NRCs Annual As s es s ment of Perry Reactor Overs ight Proces s - 2012 Nuclear Regulatory Commis s ion - Region III Paines ville, OH April 10, 2013
Opening Cynthia Peders on Deputy Regional Adminis trator, RIII 2
3 Our Mis s ion To licens e and regulate the nations civilian us e of byproduct, s ource, and s pecial nuclear materials to ens ure adequate protection of public health and s afety, promote the common defens e and s ecurity, and protect the environment
4 Agenda
- Introduction
- National Nuclear Plant Performance Summary
- Perry Plant Performance Res ults
- FENOC Res pons e and Remarks
- NRC Clos ing Remarks
- Break
- NRC Available for Public Ques tions
5 National Summary Status as of 12/31/2012
- Licens ee Res pons e Column 1 83
- Regulatory Res pons e Column 2 16
- Degraded Corners tone Column 3 3
- Multiple/Repetitive Degraded Corners tone Column 4 1
- Unacceptable Column 5 0
- 0350 Overs ight 1
Total 104
6 Significance Thres hold Performance Indicators Green:
Only Bas eline Ins pection White:
Increas es NRC Overs ight Yellow: Increas es NRC Overs ight Red:
Increas es NRC Overs ight Ins pection Findings Green:
Very Low Safety Is s ue White:
Low to Moderate Safety Is s ue Yellow: Subs tantial Safety Is s ue Red:
High Safety Is s ue
7 2012 Annual As s es s ment J anuary 1 - December 31, 2012
- Perry operated s afely
- Two s ubs tantive cros s -cutting is s ues were clos ed in Augus t
2012 Annual As s es s ment
- The NRC conducted a s upplemental 95002 ins pection of radiation protection
- The NRC decided to keep Perry in Column 3 8
2012 Supplemental 95002 Ins pection
- Ins pection focus was occupational radiation s afety
- There were no is s ues with public radiation s afety 9
2012 Supplemental 95002 Ins pection
- The objectives of the ins pection were to provide as s urance that:
- the caus es of the events were unders tood
- the extent of the is s ues were identified
- corrective actions would prevent repetition
- s afety culture was evaluated 10
2012 Supplemental 95002 Ins pection Res ults
- Perrys corrective actions had weaknes s es
- Cons equently, the NRC could not complete its review of the extent of the is s ues 11
Deviation from the ROP (2013)
- Deviation
- Keep Perry in Column 3; not move it to Column 4
- Bas is
- Perry operated s afely
- Other NRC ins pections indicated that performance is s ues were limited to radiation protection
- Conditional
- Continued acceptable performance
- Succes s ful s upplemental 95002 ins pection 12
NRC Actions In 2013
- Additional NRC ins pectors are at Perry during the current refueling outage
- A continuation of the s upplemental 95002 ins pection is planned for J une 2013
- The ins pection will as s es s Perrys actions to addres s the previous corrective action weaknes s es and as s es s the extent of is s ues 13
14 FENOCs Res pons e and Remarks Firs tEnergy Nuclear Operating Company
Clos ing Remarks Cynthia Peders on Deputy Regional Adminis trator, RIII 15
Break 16
17 Open to the Public
- The NRC places a high priority on keeping the public and s takeholders informed of its activities
- At www.nrc.gov, you can:
- Find public meeting dates and trans cripts
- Read NRC tes timony, s peeches, pres s releas es,
and policy decis ions
- Acces s the agencys Electronic Reading Room to find NRC publications and documents
18 Contacting the NRC
- Report an emergency
- 301-816-5100 (call collect)
- Report a s afety concern
- 800-695-7403
- Allegation@nrc.gov
- General information or ques tions
- www.nrc.gov
- Select What We Do for Public Affairs
19 NRC Repres entatives
- Viktoria Mitlyng, Office of Public Affairs, RIII
- 630-829-9662
- Prema Chandrathil, Office of Public Affairs, RIII
- 630-829-9663
- Michael Kunows ki, Branch Chief, RIII
- 630-829-9618
- Mark Mars hfield, Senior Res ident Ins pector, Perry
- 440-259-3610
- J im Nance, Res ident Ins pector, Perry
- 440-259-3610
20 Reference Sources
- Reactor Overs ight Proces s
- http://www.nrc.gov/NRR/OVERSIGHT/
ASSESS/index.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- NRC Information Diges t
- http://www.nrc.gov/reading-rm/doc-collections /nuregs /s taff/s r1350/
- Public Document Room
- 800-397-4209 (Toll Free)
NRC Social Media Channels
- Flickr: http://www.flickr.com/photos /nrcgov/
- Twitter: https ://twitter.com/#!/nrcgov
- YouTube: http://www.youtube.com/us er/NRCgov
- RSS: http://www.nrc.gov/public-involve/lis ts erver.html#rs s 21
Actions in Res pons e to the J apan Nuclear Accident
- Actions in res pons e to J apan Nuclear Accident Webs ite: http://www.nrc.gov/japan/japan-info.html
- Mailbox for comments on s taff actions :
J LD_Public.Res ource@nrc.gov
- Office of Public Affairs Point of
Contact:
OPA.res ource@nrc.gov or 301-415-8200 22
23 Ques tions /Comments