ML070040051

From kanterella
Revision as of 07:56, 25 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Onconee Nuclear Station, Summary of December 12, 2006, to Discuss the Use of Fiber-Reinforced Polymer (TAC Nos. MD22129, MD2130, MD2131)
ML070040051
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/09/2007
From: Olshan L N
NRC/NRR/ADRO/DORL/LPLII-1
To:
Olshan L N, NRR/DORL, 415-1419
Shared Package
ML070080446 List:
References
TAC MD2129, TAC MD2130, TAC MD2131
Download: ML070040051 (4)


Text

January 9, 2007LICENSEE:DUKE POWER COMPANY LLC (DUKE)

FACILITY:OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)

SUBJECT:

SUMMARY

OF DECEMBER 12, 2006, MEETING TO DISCUSS THE USE OFFIBER-REINFORCED POLYMER (FRP) AT OCONEE (TAC NOS. MD2129, MD2130, AND MD2131)On December 12, 2006, the Nuclear Regulatory Commission (NRC) met with Duke (thelicensee) to discuss the June 1, 2006, license amendment request to incorporate the use of FRP at Oconee to protect against the effects of tornado winds and differential pressure. is a list of the attendees. Enclosure 2 is the handout provided by the licensee at the meeting and is available in the Agencywide Documents Access and Management System (ADAMS) Accession Number ML070080416.The licensee stated that it does not intend to conduct its own testing on FRP, but instead isrelying on testing that had been performed by others. The licensee briefly discussed six test programs that had been performed and that the licensee believes are relevant to the use of FRP at Oconee.In response to concerns raised by the NRC staff during the meeting, the licensee agreed toprovide the following:1.A list of all Oconee masonry walls on which the licensee currently plans to use FRP,including wall geometries, boundary (support) conditions, and methods of construction.2.A description of the analytical methods that will be used to evaluate masonry walls andto design modifications using FRP. The basic analytical methods will consist of:(a)Computing internal forces/moments that will result from tornado-induceddifferential pressure and/or tornado wind loadings on the masonry wall and considering the wall to act as either a simply-supported, one-way span or as a simply-supported plate based on actual wall construction;(b)Determining actual and allowable stresses in the masonry walls in accordancewith American Concrete Institute (ACI) ACI 531-79; and,(c)Designing the necessary FRP composite reinforcement based on methodsderived from, or verified by, test data.3.A clarification of the licensee's intention to use International Code Council ICC AC125(June 2003) for qualification testing and reporting for the FRP composite system's material properties only.

Duke-2-The NRC requested that the licensee provide the methodology and the results of somerepresentative calculations. The NRC stated that after it approves this methodology, this methodology would be applicable only to those types of masonry walls for which the licensee has submitted a request and the NRC staff approves for use at Oconee. /RA/Leonard N. Olshan, Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287

Enclosures:

1. List of Attendees
2. Licensee's Handout (ML070080416)cc w/encls: See next page Duke-2-January 9, 2007The NRC requested that the licensee provide the methodology and the results of somerepresentative calculations. The NRC stated that after it approves this methodology, this methodology would be applicable only to those types of masonry walls for which the licensee has submitted a request and the NRC staff approves for use at Oconee. /RA/Leonard N. Olshan, Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287

Enclosures:

1. List of Attendees
2. Licensee's Handout (ML070080416)cc w/encls: See next pageDistribution
PUBLICRidsOgcRpRJackson LPL2-1 R/FRidsAcrsAcnwMailCenterSLane RidsNrrDorlLpl2-1 (EMarinos)R. Jasinski, NRRJMa RidsNrrPMLOlshan (hardcopy)S. Lee, EDO Rgn II RidsNrrLAMO'Brien (hardcopy)RidsRgn2MailCenter (MErnstes)Accession Number: ML070040051OFFICELPL2-1/PMLPL2-1/LALPL2-1/BCNAMELOlshan:ncMO'BrienEMarinosDATE 1/9/20071/8/20071/9/2007 OFFICIAL RECORD COPY MEETING ATTENDEESMEETING TO DISCUSS USE OF FIBER-REINFORCED POLYMER AT OCONEEDECEMBER 12, 2006 NRC DUKER. JacksonC. DavisS. LaneR. Freudenberger J. MaL. Llibre L. OlshanS. NewmanOTHERE. Fyfe, Fyfe CompanyZ. Smith, Fyfe Company D. Holmes, Fluor Corporation Oconee Nuclear Station, Units 1, 2, and 3 cc:

Mr. Bruce H. HamiltonVice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672Ms. Lisa F. VaughnAssociate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202Manager, LISNUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035Senior Resident InspectorU.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672Mr. Henry Porter, DirectorDivision of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708Mr. Michael A. SchoppmanFramatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209Mr. B. G. DavenportRegulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672Mr. Leonard G. GreenAssistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602Mr. R. L. Gill, Jr.Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202Division of Radiation ProtectionNC Dept of Environment, Health, & Natural

Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721Mr. Peter R. Harden, IVVP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210Mr. Henry BarronGroup Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006Mr. Charles BrinkmanDirector, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852Ms. Kathryn B. NolanSenior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202