ML050940413
| ML050940413 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/04/2005 |
| From: | FirstEnergy Nuclear Operating Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML050940413 (11) | |
Text
Perry Nuclear power Plant End of Cycle Meeting April 4, 2005
Perry Nuclear Power Plant April 4, 2005 2
Introduction Richard Anderson Vice President, Perry Nuclear Power Plant
- Perry Continues to Operate Safely
- Recognize The Need for Improved Performance
- 2004 Investments for Long-Term Safe and Reliable Operation
- Include Intrusive Reviews of Processes and Performance
- Coordinate Improvement Effort Through the Performance Improvement Initiative
Perry Nuclear Power Plant April 4, 2005 3
Perry Management is Committed to Effective Perry Management is Committed to Effective Implementation of the Corrective Action Program Implementation of the Corrective Action Program Fred von Ahn Director, Site Operations
- Strong Actions Taken
- Results Achieved
- Areas of Focus
- Sustained Performance Improvement
Perry Nuclear Power Plant April 4, 2005 4
Engaged Workforce -
A Key to Performance Improvement
- Organizational Alignment
- Fixing Identified Issues
- Human Performance
- Training To Improve Performance Fred vonAhn Director, Plant Operations
Perry Nuclear Power Plant April 4, 2005 5
Improving Plant and Equipment Reliability Tom Lentz Director, Engineering Top Equipment Reliability Issues
- Emergency Service Water System
- Feedwater Digital Control System
- Refueling Systems
- Hydrogen Water Chemistry System
Perry Nuclear Power Plant April 4, 2005 6
Improving Plant and Equipment Reliability Tom Lentz Director, Engineering
- Diesel Generator Exhaust Redesign
- Low Pressure Core Spray System
- Electrical Circuit Breakers
Perry Nuclear Power Plant April 4, 2005 7
Perry is Committed to Sustained Improvement Tom Lentz Director, Engineering Equipment Improvements
- Fuel Reliability
- Alternate Decay Heat Removal System
- Control Rod Drive Hydraulic System
- Rod Control and Information System
- Containment Heat Removal
- Diesel Generator Fuel Oil Storage Capacity Operability Determinations and Technical Rigor
Perry Nuclear Power Plant April 4, 2005 8
Performance Improvement Initiative-Road Map for Continued Improvement
- Status of Major Elements
- Results Achieved
- Initiative is a Dynamic Document Ed Root Manager, Performance Improvement Initiative
Perry Nuclear Power Plant April 4, 2005 9
Perry Oversight
- Oversight Improvement Plan
- DB Lessons Learned Utilized
- Intrusively Assessing Perry Performance
- Improving and Sustainable Performance Neal Bonner Manager, Fleet Oversight FENOC Quality Assessment I KNOW BECAUSE I LOOKED
Perry Nuclear Power Plant April 4, 2005 10 Summary Richard Anderson Vice President, Perry Nuclear Power Plant
- Safe Operation is our first priority
- Continue to improve our plant, processes, and people
Perry Nuclear power Plant End of Cycle Meeting April 4, 2005