Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML17305B0681990-09-17017 September 1990 Forwards Response to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Exam Dates,Anticipated Number of Candidates & Requalification Exam Schedules for FY91-FY94 Also Encl ML17305B0491990-09-12012 September 1990 Forwards Palo Verde Nuclear Generating Station Unit 2 Steam Generator Eddy Current Exam,Second Refueling Outage Apr 1990. ML17305B0281990-08-27027 August 1990 Forwards fitness-for-duty Semiannual Performance Rept for Period of Jan-June 1990,per 10CFR26.71(d) ML17305B0111990-08-15015 August 1990 Responds to Request for Addl Info Re Emergency Lighting,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25. Availability Info Provided in Ref 2,most Appropriate Analysis of Lighting Sys Availability ML17305B0021990-08-0909 August 1990 Provides Update on Status of Record 546 post-restart Item, Per 900412 Ltr.Record Will Revise Procedures for Analyzing & Disseminating Incident Investigation,Operations & Maint Experience to Appropriate Dept ML17305A9871990-08-0303 August 1990 Forwards Rev 1 to Abb Impell Rept 01-1658-1815, Emergency Lighting Independent Review, Per Insp Repts 50-528/90-25, 50-529/90-25 & 50-530/90-25 ML17305A9791990-07-31031 July 1990 Forwards, Conceptual Design for Palo Verde Nuclear Generating Station for Diverse Auxiliary Feedwater Actuation Sys (Dafas) for Review.Schedule of Implementation as Indicated ML20056A4161990-07-31031 July 1990 Forwards Revised Security Plan Implementing Procedures.Encl Withheld (Ref 10CFR2.790) ML17305A9831990-07-27027 July 1990 Requests Temporary Waiver of Compliance from Limiting Condition for Operation 3.6.3 to Allow Corrective Maint to Be Performed on Main Feedwater Isolation Valves by Extending Allowed Outage Time to 12 H Instead of 4 H ML20055J2671990-07-25025 July 1990 Forwards Info Constituting Decommissioning Financial Assurance Certification Rept,Per 10CFR50.33(k)(2) & 50.75(b) ML17305A9771990-07-25025 July 1990 Forwards Status of Corrective Actions to Min Multiple Control Element Assembly Drop Events at Plant.Insp of Insulation Coils & Replacement of Defective Coils for Units 1 & 2 Completed ML20055J1031990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances ML20055J1711990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances for Plant,Per 10CFR50.75(b) & 50.33(k)(2) ML17305A9411990-07-20020 July 1990 Forwards Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. ML17305A9431990-07-17017 July 1990 Forwards Rev 1 to Palo Verde Nuclear Generating Station Annual Radiological Environ Operating Rept for 1987. Rev Results from Internal Review Bu Nuclear Safety Group & Audit Performed by Radiation Protection Stds ML17305A9601990-07-13013 July 1990 Forwards Preliminary Response Re Justification for Continued Operation of Fire Protection Sys Equipment,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25 ML17305A9331990-07-12012 July 1990 Discusses Util Compliance w/fitness-for-duty Program Implementation.Lab Specialists,Inc Audited & Monitored W/ Satisfactory Results.Ltr of Agreement Has Been in Place Since 900202 ML17305A9391990-07-0909 July 1990 Forwards Endorsement 44 to Maelu Policy MF-116 & Endorsement 62 to Nelia Policy NF-266 ML17305A9341990-07-0909 July 1990 Submits Results of 900514-18 NUREG-1220 Audit,Per NRC 900608 Request,Per Insp of Plant.Remaining Licensed Operators Found to Be in Conformance W/Medical Exam Requirements of 10CFR50.55 ML17305A9151990-06-29029 June 1990 Forwards Emergency Lighting Failure Data Update,Per 900621 Request ML17305A9061990-06-26026 June 1990 Suppls 891114 Response to Violations Noted in Insp Rept 50-528/89-16.Application for Amend to License NPF-41 Will Be Submitted in Oct 1990 to Permit Lower Flow Rate for RCS & Shutdown Cooling Sys ML17305A9111990-06-25025 June 1990 Responds to Generic Ltr 90-04, Status of Implementation of Generic Safety Issues. ML17305A9081990-06-25025 June 1990 Forwards Schedule Reiterating Util Plans for Implementation of USIs