ML071350102

From kanterella
Revision as of 22:41, 23 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
05/02/2007 Meeting Handout on RB Tendon/Iwe/Iwl Inspection
ML071350102
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/02/2007
From:
SCANA Corp, South Carolina Electric & Gas Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML071350102 (5)


Text

RB Tendon/IWE/IWL Inspection:

Turbine Low Pressure Rotor Inspection:

RF-16 Emergent Activities Failed Fuel:

  • Identified Assembly via In Mast Sipping

and Visual Inspection

  • Cause Determined to be Baffle Jetting
  • Installed Clips to Prevent Recurrence
  • Perform Upflow Modification in RF-18 Upflow Conversion:DownflowConfigurationUpflowConfigurationNew flow hole Plug