ML063320222

From kanterella
Jump to navigation Jump to search

Forthcoming Meeting with Duke Power Company LLC, to Discuss the Use of Fiber-Reinforced Polymer
ML063320222
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/30/2006
From: Olshan L
NRC/NRR/ADRO/DORL/LPLII-1
To: Marinos E
NRC/NRR/ADRO/DORL/LPLII-1
Olshan L N, NRR/DORL, 415-1419
References
TAC MD2129, TAC MD2130, TAC MD2131
Download: ML063320222 (6)


Text

November 30, 2006 MEMORANDUM TO: Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Leonard N. Olshan, Project Manager /RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH DUKE POWER COMPANY LLC REGARDING OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 DATE & TIME: Tuesday, December 12, 2006 10:00 a.m. - 12:30 p.m.

LOCATION: U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike, Room T-3B25 Rockville, Maryland PURPOSE: To discuss the use of fiber-reinforced polymer (TAC Nos. MD2129, MD2130, and MD2131)

CATEGORY 1:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

MEETING CONTACTS: Leonard N. Olshan, NRR John F. Stang, NRR 301-415-1419 301-415-1345 lno@nrc.gov jfs2@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

E. Marinos PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC DUKE R. Jackson, NRR R. Freudenberger J. Ma, NRR S. Newman L. Olshan, NRR L. Llibre C. Davis Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda (ADAMS ML063320222) cc w/encl: See next page November 30, 2006

E. Marinos PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC DUKE R. Jackson, NRR R. Freudenberger J. Ma, NRR S. Newman L. Olshan, NRR L. Llibre C. Davis Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda (ADAMS ML063320222) cc w/encl: See next page Distribution:

PUBLIC RidsNrrPMLOlshan (hard copy) RidsNrrAdro LPL2-1 R/F RidsNrrLAMOBrien (hard copy) RidsNrrDorl RidsOpaMail RidsNrrDorlLpl2-1 (Emarinos) PMNS R. Jasinski, NRR R. Jackson, NRR J. Ma, NRR O. Tabatabai, NRR RidsOgcMailCenter K. Clark, OPA Region II RidsRgn2MailCenter RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN) (hard copies)

S. Lee, EDO Region II Accession Number: ML063320222 OFFICE LPL2-1/PM LPL2-1/LA LPL2-1/BC NAME LOlshan/nc MOBrien EMarinos DATE 11 /30/2006 11/30/2006 11/30/2006 OFFICIAL RECORD COPY

MEETING WITH DUKE POWER COMPANY LLC, TO DISCUSS USE OF FIBER-REINFORCED POLYMER REGARDING OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 DECEMBER 12, 2006 AGENDA 10:00 a.m. - 10:15 a.m. Introductions and purpose of the meeting 10:15 a.m. - 10:30 a.m. Brief description of natural phenomenon barrier system modifications 10:30 a.m. - 11:00 a.m. Proposed use of fiber-reinforced polymer system 11:00 a.m. - 12:00 noon Discuss Dukes proposed response to NRCs draft request for additional information 12 noon - 12:30 p.m. Closing remarks 12:30 p.m. Adjourn

Oconee Nuclear Station, Units 1, 2, and 3 cc:

Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr.

Associate General Counsel and Managing Manager - Nuclear Regulatory Attorney Issues and Industry Affairs Duke Energy Carolinas, LLC Duke Power Company LLC 526 South Church Street - EC07H 526 S. Church St.

Charlotte, North Carolina 28202 Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation Division of Radiation Protection 2650 McCormick Dr., 3rd Floor NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035 Resources 3825 Barrett Dr.

Senior Resident Inspector Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway Mr. Peter R. Harden, IV Seneca, SC 29672 VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director 6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St. Mr. Henry Barron Columbia, SC 29201-1708 Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman P.O. Box 1006-EC07H Framatome ANP Charlotte, NC 28201-1006 1911 North Ft. Myer Dr.

Suite 705 Mr. Charles Brinkman Rosslyn, VA 22209 Director, Washington Operations Westinghouse Electric Company Mr. B. G. Davenport 12300 Twinbrook Parkway, Suite 330 Regulatory Compliance Manager Rockville, MD 20852 Oconee Nuclear Site Duke Energy Corporation Mr. Bruce H. Hamilton ON03RC Vice President, Oconee Site 7800 Rochester Highway Duke Power Company LLC Seneca, SC 29672 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green Assistant Attorney General Ms. Kathryn B. Nolan NC Department of Justice Senior Counsel P.O. Box 629 Duke Energy Carolinas, LLC Raleigh, NC 27602 526 South Church Street - EC07H Charlotte, NC 28202