A-9 & A-44 & Provides Current Forecast Refuel Dates ML17305A9051990-06-25025 June 1990 Forwards Endorsement 45 to Maelu Policy MF-116 & Endorsement 63 to Nelia Policy NF-266 ML17305A9121990-06-24024 June 1990 Forwards Discharge Test Voltage Curve,Per 900623 Request for Completion of Emergency Lighting Exide Power Supply Prior to Entry Into Mode 2 ML17305A9171990-06-24024 June 1990 Confirms Compliance W/Agreed Upon Course of Action for Restart of Facility as Outlined in 891224 Ltr & Completion of Items Contained in Restart List Provided as Attachment to 900111 Ltr ML17305A8961990-06-20020 June 1990 Responds to NRC 900521 Ltr Re Violations Noted in Insp Repts 50-528/90-12,50-529/90-12 & 50-530/90-12.Corrective Action: Wiring in PPS Cabinets & Cabinet Drawers Reworked in Accordance W/Approved Work Authorization Documents IR 05000528/19900021990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite ML17305A9041990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite ML17305A8891990-06-15015 June 1990 Informs NRC That post-restart Items Due Prior to Scheduled Restart Have Been Completed on Schedule W/Listed Exceptions ML17305A8871990-06-14014 June 1990 Advises That Fuel Pool Cooling & Cleanup Procedures Being Restructured,Per Response to Violations in Insp Repts 50-528/89-36 & 50-530/89-36 ML17305A8731990-06-0808 June 1990 Responds to Bulletin 88-005 Re Product Forms Other than Fittings & Flanges for Plant.Significant Number of Lugs Delivered to Plant.Util Should Be Notified,If NRC Previous Review of Records Has Identified Other Product Forms ML17305A9421990-06-0101 June 1990 Forwards Pinnacle West Response to State of Az Corp Commission Complaint Filed W/Us Securities & Exchange Commission on 900521,to Revoke Exemption from Public Utils Holding Co Act ML17305A8391990-05-31031 May 1990 Forwards 1990 Reactor Containment Bldg Integrated Leak Rate Test,Final Rept. ML17305A8571990-05-31031 May 1990 Forwards Amended Pages of Feb,Mar & Apr 1990 Monthly Operating Repts for Palo Verde Nuclear Generating Station Unit 2 ML17305A8661990-05-31031 May 1990 Forwards Projected 1990 Cash Flow Statements ML17305A8201990-05-23023 May 1990 Provides Status of Improvements to Eliminate Possibility of Multiple Control Element Assembly Drop Events.Licensee Developed Mod to Ground Fault Detection Sys to Assure Continuous Monitoring & Annunciation of Any Future Faults ML20043B6421990-05-19019 May 1990 Forwards Amend 26 to Security Plan.Amend Withheld (Ref 10CFR2.790(d) & 10CFR73.21) ML17305A7841990-05-15015 May 1990 Forwards Special Rept 2-SR-90-002 Re Steam Generator Tube Plugging Due to Inservice Insp Activities.Twenty Tubes Plugged in Steam Generator 1 & ninety-one Tubes Plugged in Steam Generator 2 ML17305A8721990-05-14014 May 1990 Forwards Arizona Corp Commission Complaint Filed W/Us Securities & Exchange Commission Seeking Revocation or Mod of Exemption of Pinnacle West Capital Corp.Complaint Wholly W/O Merit ML17305A7621990-05-11011 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Repts 50-528/90-03,50-529/90-03 & 50-530/90-03.Corrective Actions: Night Order Written for Guidance on Use of Instrumentation W/Maint Tag Present ML17305A7921990-05-0808 May 1990 Forwards Public Version of Rev 2 to EPIP-14, Dose Assessment. W/900523 Release Memo ML20043A0511990-05-0303 May 1990 Forwards Public Version of Revised Epips,Including Procedure Change Notice 11 to Rev 12 to EPIP-04 & Procedure Change Notice 1 to Rev 6 to EPIP-15 ML17305A7421990-05-0303 May 1990 Responds to 900330 Enforcement Conference Re Violations Noted in Insp Repts 50-528/90-04,50-529/90-13 & 50-530/90-13.Corrective Action:Special Locking Mechanisms Installed on Currently Posted Radiation Area Doors & Gates ML17305A8861990-04-30030 April 1990 Forwards EPIP Update,Including Rev 7 to EPIP 02,Rev 12 to EPIP 03 & Rev 9 to EPIP 20.W/o Encl ML17305A7381990-04-30030 April 1990 Forwards Annual Environ Operating Rept for 1989 & Annual Rept for Salt Deposition Monitoring Program 1989. ML17305A7131990-04-20020 