Forwards Jul 1989 Progress Summary of Select Sys Assessment, Per NRC 860812 Order
ML17347B264
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/14/1989
From: WOODY C O
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-288, NUDOCS 8908210190
Download: ML17347B264 (6)


Text

ACCELERATED DISH+UTION DEMONSTRA'gN SYSTEM~'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR-8908210190 DOC.DATE: 89/08/14 NOTARIZED:

NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION

'OODY,C.O.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Jul 1989 progress summary of select sys assessment, per NRC 860812 order.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR

+ENCL~SIZE: TITLE: OR Submittal:

General Distribution NOTES: RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DEST/ADS 7E NRR/DEST/ES B 8 D NRR/DEST/MTB 9H ,NRR/DOEA/TSB 11 REM"IL 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5 5 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEST/CEB 8H NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1'1 1 1 1 1 1%1 1 1 0 1 3.1 1 D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20 C

P.O.Box t4000, Juno Beach, FL 33408-0420 ZUGuST.Z 4 1989 L-89-288 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and4 Docket Nos.50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the July 1989 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.Very truly yours, C.O.Woody~Acting Senior Vice President-Nuclear COW/TCG/gp Attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 89082iOi9'0 8908i4 PDR ADOCK OS000250 R~PDC an FPL Group companY gyO t og~

SELECT SYSTEM REVIEW JULY 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS V Breaker List (IS Mod 1265)-Scheduled to be completed January 1991 P&ID's (IS Mod 1098)-Scheduled to be completed December 29, 1989 COMPREHENSIVE REVIEW BY SEG Unit 4 Closeout Report (IS Mod 8966)-Completed August 10, 1989.CONFIGURATION MANAGEMENT Unit 4 Drawing Follow Up (IS Mod 8968)-Scheduled completion October 9, 1989 (120 days following end of the recent Unit 4 Refueling Outage)MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement (IS Mod 519)-Scheduled completion during the'ext Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565)-Scheduled completion deferred until the next Unit 4 Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991 SELECT SYSTEM REVIEW JULY 1989 STATUS Page two ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P&ID's (IS Mod 1042)-Scheduled for completion during next Unit 3 Refueling Outage P&ID Update Schedule to be determined following walkdowns COMPREHENSIVE REVIEW BY SEG Phase II Review scheduled for completion by October 15, 1989 U C V