickr: http://www.flickr.com/photos/nrcgov/

Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov RSS: http://www.nrc.gov/public

-involve/listserver.html#rss 21 Actions in Response to the Japan Nuclear Accident Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan

-info.html Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov Office of Public Affairs Point of Contact:

OPA.resource@nrc.gov or 301-415-8200 22 23 Questions/Comments