April 1990 Responds to NRC 900321 Ltr Re Violations Noted in Insp Rept 50-530/90-08.Corrective Action:Plant Guideline Providing Addl Guidance Re Prioritization of Work Promulgated ML17305A6891990-04-16016 April 1990 Forwards Rev to Cycle 3 Reload Analysis Rept,Submitted 891024.Rev Reflects Early end-of-cycle Unit Shutdown & Replacement of Eight New Fuel Assemblies ML17305A7011990-04-12012 April 1990 Forwards Rev 3 to Palo Verde Nuclear Generating Station Post-Restart Actions, Per JB Martin 891224 Ltr ML17305A7081990-04-0909 April 1990 Forwards post-exam Security Agreements for Dk Hendrick, D Ensign,M Alavi & Author.Agreement Certifies That Signatories Will Not Divulge Info Re 900320 Exams 1990-09-17
[Table view] |
Text
I®ULATOR~NFORMATION DISTRIBUTION TEM (RIBS)ACCESSION NBR:8202160569 DOC~DATE: 82/02/10 NOTARIZED:
YES DOCKET FACIL:STN 50-528 Palo Verde Nuclear Station<Unift 1i Arjzona Publi 05000528 STN 50 529 Palo Verde Nuclear Station~Unitt 2g Arizona Publi 05000529 STN 50<<'530 Palo Verde Nuclear Station<Unit.3i Arizona Publi 05000530 AUTH, NAME AUTHOR AFFILIATION VAN BRUNT~E~E~Arizo'na Public Servic'e Co, RECIP,NAME RECIPIENT AFFILIATION NIRAGLI A E F o'A~Licensing Branch 3 r
SUBJECT:
Forwards r esponse to 820112.comments on NUREG-08All IDES for facilities, DISTRIBUTION CODE::C0028 COPIES"RECEIVED:L'TR J ENCL]SIZE: TITLE: Environ~Comments.-
NOTES:Standardized Plant~1 cy':C Grimes Standardized-Plant.1 cy".C Grimes Standardized Plant~1 cy!C Grimes 05000528 05000529 05000530 RECIPIENT ID"CODE/NAME ACTION: LIC BR 43 BC 06 KERRIGANg J~01 INTERNAL: ELD NRR/DE/AEAB 20 NRR/DE/HGEB
'21 NRR/DS I/AEB 19 NRR/DS1/RAB 17'COPIES LTTR ENCL 7 7 1 1 1.0 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME ANL IE 13 NRR/DE/EEB 16 NRR/DE/SAB 18 NRR/DS I/ETSB 15 04 COPIES LTTR ENCL 1 2 2 1 1.1 1 1 1 1 1 EXTERNAL: ACRS NATL LAB NSIC 21 05 1 0.5'5 1 1 LPDR NRC PDR NTIS 03 02 1 1 1 1 1 1'ar ,TOT'AL NUMBER OF COP I REQUIRED o L'TTR~ENCL grrq(rrsI l 1 r~>>n h f t (~i h h Pl~~$k~'>>lh$f eh I>>'!I h>>)I>>>>h hI')'t a Q*STA.,,,;82021695g9 8POP>'O".tPDR;.'~DOC~
OOOO~l IKlDinscl mmmvsotls mmrmmwmv P.o.BOX 21666-PHOENIX, ARIZONA 85036 February 10, 1982 ANPP-20126
-JMA/JRM Mr.Frank A.Miraglia, Chief Licensing Branch No.3 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 Sob)eat: Review.ot Comments on Draft Environments Statement, Palo Verde Nuclear Generat I, Station, (PVNGS)Units 1, 2 and 3 File: 82-056-026 G.l.10 a
Reference:
Letter, Frank Miraglia to E.E.Van Brunt, Jr.dated January 12, 1982
Dear Mr.Miraglia:
Our responses to the comments forwarded to us in the referenced letter are attached.We also received copies of additional comments on February 4, 1982 and we understand still more comments are expected from three state agencies.We will forward our responses to these additional comments as soon as possible.Thank you for the opportunity to respond.Very truly y urs, C3-(A E.E.Van Brunt, Jr.APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/JRM/av Attachment cc: M.Licitra P.L.Hourihan R.L.Greenfield A.C.Gehr CIAO esI S~l
~~J', j l I J It I I STATE OF ARIZONA))sate COUNTY OF MARICOPA)I, Edwin E.Van Brunt, Jr., represent that I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.W'(Edwin E.Van Brunt, Jr.Swore to before me tbfe~O day of 1982.My Commission expires: Notary Public he
~~t', 1 n V 1*-!r~~rr tp We have no responses respecting the comments submitted by the Bureau of Radiological Health of the U.S.Department of Health and Human Services, Region Nine of the Federal Highway Administration of the U.S.Department of Transportation and Ms.Janet D.Mitchell to the Draft Environmental Statement related to the Operation of Palo Verde Nuclear Generating Station Units 1, 2 and 3 (NUREG-0841)(hereinafter"DES").Respecting the comment of the Arizona Game and Fish Department that it has not I f abandoned any wildlife project and is continuing to use its commitment of 7,300 acre-feet of sewage effluent, we consider that a modification of the DES f" is appropriate.
