Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per 890605 Ltr
ML17348A420
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/20/1990
From: HARRIS K N
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17348A422 List:
References
L-90-247, NUDOCS 9007240100
Download: ML17348A420 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9007240100 DOC.DATE: 90/07/20 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light.C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION HARRIS,K.N.

Florida Power S Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards revised no significant hazards determination for proposed TS 1.17,per 890605 ltr.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution NOTES'OCKET 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5 5 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DOEA/OTS Bl 1 NRR/DST/SELB 8D NRR/DST/SRXB 8E C EM~G LE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE lVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19 II)

JUL 2 0$990 L-90-247 10 CFR 50.90 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Revised Technical S ecifications By letter L-89-201 dated June 5, 1989, Florida Power&Light Company (FPL)requested that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 be amended to replace the current Technical Specifications with Revised Technical Specifications.

Among the changes proposed in that letter were changes to current Technical Specifications (TS)1.4, 3.0.5 and the bases to 3.0.5.The changes are described in the No Significant Hazards Determination for Revised Technical Specification 1.17,"Definition-Operability," pages App.A 1-4 through App.A 1-7 of Attachment II to FPL letter L-89-201.Among the changes described is a relaxation in the time allowed for mode reduction from 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> (TS 3.0.1)to 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> in the event one emergency diesel generator (EDG)and an opposite train component are inoperable.

A review of the proposed Revised Technical Specifications included with the June 5, 1989 submittal indicated no such relaxation is, in fact, included in the Revised Technical Specifications, and that the time allowed for mode reduction in the event one EDG and an opposite train component are inoperable is the same (7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, in accordance with TS 3.0.3)as that allowed by the current TS 3.0.1.The relaxation in question referred to changes proposed by FPL in earlier revisions of the Revised Technical Specifications but not included in the Final Draft of the Revised Technical Specifications issued by the NRC to FPL by letters dated March 14, 1989 and May 12, 1989.A discussion of this relaxation was inadvertently included in the June 5, 1989 submittal.

The evaluation of a relaxation of the time allowed for mode reduction from 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> to 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> is not pertinent to the No Significant Hazards Determination for the revised technical specifications as submitted on June 5, 1989.The two paragraphs containing this evaluation are hereby removed from the No Significant Hazards Determination.

A revised No Significant Hazards Determination for the proposed TS 1.17 is attached.9007240i00 900720 PDR ADOCK 05000250 P PQC an FPL Group company goo///g

'Sir U.S.Nuclear Regulatory Commission L-90-247 Page two Should there be any questions, please contact us.Very truly yours, Vic Turk ar is resident Point Plant Nuclear JHG/TCG/gp Attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point.Plant Mr.Jacob Daniel Nash, Florida Department of Health and Rehabilitative Services

's I~