ML17342A593

From kanterella
Revision as of 11:49, 14 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test,Turkey Point Plant Unit 4.
ML17342A593
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 06/24/1986
From: WOODY C O
FLORIDA POWER & LIGHT CO.
To: DENTON H
Office of Nuclear Reactor Regulation
Shared Package
ML17342A594 List:
References
L-86-262, NUDOCS 8606270291
Download: ML17342A593 (4)


Text

4 ACCESS IQN NBR: 8606270291 DQC.DATE: 86/06/24 NOTAR I ZED: NQ DOCKET 0 FACIL: 50-251 Turkeg Point Plant Unit 4 Florida Power and Light C 05000251 AUTH.NANE AUTHOR AFFILIATION WOODY>C.O.Florida Power 8c Light Co.REClP.NANE RECIPIENT AFFILIATION DENTON>H.Office of Nuclear Reactor Regulation>

Director (post 851125

SUBJECT:

Forwards"Reactor Containment Bldg Integrated Leakage Rate Test>Types A>B Zc C Periodic Test>Turkey Point Plant Unit 4." tC/>>DISTRIBUTI E: D COPIES RECEIVED: LTR ENCL SI ZE: TITLE: QR ubmittal: Append J Containment Leak Rate Testing NOTES: REC lP l ENT ID CODE/NANE PWR-*ADTS PWR-*EICSB PWR-A PD2 LA I IcDONALD, D PWR-A RSB INTERNAL: ADN/LFNB NRR BWR ADTS NRR PWR-B ADTS NRR/DSRO/RSlB RGN2 COPIES LTTR ENCL 1 2 2 0 1 1 1 0 1 1 1 1 1 RECIPIENT ID CODE/NANE PWR-A EB PWR-A FOB PWR-A PD2 PD 01 PWR-A PSB ELD/HDS4 08 NRR PWR-A ADTS NR IB 9 F IL 04 COP IES LTTR ENCL 1 5 5 1 EXTERNAL: LPDR NSIC 1 1 NRC PDR 02 TOTAL NUBBER OF COPIES REQUIRED: LTTR 26 ENCL 24 ll I P' i~9 Ibi 4'<FLORIDA POWER&LIGHT COMPANY Jgg 2 4 19M L-86-262 Office of Nuclear Reactor Regulation Attention:

Mr.Harold Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission IIVashington, D.C.20555

Dear Mr.Denton:

RE: Turkey Point Unit 0 Docket No.50-251 Reactor Containment Building Inte rated Leak Rate Test Enclosed please find the summary technical report of the Reactor Containment Building Integrated Leak Rate Test (ILRT)for Turkey Point Unit 0 as required by 10CFR50, Appendix 3.Very truly yours, C.O.V/oo Group V resident Nuclear Energy COIIV/SA V/eh Attachment cc: Dr.3.Nelson Grace, Region II Harold F.Reis, Esquire PNS-LI-86-201 SbOb270291 8b0b24 PDR ADOCK 05000251 p PDR pl t EPO:I PEOPLE...SERVING PEOPLE

~ll~t"~l" AJ 4 ph'T AC Jl C L