Confusion in this area is not surprising since Buckeye Irrigation Company'and the Buckeye Water Conservation and Drainage District claim a prior right to all water, including effluent, in the Salt and Gila River channels (see FES-CP, pages A-62 to A-64)and the Arizona Game and Fish Department is not currently pursuing its application to appropriate 7,300 acre-feet of water in the Salt River.The Department also commented that"any significant reduction in the riparian communities along this stretch (meaning Segment B on Figure 4-4 of the DES or 91st Avenue to Buckeye Heading)of the Gila River will create substantial adverse impacts to the wildlife that depend on this habitat." The statement that a reduction in riparian communities will impact wildlife is perhaps incontestable, but it avoids the real facts that show the diversion of effluent for Palo Verde Nuclear Generating Station (PVNGS)will not result in a significant reduction in riparian communities.
The facts are that using the conservative t I l j 1 Page 2 (i.e., low)COE-EPA projections, flows from the 91st Avenue Plant in 1986 (the"worst" year)will be 118,000 acre-feet (see Table 5.1 of the DES).Assuming that during such year 64,100 acre-feet of such flows are diverted for PVNGS use (an unlikely assumption since commercial operation of Unit 3 is not scheduled until May, 1986)and 30,000 acre-feet are diverted for delivery to the Buckeye Irrigation Company canal via the effluent pipeline, effluent discharges from the 91st Avenue Plant into the Salt River would amount to 24,000 acre-feet.
In addition, there would be 17,000 acre-feet of inflow from upstream sources, i.e., principally from the 23rd Avenue Plant (see Table 3.6-3 of U.S.Department of Interior, Fish and Wildlife Service Final Environmental Impact Statement on Clearing of Phreatophytic Vegetation from the Salt and Gila Rivers, Ninety-First Avenue to Gillespie Dam, dated December, 1981).In'ummation,,under the most conservative projections, there would be a total flow of 41,000 acre-feet in the Salt River in 1986 to support down-stream riparian communities.
The referenced table adopted by U.S.Fish and Wildlife Services (and not challenged in any way by comments of the Arizona Game and Fish Department) shows that the evapotranspiration of the total phreatophytic growth in the entire segment of the Salt and Gila Rivers from the 91st Avenue to the Buckeye Heading (i.e., Segment B)was only 11,900 acre-feet and groundwater recharge only 3,300 acre-feet in 1976).The conclusion is inescapable, therefore, that the flows in this segment of the rivers will be two to three times more than that required to support the vegetation needed for the riparian communities 1!)l t 1;f 1 l 1 i I Page 3 that have become established there.Consequently, it is improper to conclude or imply that wildlife dependent upon such habitat will be adversely affected.With respect to the comments submitted by Ms.Sharon Harrington, we offer the following responses:
1.The second and third paragraphs of Ms.Harrington's letter are of such a general nature that no specific answer can be made.The DES in its entirety does indeed address the social and economic costs involved with the operation of PVNGS.The effects of disposal of all radioactive wastes, including plutonium-230, are addressed in Section 5.10 and Appendix G of the DES, and the likeliness and con-sequences of accidents are discussed at great length in Section 5.9.2 (pages 5-30 to 5-60)and Appendices E and F of the DES.In the absence of a clear statement of specific objections to the analyses and evaluations in the DES, no responses are possible.2.The statements and innuendos in the third paragraph of Ms.Harrington's letter are incorrect and misleading.
First, the source of condenser cooling water for PVNGS is wastewater effluent from the regional 91st Avenue Sewage Treatment Plant, as the DES makes abundantly clear (see Sections 4.2.3, 4.2.8, 4.3.2.7, 5.3.1.1 and 5.5.1.2).Second, the reuse of wastewater effluent for electric generation conserves potable surface water and groundwater.
