Perry Nuclear power Plant End of Cycle Meeting April 4, 2005

Introduction Richard Anderson Vice President, Perry Nuclear Power Plant

  • Perry Continues to Operate Safely
  • Recognize The Need for Improved Performance
  • 2004 Investments for Long-Term Safe and Reliable Operation
  • Include Intrusive Reviews of Processes and Performance
  • Coordinate Improvement Effort Through the Performance Improvement Initiative Perry Nuclear Power Plant April 4, 2005 2

Perry Management is Committed to Effective Implementation of the Corrective Action Program Fred von Ahn Director, Site Operations

  • Strong Actions Taken
  • Results Achieved
  • Areas of Focus
  • Sustained Performance Improvement Perry Nuclear Power Plant April 4, 2005 3

Engaged Workforce -

A Key to Performance Improvement Fred vonAhn Director, Plant Operations

  • Organizational Alignment
  • Fixing Identified Issues
  • Human Performance
  • Training To Improve Performance Perry Nuclear Power Plant April 4, 2005 4

Improving Plant and Equipment Reliability Tom Lentz Director, Engineering Top Equipment Reliability Issues

  • Refueling Systems
  • Hydrogen Water Chemistry System Perry Nuclear Power Plant April 4, 2005 5

Improving Plant and Equipment Reliability Tom Lentz Director, Engineering

  • Diesel Generator Exhaust Redesign
  • Electrical Circuit Breakers

Perry is Committed to Sustained Improvement Tom Lentz Director, Engineering Equipment Improvements

  • Fuel Reliability
  • Rod Control and Information System
  • Containment Heat Removal
  • Diesel Generator Fuel Oil Storage Capacity Operability Determinations and Technical Rigor Perry Nuclear Power Plant April 4, 2005 7

Performance Improvement Initiative-Road Map for Continued Improvement Ed Root Manager, Performance Improvement Initiative

  • Status of Major Elements
  • Results Achieved
  • Initiative is a Dynamic Document Perry Nuclear Power Plant April 4, 2005 8

Perry Oversight FENOC Quality Assessment I KNOW BECAUSE I LOOKED Neal Bonner Manager, Fleet Oversight

  • Oversight Improvement Plan
  • DB Lessons Learned Utilized
  • Intrusively Assessing Perry Performance
  • Improving and Sustainable Performance Perry Nuclear Power Plant April 4, 2005 9

Summary Richard Anderson Vice President, Perry Nuclear Power Plant

  • Safe Operation is our first priority
  • Continue to improve our plant, processes, and people Perry Nuclear Power Plant April 4, 2005 10