Third, APS has effectively pursued water conservation measures with significant effort and cost and has J i I 1 I 1 l I I I I))l Page 4 reduced its cooling water.requirements by 20-25%(see Section 4.2.3 of the DES).Fourth, APS'equests for water from the Central Arizona Project (CAP), which have been pending for a number of years, have no relation to the operation of PVNGS.In fact, the allocations of CAP water recommended by the Arizona Department of Water Resources contemplate that no CAP water will be made available for electric generation utnil 2005.3.Ms.Harrington's fifth paragraph implies that PVNGS is situated on 4,000 acres"of the National Palo Verde Forest." Nothing could be more fanciful.As the DES makes clear, PVNGS is situated on land foimerly under agricultural cultivation.(See DES, Section 4.3.1.2 and Appendix A, pages A-37 and A-47).If there is a"National Palo Verde Forest," it certainly is not in the vicinity of PVNGS (see DES, Section 4.2 and FES-CP, Sections 2.1, 4.1 and 5.1).4.Ms.Harrington's sixth paragraph lists seven concerns which, Ms.Harrington states,"the NRC needs to address." The simple answer is that APS and NRC have addressed these concerns.With respect to tornadic winds, see FES-CP, Section 2.6.3 and NRC Safety Evaluation Report-CP Stage (SER-CP and SER-OL), Sections 2.3 and 3.3 and by the NRC regulations, 10 CFR Part 50, Appendix A, Criterion 4.With respect to the crossing of the Hassayampa by the effluent pipeline, see DES, Section 4.2.8.With respect to the intense suruner heat, the concern J I)J i I f l I Page 5 apparently is safety-related, rather than environmental-related and has been addressed in the applicants'SAR, Sections 2.3.1 and the SER-CP and SER-OL Section 2.3, and by the NRC regulations, 10 CFR Part 50, Appendix A, Criterion 2.The concern respecting emergency communication facilities has been addressed in the applicants'n-site emergency plan and in the State of Arizona radiological emergency plan which will be reviewed by both FEHA and NRC (see DES, Sections 5.9.2.4 (3)).The statement respecting 3-1/2 hours of primary cooling water is inaccurate; and the subject is dealt with in the NRC'Staff's (CESSAR and PVNGS)Safety Evaluation Report Operating.
License Stage (SER-OL), Section 6.3 (ECCS).The record of Bechtel Power Corporation is excellent as demonstrated by the number of successful nuclear plants with which it has been engaged as engineer and/or constructor.
The qualifications of Bechtel were reviewed by the AEC at the construction permit stage (see SER-CP, Section 17.3 (QA).The environmental impacts of the uranium fuel cycle, including uranium mining and milling, are addressed in the DES, Section 5.10 and Appendix G.The rights of specific Indian tribes respecting the development of specific uranium resources are properly the subject of environmental statements that are required in connection with any such proposed development.
They are not matters for appropriate discussion in the PVNGS DES since the uranium sources for PVNGS are not restricted to"Indian lands, let alone any particular reservation.
j~1 J I 1 1 1)!I l I l 1 t l II 1~
Page 6 5.The final comment of Ms.Harrington relates to restrictions imposed upon her participation in a meeting held by a subcommittee of the Advisory Committee on Reactor Safeguards (ACRS)in Phoenix on November 23 and 24, 1981.It is correct that the ACRS subcommittee chairman did state that such meeting was not the proper forum for general public comments, but, nonetheless, Ms.Harrington was per-mitted to make a public statement to the subcommittee.
In response to Ms.Harrington's last comment and inquiry, it must be acknowledged that the licensing process is both very complex and perplexing.
At the same time it must also be stated that the entire process is open and public.All meetings and hearings are preceded by published notices.Local public document rooms are maintained as depositories of all submittals by applicants and the NRC staff.NRC proceedings are conducted in accordance with published rules and regulations in much the same manner as judicial proceedings.
The entire licensing process has received the repeated and continuing oversight of Congress and its several committees.
The short of it seems to be that the preservation of constitutional rights of"due process," with all of the complex, legal procedures which such preser-vation entails, sometimes seems to get in the way of simple, straight-forward solutions.
The same also can be said of other guaranteed constitutional rights, such as the freedom of religion and speech.If there is a way to simplify the NRC licensing process and make it more direct, meaningful and expeditious, APS will support it.
Page 7 The foregoing responses to Ms.Harrington's comments are applicable also to the nearly similar comments of Myron L.Scott, and no fur'ther responses appear warranted.
In response to the comments of John F.Doherty relating to the effects of releases of radon-222, primarily resulting from the mining and milling of uranium, the matter has been the subject of prolonged and exhaustive investi-gations and studies in several other licensing proceedings as indicated in Appendix G to the DES.The upshot of such investigations and studies is that the health effects of radon-222 released from uranium mining and milling constitute only a very small fra:tion (about one-tenth thousandths to one-fifty thousandths) of the health effects from natural-background radon-222 emissions.
Under such circumstances, further research and studies would not be productive.